Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹59.3 LAccepted-AOC | ₹59.3 L Quoted ₹50.3 L | L1 | Accepted-AOC Accepted as Techno Commercially Evaluated L1 Bidder |
| 2 | L2₹53.0 L+₹2.7 L (5.42%)Rejected-Finance | ₹53.0 L+₹2.7 L (5.42%) | L2 | Rejected-Finance Rejected as not L1 bidder |
| Sl No | Description | Qty | Unit | BINOD KUMAR SAHU L1 | M/s Anjali Construction L2 |
|---|---|---|---|---|---|
| 1.00 | Excavation of coal/shale in UG mine by chiseling in trenches and drains for making notches in gallery including stacking of serviceable material and unserviceable material with a lead up to 30mt.and lift up to 1.5mt. Including neat dressing of the roof floor and sides as per the instruction of the E.I.C. | 67.5 | m3 | 7,238.5 ₹4,88,598.75 Lowest | 7,630 ₹5,15,025 |
| 2.00 | Brick work 1:6 in foundation and plinth in class designation 50 bricks excluding carriage of material from incline mouth to the U/G mine site.Foundation | 22.5 | m3 | 7,022.29 ₹1,58,001.52 Lowest | 7,400 ₹1,66,500 |
| 3.00 | Brick work in super structure, above plinth level up to floor-2 level | 209.88 | m3 | 8,013.29 ₹16,81,829.31 Lowest | 8,450 ₹17,73,486 |
| 4.00 | Transporation(Track line lead =1-2 km, Manual lead = 0-50 mt.) | 232.38 | m3 | 8,216.34 ₹19,09,313.09 Lowest | 8,650 ₹20,10,087 |
| 5.00 | 12mm thick cement plaster 1:6 (1cement : 6 coarse sand) excluding carriage of materials from Incline mouth to the U/G mine site. | 659.51 | m2 | 399.92 ₹2,63,751.24 Lowest | 420 ₹2,76,994.2 |
| 6.00 | Transporation(Track line lead =1-2 km, Manual lead = 0-50 mt.) | 659.51 | m2 | 138.87 ₹91,586.15 Lowest | 150 ₹98,926.5 |
| 7.00 | Flooring of Substation, intermediate restshelter, first aid station, Urinals etc (PCC Work, 1:2:4) | 22 | m3 | 7,696.54 ₹1,69,323.88 Lowest | 8,100 ₹1,78,200 |
| 8.00 | Transportation for PCC Work (Track line head = 1-2 KM, Manual Lead = 0-50 mt) | 22 | m3 | 12,081.31 ₹2,65,788.82 Lowest | 12,800 ₹2,81,600 |
| 9.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - |
Tender Value
₹72.4 L
EMD Value
₹90,500
Closing Date
12 May 2026, 5:00 pmClosed
STAFF OFFICER MINING
Office of General Manager, Orient Area
Underground Construction of 60 Nos of Ventilation stoppings in proposed 34LN District (Sec-B), 35LS District (Sec-B), 19LS District (Sec-B), 29LS (Sec-C) and miscellaneous as where required at HBM of RSA
2026_MCL_358715_1
MCL/GM/OA/SOM/26/NIT293RT/2278
Open Tender
Civil Works - Others
Item Rate
180 days
HIRAKHAND BUNDIA MINES
Please refer tender documents
5 documents required · 5 mandatory
₹90,500
14 Aug 2026
24 Apr 2026
13 May 2026
27 Apr 2026
12 May 2026
27 Apr 2026
27 Apr 2026 - 5 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation of coal/shale in UG mine by chiseling in trenches and drains for making notches in gallery including stacking of serviceable material and unserviceable material with a lead up to 30mt.and lift up to 1.5mt. Including neat dressing of the roof floor and sides as per the instruction of the E.I.C. | 67.5 | m3 | 8,827.46 | ₹5,95,853.55 |
| 2 | Brick work 1:6 in foundation and plinth in class designation 50 bricks excluding carriage of material from incline mouth to the U/G mine site.Foundation | 22.5 | m3 | 8,563.78 | ₹1,92,685.05 |
| 3 | Brick work in super structure, above plinth level up to floor-2 level | 209.88 | m3 | 9,772.31 | ₹20,51,012.42 |
| 4 | Transporation(Track line lead =1-2 km, Manual lead = 0-50 mt.) | 232.38 | m3 | 10,019.93 | ₹23,28,431.33 |
| 5 | 12mm thick cement plaster 1:6 (1cement : 6 coarse sand) excluding carriage of materials from Incline mouth to the U/G mine site. | 659.51 | m2 | 487.71 | ₹3,21,649.62 |
| 6 | Transporation(Track line lead =1-2 km, Manual lead = 0-50 mt.) | 659.51 | m2 | 169.35 | ₹1,11,688.02 |
| 7 | Flooring of Substation, intermediate restshelter, first aid station, Urinals etc (PCC Work, 1:2:4) | 22 | m3 | 9,386.03 | ₹2,06,492.66 |
| 8 | Transportation for PCC Work (Track line head = 1-2 KM, Manual Lead = 0-50 mt) | 22 | m3 | 14,733.3 | ₹3,24,132.6 |
| 0.0 | Total impact of GST for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.46 MB
Tendernotice_2.pdf
PDF • 2.31 MB
BOQ_371590.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .