Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 LAccepted-Finance | ₹7.6 L | L1 | Accepted-Finance Low bid |
| 2 | L2₹7.7 LRejected-Finance | ₹7.7 L | L2 | Rejected-Finance High bid |
| 3 | L3₹7.7 LRejected-Finance | ₹7.7 L | L3 | Rejected-Finance High bid |
Tender Value
₹9.0 L
Closing Date
27 Mar 2026, 10:00 amClosed
ADMINISTRATIV N GRAMPANCHAYATADHIKARWARDADE-HAWELI
GRAMPANCHAYATWARDADE-TAL-HAWELIDIST-POONA
PROVIDING UNDERGROUND-DRAINAGE LINE WORK FOR BHIMNAGAR(MAGASVARGIYWASTI) AT GRAMPANCHAYAT(DALITWASTI SUDHAR YOJNA)
2026_RDPUN_1288971_1
ETENDER/B1/26
Open Tender
Civil Works - Water Works
90 days
GRAMPANCHAYATWARDADE-TAL-HAWELIDIST-POONA
ZP REG UNEMPLOYED ENGINEER
4 documents required · 4 mandatory
₹236
Yes
Exempted
28 Mar 2026
20 Mar 2026
28 Mar 2026
20 Mar 2026
27 Mar 2026
20 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Item No.1 Excavation for foundation / pipe trenches in earth, soil of all types, sand, gravel and soft murum including removing the excavated material upto a distance of 50 M and lift upto 1.5 M. stacking and spreading as directed. Dewatering, showring and strutting, preparing the bed for the foundation etc. complete. | |||||
| 2Item No.2: Excavation for foundation / pipe trenches in hard murum and boulders, W.B.M. road including removing the excavated material upto a distance of 50 M with lift upto 1.5 M stacking as directed dewatering, showring, structing, preparing the bed for the foundation and excluding back filling | |||||
| 3Item No.3: Excavation for foundation / pipe trenches in hard rock by controlled blasting, including trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the area and lifts as below, normal dewatering, excluding backfilling, etc.complete. (Bd-A-5/259) | |||||
| 4Item No.4: Excavation for foundation / pipe trenches in hard rock and concrete road by chiselling, wedging, line drilling by mechanical means or by all means other than blasting including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, excluding backfilling, etc. complete by all means. (Bd-A-6/259). | |||||
| 5Item No.5: Providing murum bedding in trenches with approved murum from excavated materials from fiundations / trenches in 15 to 20 cm layers including watering and compaction, etc. complete. | |||||
| 6Item No.6: Providing at site of work ISI standard RCC NP-II pipes in standard lengths of following class and diameter suitable for either collar joints or rubber ring joints, including all taxes (Central and local), inspection charges, transport to departmental stores/site, unloading and stacking, etc. complete. 300 mm dia. MJP DSR 2023-24, Item No.1 d vii, Page No.109) | |||||
| 7Item No.7: Lowering, laying and jointing in proper grade and alinement RCC pipes cwith collar joints in CM 1:1 proportion or socketed RCC pipes with rubber joints (excluding cost of rubber ring or RCC collar), including cost of jointing materials, labour, givising hydraulic testing, etc. complete as directed by Engineer-in-charge. 300 mm dia. | |||||
| 8Item No.8: Providing and constructing on sewer, B.B. masonry circuiar manhole without conical shape excluding excavation RCC 1:2:4 proportion 20 cm bedding brick masonary in CM 1:4 proportion, 23 cm thick for 2 M depth from top 35 cm thick for 2 M below it and 45 cm thick for balance depth, RCC slab at top and at 2 M depth from top for supporting brick masonry above it, plastering with smooth finish in CM 1:2 proportion, C.C. 1:2:4 finishing channels in smooth rendering, providing C.I. dapuri type steps each weighing 5.5 kg.providing and fixing S.F.R.C. frame and co ver of 56 cm dia. at top including cost of all materials and labour, etc complete Circular- Depth upto 1.00 M | |||||
| 9Item No.9: Filling in plinth and floors / exavated trenches with available excavated stuff with soft material in 15 cm layer with all leads and lifts do etc. complete. | |||||
| 10Item No.10: Providing and laying in situ PCC M:150 (1:2:4) grades of cement concrete of trap / granite /quartzite / gneiss metal for foundition and bedding, including dewatering, form-work, compacting and curing, etc. complete. (for levelling course) | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.04 MB
Tendernotice_2.pdf
PDF • 0.52 MB
Tendernotice_3.pdf
PDF • 4.96 MB
Tendernotice_4.pdf
PDF • 0.14 MB
Tendernotice_5.pdf
PDF • 0.53 MB
BOQ_2216067.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid