| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹77.9 CrAccepted-AOC | ₹77.9 Cr Quoted ₹14.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹14.1 CrRejected-Finance 328 U S COMPLEX 120 MATHURA ROAD OPP APOLLO HOSPITAL JASOLA DELHI 110076 | DELHI | SOUTH DELHI | DELHI | 110076 | ₹14.1 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹15.2 CrRejected-Finance ADMINISTRATIVE BUILDING TEXMACO RAIL ENGINEERING LIMITED TEXMACO RAIL ENGINEERING LTD BELGHARIA KOLKATA 700056 NORTH 24 PARGANAS WEST BENGAL 700056 | 24 PARAGANAS NORTH | WEST BENGAL | 700056 | ₹15.2 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹17.4 CrRejected-Finance GODREJ WATERSIDE TOWER NO 1 OFFICE 803 8TH FLOOR PLOT NO 5 BLOCK DP SECTOR V SALT LAKE CITY KOLKATA 700091 | KOLKATA | KOLKATA | WEST BENGAL | 700091 | ₹17.4 Cr | L4 | Rejected-Finance L4 |
| 5 | Rejected-Technical | - | - | Rejected-Technical NONELIGIBLE |
Tender Value
₹88.3 Cr
EMD Value
₹1 L
Closing Date
19 May 2023, 6:00 pmClosed
Director Works
7th Floor, MMRDA Office BKC Complex, Mumbai.
DESIGN CONSTRUCTION MANUFACTURING SUPPLY INSTALLATION TESTING AND COMMISSIONING OF BALLASTLESS TRACKWORK IN MAINLINE FROM DAHISAR EAST STATION TO BHAYANDAR INCLUDING THIRD TRACK SIDE TRACK AND DEAD END AT DAHISAR
2023_MMRDA_891060_1
MMRDA/L9/MMRP/CA-167
Open Tender
Civil Works - Others
549 days
Mumbai
Please refer Tender documents.
8 documents required · 8 mandatory
₹11,800
₹1 L
Yes
MMRDA
27 May 2024
5 Apr 2023
22 May 2023
5 Apr 2023
19 May 2023
26 Apr 2023
5 Apr 2023 - 19 Apr 2023
17 Apr 2023
Amount
Design, Construction, Manufacturing, Supply, Installation, Testing and Commissioning of Ballastless Trackwork in Mainline from Dahisar East Station (Ch. 15194.260 m) to Bhayandar (Ch. 26435.0 m) including Third Track, Side Track & Dead End at Dahisar and Depot Entry / Exit Approach Track for Line-9 Corridor {Dahisar (E) to Bhayandar} of Mumbai Metro Rail Project of MMRDA, Mumbai
Schedule ‘A’ Design, Construction, Manufacturing, Supply, Installation, Testing and Commissioning of Ballastless Trackwork in Mainline from Dahisar East Station (Ch. 15194.260 m) to Bhayandar (Ch. 26435.0 m) including Third Track, Side Track & Dead End at Dahisar and Depot Entry / Exit Approach Track for Line-9 Corridor {Dahisar (E) to Bhayandar} of Mumbai Metro Rail Project of MMRDA, Mumbai. In terms of Clause C2.5 & C2.6 of ITT, the rates shall be inclusive of all central/state /local taxes, duties, levies, cess, full Custom Duty and all other incidental charges etc. excluding GST
Schedule ‘B’ (Provisional Sum) and concrete Bed for Stacking of Rails. Bidder to quote amount as per volume 6
Paras Railtech Private Limited
TEXMACO RAIL AND ENGINEERING LIMITED
ITD CEMENTATION INDIA LIMITED