Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹3,000
Closing Date
1 Feb 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE OM HARUR
The Executive Engineer Operation Maintenance TANGEDCO Harur 636903
Work Contract for 1nos LT line shifting requested by National Highways and I no DCW HT LT Line shifting work at A.Pallipatty section, Pappireddipatty Sub Division, in Harur division
2023_EB_282558_1
WC.011/2022-23, Dt. 19.01.2023
Open Tender
Electrical Works
Works
EE OM HARUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,000
Yes
2 Feb 2023
19 Jan 2023
2 Feb 2023
19 Jan 2023
1 Feb 2023
19 Jan 2023
Amount
Excavation of pole pit to upto 8.0M length by using jcb/Manual
Excavation of pole pit to Above 8.0M length by using jcb/Manual
Excavation of Stay pit of 4.5 ' to 5 ' depth using JCB / Manual
Erection of RCC, REC, PSC poles upto 8.00m length by using Crane/Manual.
Erection of RCC, REC, PSC poles Above 8.00m length by using Crane/Manual.
Erection of stay set complete with fixing up stay wire Eye, Bow, Guy shackle, Binding etc.,
Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) For a lead upto 5 KM
Transporting of pole above 5 km of lead of ever km
Transportation of all types and sizes of poles and other associated materials from Road side to pole pit and vice versa upto 0.50 KM
Fixing of Two Tapping cross arm per cut point upto 33 KV line including fixing of Discs,insulators and Jumpering etc..
Fixing of V cross arm 3.5 feet
Fixing of HT PIN insulator with Pin 11 kv
Fixing of HT / LT Ti fitting
Fixing of LT 3 phase cross arm
Fixing of LT PIN insulator
Erection of Distribution Transformer structure complete as per TNEB standard including painting, feeders arrangement, colour washing of RCC poles etc., fixing of poles type to be unit HT/LT LAS and jumpering 3 Nos Earth pits with earth trough except erection of Distribution Transformer. (Data as per Annexure II)
Erection of Distribution Transformer including loading of Distribution Transformer at stores and erection at structure or vice versa. Above 25 KVA to 100 KVA
Releasing and reerection (resagging) of one run of all sizes of conductor
Paving and Stringing of conductor of one run of size up to 7/2.59 mm or other equivalent conductor
Transporting of line materials from store to office/site upto 10km distance by engaging 1 ton
Loading and unloading of all line materials
Manufacturing/altering of Clamps
E.P.F. @13 % should be Entered by the Bidder
E.S.I. @3.25 % should be Entered by the Bidder
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.02 MB
finance_335765.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .