Loading…
Loading…
Tender Value
₹2.4 Cr
EMD Value
₹4.8 L
Closing Date
5 Oct 2026, 2:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
ELECTRICAL
14 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual. turnover of V/N crores or V crores whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB in GCC works April 22, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. Certificate in the prescribed format for verification / confirmation of the documents submitted for compliance of eligibility / qualifying criteria For further more details refer clause 10.1 and 10.2 of GCC April 2022 with correction slip issued up to date
(a)The tenderer must have successfully completed any of the following during last 7 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work each costing not less than the amount equal to 60% of advertised value of the tender Similar works defined as "Successful completion of works involving installation of wiring/ lighting with 240v, 1 phase or 415v, 3 phase system with control gear and protection arrangements in residential buildings or service buildings or railway stations/ yards or colony/ highway lightings in Central/State Governments and PSUs."
Defination of Similar Work :- Similar works defined as "Successful completion of works involving installation of wiring/ lighting with 240v, 1 phase or 415v, 3 phase system with control gear and protection arrangements in residential buildings or service buildings or railway stations/ yards or colony/ highway lightings in Central/State Governments and PSUs."
12 conditions · 1 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
I/We have read the various conditions attached/referred to in this tender document and agree to abide by the said conditions.
I/We hereby Confirm that the rates, rebates and/or other financial terms, if any, quoted by us in the relevant fields of the Financial Bid page will only be the ruling terms for deciding the inter-se ranking, and any such condition having financial repercussions, if quoted by us anywhere else including attached documents shall not be considered for deciding inter-se ranking.
The Tenderers are advised to visit the site of work in their own interest and acquaint themselves with the site conditions and expected quantum o f work and assess all the site specific difficulties to be experienced while executing the same and the rate shall be arrived duly considering all the facts above and quoted in the tender. Any representation at a later date specifying the site difficulties shall not be considered.
The tenderer shall go through the entire tender documents thoroughly and strictly adhere the instructions and directions given at different pages.
(i)For all the tenders having advertised cost of Rs. 10 lakh orabove, the contractor shall have the option to take paymentfrom Railways through a letter of credit (LC) arrangement.(ii)This option of taking payment through LC arrangement hasto be exercised in IREPS (Indian Railway ElectronicProcurement System - the e-application on which tenders arecalled by Railways) by the tenderer at the time of bidding itself,and the tenderer shall affirm having read over and agreed tothe terms and conditions of the LC option.(iii)The option soexercised, shall be an integral part of the bidder's offer. (iv)Theabove option of taking payment through LC arrangement,once exercised by tenderer at the time of bidding, shall befinal and no change shall be permitted, thereafter, duringexecution of contract.(v)In case tenderer opts for paymentthrough LC, following shall be the procedure to deal release ofpayment through LC:(a)The LC shall be a sight LC. (b)Thecontractor shall select his Advising/Negotiating bank for LC.The incidental cost towards issue of LC and its operationthereof shall be borne by the contractor.(c)SBI, New Delhi,Main Branch will be the nodal branch for issue of LCs basedon online requests received from Railway Accounts Units fortenders opened in financial year 2018-19. SBI branches wherethe respective Railway Accounts Office has its Account (localSBI branch) will be the issuance/reimbursing branch for LCissued under this arrangement. The Bank shall remain samefor this tender till completion of contract. The incidental cost @0.15 % per annum of LC value, towards issue of LC andoperation thereof shall be borne by the contractor and shall berecovered from his bills.(d)The LC shall be opened initially forduration of 180 to 365 days in consultation with contractor.The LC shall be extended time to time as per the progress ofthe contract, on the request of the contractor. The value of LCto be opened initially as well as extended thereafter shall befinalised by the engineer in consultation with the contractor onthe basis of expected progress of work.(e)The LC terms andconditions shall inter-alia indemnify and save harmless theRailway from and against all losses, claims and demands ofevery nature and description brought or recovered against theRailways by reason of any act or omission of the contractor,his agents or employees, in relation to the Letter of Credit(LC). All sums payable/borne by Railways on this account shallbe considered as reasonable compensation and paid by Contractor.
(f)The LC terms and conditions shall inter-alia provide that Railways will issue a Document of Authorisation after passing the bill for completed work, to enable contractor to claim the authorized amount from their bank.(g)The acceptable, agreed upon document for payments to be released under the LC shall be the Document of Authorisation.(h)The Document of Authorisation shall be issued by Railway Accounts Office against each bill passed by Railways.(i)On issuance of Document of Authorisation, a copy of Document of Authorisation shall be posted on IREPS for download by the contractor. A digitally signed copy of Document of Authorisation shall also be sent by Railway Accounts Office to Railway's bank (Local SBI Branch). (j)The contractor shall take print out of the Document of Authorisation available on IREPS and present his claim to his bank (advising Bank) for necessary payments as per LC terms and conditions. The claim shall comprise of copy of Document of Authorisation, Bill of Exchange and Bill.(k)The payment against LC shall be subject to verification from Railway's Bank (Local SBI Branch). (l)The contractor's bank (advising bank) shall submit the documents to the Railways Bank (Local SBI Branch0.(m)The Railway's bank (issuing bank) shall, after verifying the claim so received w.r.t. the digitally signed Document of Authorisation received from Railway Accounts Office, release the payment to contractor's bank (advising bank) for crediting the same to contractor's account.(n)Any number of bills can be dealt within one LC, provided the sum total of payments to contractor is within the amount for which LC has been opened.(o)The LC shall be closed after the release of final payment including PVC amount, if any, to the contractor.(p)The release of performance guarantee or security deposit shall be dealt directly by Railway with the contractor i.e., not through LC.
MDU Division: Raising of platforms at 18 stations, Provision of FOB at 8 stations - Power supply arrangements, wiring and installations and Provision of earthing arrangements.
U-E-OT-2026-14-01~SR
U-E-OT-2026-14-01
Open
Works - General
6 Months
Madurai, Tamil Nadu
₹0
₹4.8 L
11 Sept 2026
11 Sept 2026
21 Sept 2026
152 items across 6 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 19,99,259.54 | ||
| — | 108.00 | — | — | ||
| Supply and fixing of cable route indicator, cast iron plate type as per enclosed drawing and specifications | — | — | — | 64,152 | |
| — | 3298.00 | — | — | ||
| Excavation of trench in all kinds of soil including refilling as per specification | — | — | — | 7,51,944 | |
| — | 80.00 | — | — | ||
| Excavation of Cable trench across the concrete flooring / road / track as per specification | — | — | — | 23,760 | |
| — | 13.00 | — | — | ||
| Breaking of cement concrete flooring and disposal of material as directed by the Senior section Engineer in-charge | — | — | — | 8,278.01 | |
| — | 13.00 | — | — | ||
| Providing and laying in position cement concrete of 1:3:6 proportion (1 cement :3 sand:6 graded stone aggregate 20mm nominal size) | — | — | — | 43,313.4 | |
| — | 8725.00 | — | — | ||
| Laying of HDPE pipes | — | — | — | 2,61,750 | |
| — | 8725.00 | — | — | ||
| Drawing of LTUG cables in the existing HDPE pipe laid in the excavated cable trench. | — | — | — | 2,61,750 | |
| — | 10856.00 | — | — | ||
| Supply and laying of 6 SWG GI wire | — | — | — | 2,27,976 | |
| — | 72.00 | — | — | ||
| Supply,erection and testing of earthing arrangements | — | — | — | 3,32,640 | |
| — | 301.00 | — | — | ||
| Laying of LTUG cable with required termination. | — | — | — | 7,362.46 | |
| — | 301.00 | — | — | ||
| — | 1.00 | — | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Tender Document
ATTACHMENT
Correctionslipno1.pdf
ATTACHMENT
Correctionslipno2.pdf
ATTACHMENT
Correctionslipno3.pdf
ATTACHMENT
Correctionslipno4.pdf
ATTACHMENT
Correctionslipno5.pdf
ATTACHMENT
GCCACS11_compressed.pdf
ATTACHMENT
GCC_April-2022.pdf
ATTACHMENT
TenderDocument2026-14-01foruploading.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .