| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LAccepted-Finance NA | ₹8.2 L | L1 | Accepted-Finance Accepted |
| 2 | L2₹8.3 LRejected-Finance HOUSE NO 214 WARD NO 2 TEHSIL SUJANPUR DISTT HAMIRPUR HP | HAMIRPUR | HIMACHAL PRADESH | 174304 | ₹8.3 L | L2 | Rejected-Finance Rejected |
| 3 | L3₹8.3 LRejected-Finance | ₹8.3 L | L3 | Rejected-Finance Rejected |
| 4 | Not Admitted-Fee/PreQual/Technical HAMIRPUR ROAD NEAR BUS STAND UNA DISTT UNA HP | UNA | HIMACHAL PRADESH | 174301 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | RAJNEESH THAKUR L2 | ARUN CHAUHAN L3 | Sushil Chauhan L1 |
|---|---|---|---|---|---|---|
| 1.00 | Supply, erection, testing & commissioning of horizontal spindle,horizontal split casing,radial split Single, /Multistages centrifugal pumps or combination of pumps, in series/parallel of recommended make such as Mather and Platt/KSB//Becon weir/Kirloskar/ BE/Jyoti or any other make approved from Jal Shakti Vibhag as per BIS 1520-1980 with upto date ammendments read with BIS 9137-1978 or latest edition to suitable for lifting clear water for under mentioned characteristics with bronze impellers/ priming funnels casing ring and shaft sleaves or bronze. shaft of steel grade-with cast iron casing coupled directly through a flexible coupling on a common C.I./Cast steel base platel (base plate to be from the manufacturers of the pumping unit only) to slip ring/squirrel cage screen protected drip proof induction motor of standard make such as Kirloskar/Crompton/Bhel/NGEF/ GEC/ Siemen/Jyoti/ABB or any other make approved from Jal Shakti Vibhag suitable for operation on 415(+) /-5% volts, 50 cycles/ second, 3 phase AC electric supply. The power of electric motor should be atleast 10% in excess of the maximum power required by the pump in the operation range of (+) 10% and (-)25% of the duty point head. The motor should be as per IS:325-1978 with upto date ammendments read with IS:900-1972. It should include cost of bearing nuts, bolts and pointing etc. and should meet the following requirements 60HP Motor Only. | 1 | Per Set(60HP Motor) | 8,30,000 ₹8.3 L | 8,35,000 ₹8.3 L | 8,15,000 ₹8.2 L |
| 1.01i) Discharge (Q) 18 LPS each pump. ( 2 no. pumps working at a time Simultaneously ) | ||||||
| 1.02ii) Total Dynamic head 200 mtrs. | ||||||
| 1.03a) LWL of sump well (h) 2000 mtr. | ||||||
| 1.04b) Shaft level 2000 mtr. | ||||||
| 1.05c) Level at discharge point 2200 mtr. | ||||||
| 1.06d) suction lift (+) head 298 mtr. | ||||||
| 1.07e) Discharge head 420 mtr. | ||||||
| 1.08f) Static head 180 mtr. | ||||||
| 1.09iii) Rising main | ||||||
Tender Value
₹5.7 L
EMD Value
₹11,330
Closing Date
12 Mar 2026, 11:00 amClosed
Executive Engineer
JSV Division Rohru
SH R R P F of 60HP Motor
2026_HPIPH_130479_1
No.JSV-RD-AB-Tnd/2025- 8457-8520 dt 05.03.2026
Open Tender
Civil Works
90 days
Koftu
Tender Document
8 documents required · 8 mandatory
₹500
EE Rohru
₹11,330
7 May 2026
5 Mar 2026
12 Mar 2026
5 Mar 2026
12 Mar 2026
5 Mar 2026
Supply, erection, testing & commissioning of horizontal spindle,horizontal split casing,radial split Single, /Multistages centrifugal pumps or combination of pumps, in series/parallel of recommended make such as Mather and Platt/KSB//Becon weir/Kirloskar/ BE/Jyoti or any other make approved from Jal Shakti Vibhag as per BIS 1520-1980 with upto date ammendments read with BIS 9137-1978 or latest edition to suitable for lifting clear water for under mentioned characteristics with bronze impellers/ priming funnels casing ring and shaft sleaves or bronze. shaft of steel grade-with cast iron casing coupled directly through a flexible coupling on a common C.I./Cast steel base platel (base plate to be from the manufacturers of the pumping unit only) to slip ring/squirrel cage screen protected drip proof induction motor of standard make such as Kirloskar/Crompton/Bhel/NGEF/ GEC/ Siemen/Jyoti/ABB or any other make approved from Jal Shakti Vibhag suitable for operation on 415(+) /-5% volts, 50 cycles/ second, 3 phase AC electric supply. The power of electric motor should be atleast 10% in excess of the maximum power required by the pump in the operation range of (+) 10% and (-)25% of the duty point head. The motor should be as per IS:325-1978 with upto date ammendments read with IS:900-1972. It should include cost of bearing nuts, bolts and pointing etc. and should meet the following requirements 60HP Motor Only.
i) Discharge (Q) 18 LPS each pump. ( 2 no. pumps working at a time Simultaneously )
ii) Total Dynamic head 200 mtrs.
a) LWL of sump well (h) 2000 mtr.
b) Shaft level 2000 mtr.
c) Level at discharge point 2200 mtr.
d) suction lift (+) head 298 mtr.
e) Discharge head 420 mtr.
f) Static head 180 mtr.
iii) Rising main
a) Length 800 mtr.
b) Dia 65mm(H)
iv) Pumping hour 8 hours.
v) Altitude of installation above MSL mtr.
vi) Characterstics of water. Clear cold water
a) Temperature 0C.
b) Ambient temp. 0C.
c) Turbiduty JTU
d) Alkanality
e) Size of the solid NIL mm.
f) Other
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.54 MB
F7and8.pdf
Tender Documents • 2.82 MB
termandconditions.pdf
Tender Documents • 0.38 MB
BOQ_192895.xls
BOQ • 0.30 MB
F6.pdf
Tender Documents • 0.06 MB
Download all tender documents and submit your bid