Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.9 LAdmitted-Finance 3 4 JEEVAN DEEP BUILDING 10 PARLIAMENT STREET NEW DELHI 1 PH 011 43573493 9899713006 | L1 | Admitted-Finance | |
| 2 | L2₹30.6 L+₹65,000 (2.17%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹38.8 L+₹8.8 L (29.5%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | Rejected-Technical 11TH FLOOR ECO CENTRE BUSINESS TOWER P NO 4 EM BLOCK SECTOR V KOLKATA 91 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | - | Rejected-Technical technically not qualified | |
| 5 | Rejected-Technical 2 44 A 4 KALU SARAI HAUZ KHAS DELHI SOUTH WEST DELHI DELHI 110016 | SOUTH DELHI | DELHI | 110016 | - | Rejected-Technical technically not qualified |
| Sl No | Description | Qty | Unit | snowmex engineers ltd L1 | Bravia Techno Solutions Pvt Ltd L3 | GK INFRA ENGINEERS L2 |
|---|---|---|---|---|---|---|
| 1.00 | Providing, installation, testing and commissioning of Automatic Tube Cleaning System (ATCS) with common (for all four chillers) injection cum collection pump or separate pumps for injection and collection with microprocessor controlled injection system for pushing an external cleaning agent such as soft balls or stars through the water cooled condenser tubes having option for setting frequency of injection from microprocessor based control panel, equipped with control valves for reversing direction of cleaning agents that can be operated from chiller panel, complete with pumps with required Y-strainers on suction side and NRVs on discharge side in compliance with the attached specifications. The work shall include Ball Trap installation by piping modifications at appropriate location of condenser outlet pipe, necessary piping work, providing power connection with suitable size of cable from distribution panel to ATCS and from each chiller panel to ATCS pump panel, carrying out descaling and complete cleaning of condenser tubes before commissioning, opening and refitting of condenser dish ends, necessary interlocking from chiller panel to ATCS panel etc. complete as required. | 1 | No | 27,00,000 ₹27,00,000 | 31,85,131 ₹31,85,131 | 25,20,000 ₹25,20,000 Lowest |
| 2.00SUB HEAD - 2 (AMC) (Supplementary agreement shall be formed after DLP) under ARMO Fund | ||||||
| 3.00Comprehensive (Routine, Preventive and Breakdown) maintenance of ATCS including its all accessories, time to time checking of components, electrical circuits, etc. for smooth operation of the entire unit during the defect liability period of 1 year after date of commissioning as per maintenance schedule. (No payment shall be made separately for this period): 1st Year - 1 Job free of cost | ||||||
| 4.00Comprehensive (Routine, Preventive and Breakdown) maintenance of ATCS including its all accessories, time to time checking of components, electrical circuits, etc. for smooth operation of the entire unit after defect liability period of 1 year from the date of commissioning as per maintenance schedule. Any breakdown shall be attended within 4 hours of reporting. Spare parts required during breakdown maintenance shall be arranged and replaced by the Contractor. This is applicable for the whole system of AC units installed. (N.B.: 01 Job means during a period of one year) | ||||||
| 4.01 | 2nd year (For 12 months) | 1 | Job | 55,000 ₹55,000 Lowest | 1,25,400 ₹1,25,400 | 1,00,000 ₹1,00,000 |
| 4.02 | 3rd year (For 12 months) | 1 | Job | 57,000 ₹57,000 Lowest | 1,31,670 ₹1,31,670 | 1,00,000 ₹1,00,000 |
| 4.03 | 4th year (For 12 months) | 1 | Job | 59,000 ₹59,000 Lowest | 1,38,253 ₹1,38,253 | 1,00,000 ₹1,00,000 |
| 4.04 | 5th year (For 12 months) | 1 | Job | 61,000 ₹61,000 Lowest | 1,45,160 ₹1,45,160 | 1,20,000 ₹1,20,000 |
| 4.05 | 6th year (For 12 months) | 1 | Job | 63,000 ₹63,000 Lowest | 1,52,400 ₹1,52,400 | 1,20,000 ₹1,20,000 |
Tender Value
₹39.0 L
EMD Value
₹78,012
Closing Date
11 Nov 2025, 3:00 pmClosed
Executive Engineer
Assistant Executive Engineer-in-charge, AC Division, Works Department, IIT Delhi, Hauz Khas, New Delhi 110016
Providing, Installation, Testing and Commissioning of Automatic Tube Cleaning System for the Condensers of 4 x 450 TR Water Cooled Chiller AC Plant at IIT Delhi
2025_IIT_884091_1
IITD/WORKS (SP-5157 )/2025
Open Tender
Electrical Works
Works
60 days
IIT Delhi Hauz Khas
Please refer Tender documents.
14 documents required · 14 mandatory
₹0
₹78,012
28 Nov 2025
4 Nov 2025
12 Nov 2025
4 Nov 2025
11 Nov 2025
4 Nov 2025
Providing, installation, testing and commissioning of Automatic Tube Cleaning System (ATCS) with common (for all four chillers) injection cum collection pump or separate pumps for injection and collection with microprocessor controlled injection system for pushing an external cleaning agent such as soft balls or stars through the water cooled condenser tubes having option for setting frequency of injection from microprocessor based control panel, equipped with control valves for reversing direction of cleaning agents that can be operated from chiller panel, complete with pumps with required Y-strainers on suction side and NRVs on discharge side in compliance with the attached specifications. The work shall include Ball Trap installation by piping modifications at appropriate location of condenser outlet pipe, necessary piping work, providing power connection with suitable size of cable from distribution panel to ATCS and from each chiller panel to ATCS pump panel, carrying out descaling and complete cleaning of condenser tubes before commissioning, opening and refitting of condenser dish ends, necessary interlocking from chiller panel to ATCS panel etc. complete as required.
SUB HEAD - 2 (AMC) (Supplementary agreement shall be formed after DLP) under ARMO Fund
Comprehensive (Routine, Preventive and Breakdown) maintenance of ATCS including its all accessories, time to time checking of components, electrical circuits, etc. for smooth operation of the entire unit during the defect liability period of 1 year after date of commissioning as per maintenance schedule. (No payment shall be made separately for this period): 1st Year - 1 Job free of cost
Comprehensive (Routine, Preventive and Breakdown) maintenance of ATCS including its all accessories, time to time checking of components, electrical circuits, etc. for smooth operation of the entire unit after defect liability period of 1 year from the date of commissioning as per maintenance schedule. Any breakdown shall be attended within 4 hours of reporting. Spare parts required during breakdown maintenance shall be arranged and replaced by the Contractor. This is applicable for the whole system of AC units installed. (N.B.: 01 Job means during a period of one year)
2nd year (For 12 months)
3rd year (For 12 months)
4th year (For 12 months)
5th year (For 12 months)
6th year (For 12 months)
GK INFRA ENGINEERS (BID ID -3313788)
Bravia Techno Solutions Pvt Ltd (BID ID -3314348)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
BOQ_929245.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .