Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.1 LAccepted-AOC | ₹23.1 L Quoted ₹19.6 L | L1 | Accepted-AOC ACCEPTED AND AWARDED BY COMPETENT AUTHORITY |
| 2 | L2₹21.8 L+₹2.2 L (11.2%)Rejected-Finance AT PO REMUAN ARYAVIHAR HATATOTA TALCHER DIST ANGUL ODISHA 759100 | TALCHER | ANGUL | ODISHA | 759100 | ₹21.8 L+₹2.2 L (11.2%) | L2 | Rejected-Finance SINCE THE BIDDER IS NOT L1 |
| 3 | L3₹21.9 L+₹2.3 L (11.8%)Rejected-Finance AT PO DEULBERA WARD NO 10 TALCHER DIST ANGUL ODISHA 75910 | TALCHER | ANGUL | ODISHA | 75910 | ₹21.9 L+₹2.3 L (11.8%) | L3 | Rejected-Finance SINCE THE BIDDER IS NOT L1 |
| 4 | L4₹23.5 L+₹3.9 L (19.9%)Rejected-Finance A PO PAIKSA SAHI TALCHER TOWN DIST ANGUL ODISHA 759107 | TALCHER TOWN | ANGUL | ODISHA | 759107 | ₹23.5 L+₹3.9 L (19.9%) | L4 | Rejected-Finance SINCE THE BIDDER IS NOT L1 |
Tender Value
₹38.4 L
EMD Value
₹48,100
Closing Date
22 May 2026, 5:00 pmClosed
STAFF OFFICER (CIVIL), LINGARAJ AREA
SO (CIVIL), OFFICE OF THE GM, LINGARAJ AREA TALCHER, ANGUL_759102, ODISHA, INDIA
Repair and maintenance of Time office Premises and Renovation With modification works for rest shelter of supervisor staff at Lingaraj OCP, Lingaraj Area,
2026_MCL_359335_1
MCL/GM(LA)/e-Tender/ SO(C)/26-27/012 dt.09.05.2026
Open Tender
Civil Works - Buildings
Percentage
90 days
Lingaraj OCP
PLEASE REFER TENDER DOCUMENTS.
3 documents required · 3 mandatory
₹48,100
3 Sept 2026
12 May 2026
23 May 2026
12 May 2026
22 May 2026
12 May 2026
12 May 2026 - 15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Surface dressing of the ground including removing vegetation and in- equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil | 295.16 | SQM | 19.9 | ₹5,873.68 |
| 1.02 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | 40.86 | CUM | 217 | ₹8,866.62 |
| 1.03 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 8.59 | CUM | 910.15 | ₹7,818.19 |
| 1.04 | Providing and laying in position excluding cement concrete of level: specified grade the cost of centering and shuttering - All work up to plinth 1:4:8 (1 Cement : 4 coarse sand (zone-Ill) derived from natural sources: 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 2.44 | CUM | 4,826.85 | ₹11,777.51 |
| 1.05 | Providing and laying in position excluding cement concrete of level: specified grade the cost of centering and shuttering - All work up to plinth 1:2:4 (1 cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 66.99 | CUM | 6,048.05 | ₹4,05,158.87 |
| 1.06 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform | 44.42 | SQM | 645.05 | ₹28,653.12 |
| 1.07 | Brick work with Fly Ash Brick (230x115x75 mm size) bricks of class designation 10 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) | 11.07 | CUM | 5,457.4 | ₹60,413.42 |
| 1.08 | Brick work with Fly Ash Brick (230x115x75 mm size) bricks of class designation 10 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement : 6 coarse sand) | 87.82 | CUM | 6,667.75 | ₹5,85,561.8 |
| 1.09 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Stone/Boulder | 52.57 | CUM | 2,639 | ₹1,38,732.23 |
| 1.1 | 12 mm cement plaster of mix:1:6(1 cement: 6 fine sand) | 523.9 | SQM | 226.25 | ₹1,18,532.38 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.46 MB
Tendernotice_2.pdf
PDF • 1.34 MB
BOQ_372200.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .