Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹77.9 CrAccepted-AOC 107 LAKHINARAYAN TALLA ROAD SHAMPUR HOWRAH 711103 | HOWRAH | HOWRAH | WEST BENGAL | 711103 | L1 | Accepted-AOC L1 | |
| 2 | L2₹14.1 Cr+₹12.0 L (0.85%)Rejected-Finance 328 U S COMPLEX 120 MATHURA ROAD OPP APOLLO HOSPITAL JASOLA DELHI 110076 | DELHI | SOUTH DELHI | DELHI | 110076 | L2 | Rejected-Finance L2 | |
| 3 | L3₹15.2 Cr+₹1.2 Cr (8.38%)Rejected-Finance 24 PARAGANAS NORTH BELGERIA KOLKATA 700056 WEST BENGAL KOLKATA WEST BENGAL 700056 | 24 PARAGANAS NORTH | WEST BENGAL | 700056 | L3 | Rejected-Finance L3 | |
| 4 | L4₹17.4 Cr+₹3.4 Cr (24.5%)Rejected-Finance 9TH FLOOR PRIMA BAY TOWER B GATE NO 5 SAKI VIHAR ROAD POWAI MUMBAI 400072 | MUMBAI | MUMBAI | MAHARASHTRA | 400072 | L4 | Rejected-Finance L4 | |
| 5 | Rejected-Technical | - | Rejected-Technical NONELIGIBLE |
| Sl No | Description | Qty | Unit | ITD CEMENTATION INDIA LIMITED L4 | Paras Railtech Private Limited L2 | Rahee Infratech Limited L1 | TEXMACO RAIL AND ENGINEERING LIMITED L3 |
|---|---|---|---|---|---|---|---|
| 1.00Design, Construction, Manufacturing, Supply, Installation, Testing and Commissioning of Ballastless Trackwork in Mainline from Dahisar East Station (Ch. 15194.260 m) to Bhayandar (Ch. 26435.0 m) including Third Track, Side Track & Dead End at Dahisar and Depot Entry / Exit Approach Track for Line-9 Corridor {Dahisar (E) to Bhayandar} of Mumbai Metro Rail Project of MMRDA, Mumbai | |||||||
| 1.01 | Schedule ‘A’ Design, Construction, Manufacturing, Supply, Installation, Testing and Commissioning of Ballastless Trackwork in Mainline from Dahisar East Station (Ch. 15194.260 m) to Bhayandar (Ch. 26435.0 m) including Third Track, Side Track & Dead End at Dahisar and Depot Entry / Exit Approach Track for Line-9 Corridor {Dahisar (E) to Bhayandar} of Mumbai Metro Rail Project of MMRDA, Mumbai.
In terms of Clause C2.5 & C2.6 of ITT, the rates shall be inclusive of all central/state /local taxes, duties, levies, cess, full Custom Duty and all other incidental charges etc. excluding GST | 1 | Lumpsum | 95,74,13,930 ₹17,23,34,507.4 | 77,32,49,357 ₹13,91,84,884.26 | 76,66,00,000 ₹13,79,88,000 Lowest | 83,18,25,162.3 ₹14,97,28,529.21 |
| 1.02 | Schedule ‘B’ (Provisional Sum) and concrete Bed for Stacking of Rails.
Bidder to quote amount as per volume 6 | 1 | Lumpsum | 1,19,38,613 ₹21,48,950.34 Lowest | 1,19,38,613 ₹21,48,950.34 Lowest | 1,19,38,613 ₹21,48,950.34 Lowest | 1,19,38,613 ₹21,48,950.34 Lowest |
Tender Value
₹88.3 Cr
EMD Value
₹1 L
Closing Date
19 May 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Director Works
7th Floor, MMRDA Office BKC Complex, Mumbai.
DESIGN CONSTRUCTION MANUFACTURING SUPPLY INSTALLATION TESTING AND COMMISSIONING OF BALLASTLESS TRACKWORK IN MAINLINE FROM DAHISAR EAST STATION TO BHAYANDAR INCLUDING THIRD TRACK SIDE TRACK AND DEAD END AT DAHISAR
2023_MMRDA_891060_1
MMRDA/L9/MMRP/CA-167
Open Tender
Civil Works - Others
Lump-sum
549 days
Mumbai
Please refer Tender documents.
8 documents required · 8 mandatory
₹11,800
₹1 L
Yes
MMRDA
27 May 2024
5 Apr 2023
22 May 2023
5 Apr 2023
19 May 2023
26 Apr 2023
5 Apr 2023 - 19 Apr 2023
17 Apr 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Design, Construction, Manufacturing, Supply, Installation, Testing and Commissioning of Ballastless Trackwork in Mainline from Dahisar East Station (Ch. 15194.260 m) to Bhayandar (Ch. 26435.0 m) including Third Track, Side Track & Dead End at Dahisar and Depot Entry / Exit Approach Track for Line-9 Corridor {Dahisar (E) to Bhayandar} of Mumbai Metro Rail Project of MMRDA, Mumbai | |||||
| 1.01 | Schedule ‘A’ Design, Construction, Manufacturing, Supply, Installation, Testing and Commissioning of Ballastless Trackwork in Mainline from Dahisar East Station (Ch. 15194.260 m) to Bhayandar (Ch. 26435.0 m) including Third Track, Side Track & Dead End at Dahisar and Depot Entry / Exit Approach Track for Line-9 Corridor {Dahisar (E) to Bhayandar} of Mumbai Metro Rail Project of MMRDA, Mumbai.
In terms of Clause C2.5 & C2.6 of ITT, the rates shall be inclusive of all central/state /local taxes, duties, levies, cess, full Custom Duty and all other incidental charges etc. excluding GST | 1 | Lumpsum | - | - |
| 1.02 | Schedule ‘B’ (Provisional Sum) and concrete Bed for Stacking of Rails.
Bidder to quote amount as per volume 6 | 1 | Lumpsum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_1552769.xls
BOQ Document • 0.24 MB
118408382.pdf
Tender Document • 0.12 MB
Volume1to4.pdf
Tender Document • 12.23 MB
1Volume5.pdf
Tender Document • 22.64 MB
2Volume5.pdf
Tender Document • 20.92 MB
Volume6.pdf
Tender Document • 0.19 MB
118408384.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .