| 1 | L1₹47.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹48.6 L+₹1.0 L (2.19%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | S.GOPALAKRISHNAN L1 | E.SEKAR L2 |
|---|---|---|---|---|---|
| 1.001.Providing Cement Concrete Pavement to Indra Nagar Srinivasa Nagar NSC Bose Street. Estimate Amount Rs.9.55 lakh | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,. | 23.26 | Cum | 245 ₹5,698.7 Lowest | 245 ₹5,698.7 Lowest |
| 3.00 | Supply and filling sand in layers well rammed, watered and compacted etc,. Complete. | 7.75 | Cum | 1,715 ₹13,291.25 Lowest | 1,715 ₹13,291.25 Lowest |
| 4.00 | C.C. 1:4:8. Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc,complete. | 7.75 | Cum | 5,380 ₹41,695 Lowest | 5,380 ₹41,695 Lowest |
| 5.00 | C.C. 1:2:4. Mix using 20MM ISS HBG metal including cost and conveyance and all other labour charges etc,complete. | 18.35 | Cum | 6,790 ₹1,24,596.5 Lowest | 6,790 ₹1,24,596.5 Lowest |
| 6.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 37.51 | Cum | 2,129 ₹79,858.79 Lowest | 2,129 ₹79,858.79 Lowest |
| 7.00 | Supply & Erecting centring for Sides & Soffits of CC Works Including cost & conveyance of all Materials and all Labour charges | 159.6 | Sqm | 515 ₹82,194 Lowest | 555 ₹88,578 |
| 8.00 | Plain Cement concrete 1:1 1/2:3 mix using 20mm ISS metal including cost and conveyance of all Materials and all Labour charges ,etc complete | 56.26 | Cum | 7,459 ₹4,19,643.34 Lowest | 7,650 ₹4,30,389 |
| 9.00 | Supply & Fixing of Bitumen pad in CC Pavement Including cost & conveyance of all Materials and all Labour charges, etc complete | 11.35 | Sqm | 234 ₹2,655.9 Lowest | 234 ₹2,655.9 Lowest |
| 10.00 | Supply & Filling of Good Gritty Gravel from Approved Quarry & Laid in Layers including cost of Materials & all labour charge etc.,complete | 15.5 | Cum | 804 ₹12,462 Lowest | 804 ₹12,462 Lowest |
Tender Value
₹48.7 L
EMD Value
₹49,000
Closing Date
22 Jul 2025, 3:00 pmClosed
The Project Director, DRDA, Kancheepuram
O/o The Project Director, DRDA, Kancheepuram
Providing 3Nos of Cement concrete road to Paraniputhur Panchayat in Kundrathur Panchayat Union of Kancheepuram District
2025_RDTN_579172_1
Rc.No.21/TENDER/2024 Dt.07.07.2025
Open Tender
Civil Works
Item Rate
120 days
O/o The Project Director, DRDA, Kancheepuram
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹49,000
O/o The Project Director, DRDA, Kancheepuram
6 Oct 2025
8 Jul 2025
22 Jul 2025
8 Jul 2025
22 Jul 2025
8 Jul 2025
18 Jul 2025
Amount
1.Providing Cement Concrete Pavement to Indra Nagar Srinivasa Nagar NSC Bose Street. Estimate Amount Rs.9.55 lakh
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,.
Supply and filling sand in layers well rammed, watered and compacted etc,. Complete.
C.C. 1:4:8. Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc,complete.
C.C. 1:2:4. Mix using 20MM ISS HBG metal including cost and conveyance and all other labour charges etc,complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Supply & Erecting centring for Sides & Soffits of CC Works Including cost & conveyance of all Materials and all Labour charges
Plain Cement concrete 1:1 1/2:3 mix using 20mm ISS metal including cost and conveyance of all Materials and all Labour charges ,etc complete
Supply & Fixing of Bitumen pad in CC Pavement Including cost & conveyance of all Materials and all Labour charges, etc complete
Supply & Filling of Good Gritty Gravel from Approved Quarry & Laid in Layers including cost of Materials & all labour charge etc.,complete
Supply and Filling of 200mm Dia PVC Pipes 6.00kg per Sqm in Road for Cross Drain including cost of materials & labour charges etc complete.
2.Providing Cement Concrete Pavement From Srinivasa Nagar to Bogan Villa Main Road. Estimate Amount Rs.34.42 lakh
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Supply & Erecting centring for Sides & Soffits of CC Works Including cost & conveyance of all Materials and all Labour charges
Plain Cement concrete 1:1 1/2:3 mix using 20mm ISS metal including cost and conveyance of all Materials and all Labour charges ,etc complete
Supply & Fixing of Bitumen pad in CC Pavement Including cost & conveyance of all Materials and all Labour charges, etc complete
Supply & Filling of Good Gritty Gravel from Approved Quarry & Laid in Layers including cost of Materials & all labour charge etc.,complete
Supply and Filling of 200mm Dia PVC Pipes 6.00kg per Sqm in Road for Cross Drain including cost of materials & labour charges etc complete.
3.Construction of RCC Slab Culvert in Srinivasa Nagar Main Road 2.00m Span. Estimate Amount Rs.4.71 lakh
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,.
Supply and filling sand in layers well rammed, watered and compacted etc,. Complete.
C.C. 1:4:8. Mix using 40MM ISS HBG metal including cost and conveyance and all other labour charges etc,complete.
C.C. 1:2:4. Mix using 20MM ISS HBG metal including cost and conveyance and all other labour charges etc,complete.
Supply & Erecting centring for Sides & Soffits of CC Works Including cost & conveyance of all Materials and all Labour charges
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Plain Cement concrete 1:1 1/2:3 mix using 20mm ISS metal including cost and conveyance of all Materials and all Labour charges ,etc complete
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Applying tack coat over BT surface (not treated with primer) using 2.50 Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as
Providing and laying Bituminous Concrete to 25/30mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Provision for GST 18 %
E.SEKAR (BID ID -1399963)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .