Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹7.0 L
EMD Value
₹6,950
Closing Date
24 Feb 2020, 4:00 pmClosed
Executive Engineer
S and D Div West Jammu
Improvement Construction of Deep Drain at Ambedkar Nagar Old Janipur Jammu Ward No 34 Contract No SDJ W 208 2019 20
2020_HAUDD_92930_21
ENIT NO 58 OF 2019-20
Open Tender
Civil Works
Item Rate
45 days
Jammu
refer NIT
3 documents required · 3 mandatory
₹600
Executive Engineer
₹6,950
4 Sept 2020
17 Feb 2020
25 Feb 2020
17 Feb 2020
24 Feb 2020
17 Feb 2020
Amount
Removal of mulba from designated sites and its disposal as per directions, all inclusive
Earth work in excavation by manual means in trenches for foundation, drains, pipes, cables etc. (Not exceeding 1.5mtr. in width) and for shafts, wells ,cesspits and the like not exceeding 10sqm on plan, depth upto 1.5mtr neatly dressed in all kinds of soil.
Demolishing cement concrete manually / by mechanical means including disposal of material (1:3:6 or richer mix)
Providing and Laying in position cement concrete of specified grade excluding the cost of centering and shuttering- All work upto plinth level 1:4:8 [1cement : 4coarse : 8 graded crushed stone aggregate 40mm nominal size].
Providing and Laying in position cement concrete of specified grade excluding the cost of centering and shuttering- All work upto plinth level 1:2:4 [1cement : 2coarse sand : 4 graded crushed stone aggregate 20mm nominal size].
Providing and laying in position Reinforced cement concrete of specified grade excluding the cost of centering and shuttering all works upto plinth level 1:1.5:3mix (1cement : 1.5sand : 3 graded stone aggregate ) of 20mm nominal size crushed aggregate
Reinforcement for R.C.C work including straightening, cutting, bending placing in position and binding all complete.Thermo-Mechanically Treated bars.
Centring and shuttering including strutting, propping etc. & removal of form for :-
Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
Suspended floors, roofs, landing, balconies and access platform.
Edges of slabs and breaks in floors and walls upto 20cm wide.
Steel work welded in built up sections / framed work including cutting, hosting, fixing in position and applying a primary cost of approved steel primer using structural steel etc. as reported in gratings, frames, guard bar, ladders, railings, brackets, gates & similar works.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering lead upto 50m and lift upto 1.5m.
Carriage of Surplus earth / mulba for disposal 6 km by MT
Carriage of Material
Sand & stone aggregate 8 km by M.T.
stone aggregate 40 mm 8 km by M.T.
ANTS BUILDTECH
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .