| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LRejected-Finance 0 RAM LAL UNNAMED ROAD SANGRAMGARH PRATAPGARH UTTAR PRADESH 230141 | PRATAPGARH | UTTAR PRADESH | 230141 | L1 | Rejected-Finance reject | |
| 2 | L2₹8.6 L+₹28,360.65 (3.41%)Rejected-Finance AYODHYA | UTTAR PRADESH | 224001 | L2 | Rejected-Finance reject |
| Sl No | Description | Qty | Unit | M/S RAJENDRA PRASAD L2 | ADITYA CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | E/W in making approach/diversion for traffic including lead, lift, dressing, labour and t&p etc.required for proper completion of work as per direction of Engineer-in-Charge. | 96.75 | M3 | 80 ₹7,740 | 50 ₹4,837.5 Lowest |
| 2.00 | Dismantling of reinforced cement concrete 1:2:4 including stacking of materials within a distance of 60M including all cost of materials, labours and T&P etc. required for proper completion of work as per direction of Engineer-in-charge. | 6.35 | M3 | 400 ₹2,540 Lowest | 900 ₹5,715 |
| 3.00 | Dismantling of old and damage stone masonry work in cement mortor including stacking of materials within a distance of 60M including all cost of materials, labours and T&P etc. required for proper completion of work as per direction of Engineer-in-charge. | 27.7 | M3 | 150 ₹4,155 Lowest | 200 ₹5,540 |
| 4.00 | E/W in excavation in foundation including back filling of excavated earth with 30m lead & 1.5 m lift etc. required for proper completion of work as per direction of Engineer-in-Charge. | 36.8 | M3 | 70 ₹2,576 Lowest | 112 ₹4,121.6 |
| 5.00 | Supply and laying local sand below in foundation C.C. including cost of all materials labour T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. | 7.1 | M3 | 1,000 ₹7,100 | 500 ₹3,550 Lowest |
| 6.00 | Laying.C.C. 1:3:6 in foundation & floor including cost of all materials labours T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. | 14.2 | M3 | 3,900 ₹55,380 | 3,500 ₹49,700 Lowest |
| 7.00 | C.R.S. Masonary with 1:3 C.M.including cost of all material labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. | 90.9 | M3 | 4,350 ₹3,95,415 | 3,500 ₹3,18,150 Lowest |
| 8.00 | 20 mm deep struck cement pointing on stone masonary with 1:2C.M. C.M. including cost of all material labours and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. | 65.85 | M2 | 100 ₹6,585 Lowest | 100 ₹6,585 Lowest |
| 9.00 | C.C 1:2:4 for wearing coat and coaping of parapet including cost of all materials, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. | 4.2 | M3 | 5,800 ₹24,360 Lowest | 6,000 ₹25,200 |
| 10.00 | Centering & shuttering for c.c & R.C.C. slab including cost of all materials labour T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. | 67.95 | M2 | 400 ₹27,180 Lowest | 500 ₹33,975 |
Tender Value
₹11.5 L
EMD Value
₹23,020
Closing Date
4 Feb 2023, 3:30 pmClosed
E.E. Belan Canal Division, Prayagraj
Office of the E.E. Belan Canal Division, Govindpur, Prayagraj
Reconstruction of V.R.B. at Km. 13.712 of Upraudh Dy.
2023_UPIDC_770225_10
05/EE/2022-23
Open Tender
Civil Works
Item Wise
45 days
Prayagraj
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹23,020
4 Oct 2026
30 Jan 2023
4 Feb 2023
30 Jan 2023
4 Feb 2023
30 Jan 2023
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
Tender Document • 2.23 MB
DOC05.pdf
Tender Document • 0.63 MB
BOQ_1271051.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .