Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹32.4 LAdmitted-Fee/PreQual/Technical/Finance AT SAGUANI BAGICHA P O P S DIST KHORDA | KHORDA | KHORDA | ODISHA | +0.00% | ₹32.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹32.4 L
EMD Value
₹32,447
Closing Date
19 Sept 2026, 5:00 pmClosed
Block Development Officer Badamba
At/ Po/ PS- Badamba, Dist- Cuttack Pin- 754031
DEVELOPMENT OF TOURISIM INFRASTRUCTURE AT GIRIGOBARDHAN TEMPLE AT RATAPAT, BADAMBA KATAKA
2026_PRBBM_139832_1
BMB/01/2026-27
National Competitive Bid
Civil Works - Buildings
Percentage
240 days
RATAPAT, BADAMBA KATAKA
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹32,447
Yes
21 Sept 2026
5 Sept 2026
21 Sept 2026
5 Sept 2026
19 Sept 2026
5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in all kinds of soil by mechanical means (Hydraullic excavator)/ manual means overareas (exceeding 30 cm in depth, 1.5 m in width as well as 10sqm on plan) inculding disposal of excavated earth up to 50 m and lift upto 1.5m with all lead andlift including shoring, shuttering & dewatering (if required) with cost of all Labour, Labourcess, Hire & Running charges of the water pumps, T & P required for the work complete asdirected by the Engineer- in- charge.
Earth work excavation in stoney earth and gravel mixed with stone | 95.4 | cum | 441.17 | ₹42,087.62 |
| 2 | Filling in foundation and plinth with excavated materials including watering and ramming as directed by the Engineer-in-charge | 31.48 | cum | 245.09 | ₹7,715.43 |
| 3 | Filling in foundation trenches and plinths with filling sand, well watered, compacted, dressed and leveled to proper gradient etc., complete as per the direction of the Engineer in-charge. | 24.84 | cum | 672.94 | ₹16,715.83 |
| 4 | Providing and laying plain cement concrete 1:4:8 (1 part cement: 4 parts coarse sand: 8 parts of graded stone aggregate 40mm max. size) in foundation, footing for columns, floor (sub base), including from work, mixing, placing, compacting, curing etc. all complete as per specification and directed by the Engineer. | 24.84 | cum | 5,809.37 | ₹1,44,304.75 |
| 5 | Laterite stone masonary work in foundation and plinth in cement mortar (1:6) | 149.04 | cum | 7,227.09 | ₹10,77,125.49 |
| 6 | R.C.C. work of M 20 using 20mm and down graded hard granite Crusher broken chips including laying, hoisting, Centring & shuttering with all cost, conveyance etc. complete.
a. Periphery wall Plinth Band | 24.84 | cum | 7,655.4 | ₹1,90,160.14 |
| 7 | b. Periphery wall Lintal Band | 13.8 | cum | 14,491.5 | ₹1,99,982.7 |
| 8 | Supplying, fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification. | 30 | qntl | 9,541.01 | ₹2,86,230.3 |
| 9 | Fine dressed Laterite stone / decorative laterite stone masonary work in super structure in cement mortar (1:4)
a. Periphery wall (GF SS) | 151.8 | cum | 7,482.83 | ₹11,35,893.59 |
| 10 | b. Periphery wall (FF SS) | 19.32 | cum | 7,482.83 | ₹1,44,568.28 |
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
DTCNRATAPATAGIRIGOBARDHANTEMPLEF.pdf
Tender Documents • 24.02 MB
BOQ_608077.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .