| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.3 LAccepted-AOC | ₹6.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹7.1 L+₹84,000 (13.3%)Rejected-AOC | ₹7.1 L+₹84,000 (13.3%) | L2 | Rejected-AOC L2 |
| 3 | L3₹8.0 L+₹1.7 L (26.5%)Rejected-AOC | ₹8.0 L+₹1.7 L (26.5%) | L3 | Rejected-AOC L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Documents as per NIT not submitted |
Tender Value
₹8.3 L
EMD Value
₹16,540
Closing Date
9 Sept 2021, 6:00 pmClosed
GE(AF)Yelahanka
GE(AF)Yelahanka Bangalore 63
SOIL INVESTIGATION FOR SURFACE OVERLAYING WORKS TO RUNWAY CONNECTING LINKS TO NORTHERN AND SOUTHERN TAXI TRACK A,F,G,K,M,P AT AF STATION YELAHANKA
2021_MES_467878_1
8911/E8
Open Tender
Civil Works
Item Rate
120 days
AFS Yelahanka
As per NIT
9 documents required · 9 mandatory
₹500
Yes
GE(AF)Yelahanka
₹16,540
Yes
9 Dec 2021
13 Aug 2021
11 Sept 2021
13 Aug 2021
9 Sept 2021
28 Aug 2021
Amount
Mobilization and demobilization of drilling rig from lab to testing/work site and from testing /work site back to lab.
Mobilization of mechanical drilling equipment and shifting of entire arrangement from one bore to another bore hole location and setting of boring/drilling rig as required /directed by Engineer-in-charge. Digging of bore hole of diameter 150mm in any type of soil/soft rock /hard rock upto 4.00m depth or refusal strata (N>5) which ever is encounteerd earlier by manual drilling as per IS1892-1979 and conducting Standard Penetration Test (SPT) at every 30cm depth interval and every change of strata as per IS 2131-1981 in bore hole. Observation of ground water table and collection of undisturbed and disturbed samples at every 30 cm depth. Conducting necessary tests as per relevant IS codes /NBC 2005/SP 36 on all collected samples which include the determination of (i) Atterberg limits(liquid limit,plastic limit and plasticity index etc.) (ii) Natural Moisture Content (iii) Wet & Dry density (iv) Soil particle size distribution using sieve/hydrometer analysis (v) Tri-axial/Direct shear Tests C&T determination (vi) Shrinkage limit (vii) Consolidation test. (viii) Specific gravity test for sand/rock (ix) Crushing strength of rock samples (x) Permeability test (xi) Free swell index (xii) Chemical analysis of soil (xiii)Chemical analysis of ground water sample(Min 2 samples) (xiv)Determination of organic materials in soil
Mobilization of mechanical drilling equipment and shifting of entire arrangement from one bore to another bore hole location and setting of boring/drilling rig as required /directed by Engineer-in-charge. Digging of bore hole of diameter 150mm in any type of soil/soft rock /hard rock upto 4.00m depth or refusal strata (N>5) which ever is encounteerd earlier by manual drilling as per IS1892-1979 and conducting Standard Penetration Test (SPT) at every 30cm depth interval and every change of strata as per IS 2131-1981 in bore hole. Observation of ground water table and collection of undisturbed and disturbed samples at every 50 cm depth. Conducting necessary tests as per relevant IS codes /NBC 2005/SP 36 on all collected samples which include the determination of (i) Atterberg limits(liquid limit,plastic limit and plasticity index etc.) (ii) Natural Moisture Content (iii) Wet & Dry density (iv) Soil particle size distribution using sieve/hydrometer analysis (v) Tri-axial/Direct shear Tests C&T determination (vi) Shrinkage limit (vii) Consolidation test. (viii) Specific gravity test for sand/rock (ix) Crushing strength of rock samples (x) Permeability test (xi) Free swell index (xii) Chemical analysis of soil (xiii)Chemical analysis of ground water sample(Min 2 samples) (xiv)Determination of organic materials in soil
Conduction K Value test on 75mm dia plate and evaluating the modulus of sub grade reaction at locations all as specified in IS 9214-1979 o as directed by Engineer-in-charge. Note: - 1. Loading shall be done appropriately using loaded trucks; log sheets for each test shall be maintained and submitted separately in each case. 2. The disturbed locations (Earth pits) will have to be filled / levelled / consolidated after the tests to match the adjoining areas.
Conducting laboratory California Bearing Ratio (CBR) test at locations directed by Engineer-in-charge
Conducting plate load test per 25 tonne capacity at locations directed by Engineer-in-charge to determine the ultimate bearing capacity of soil and the likely settlement under a given load.
Soigne Engineering Consultants
B5BUILDING SOLUTIONS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .