Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Rejected-Technical | Rejected-Technical technically not qualified |
Tender Value
Refer Docs
Closing Date
20 Apr 2022, 1:00 pmClosed
Chief Engineer, Jal Shakti (PHE) Department Jammu
Office of Chief Engineer, Jal Shakti (PHE) Depart
Construction of 250 mm Dia. Production Wells by any suitable
2022_PHE_164694_1
e-NIT No. 102 of 2021-22
Open Tender
Drilling Works
Item Rate
80 days
97 Water Supply Schemes (105 no. Tube wells) of Di
As per SBD
7 documents required · 7 mandatory
₹1,000
chief Accounts Officer Jal Shakti (PHE) Department
Exempted
Chief Engineer, Jal Shakti (PHE) Department Jammu
4 Jun 2022
16 Mar 2022
20 Apr 2022
16 Mar 2022
20 Apr 2022
25 Mar 2022
24 Mar 2022
Amount
Deep Drilling Development of (02 Nos) Tube well upto 300 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at (i) Amala (ii) Garnyari in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 300 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Badholi in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Ballan Painin District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Balote in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Bhagocha Chak in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Bhagwal in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Bhamberwan in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Bhannu Chak in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Bobiya in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
eep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Badala in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Balode in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (02 Nos) Tube well upto 300 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at (i) Downstream Railway Line (ii) Upstream Railway Line in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 300 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Beara in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No. Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Bhakta in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 300 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Boura in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 300 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Chadwal & chan Dityal in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Chak Desa Choudhrian in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Chak Gojar in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Chak Kahna in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Chak Shama in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Chak Sukhuin District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Chak Wazir Labzu in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (02 Nos) Tube well upto 300 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at (i) Narotu (ii) Badanal in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 300 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Chakra in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Chandwan in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Chann Arorian in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Chann Charakri in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Chappakiin District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Chack Gadhadhar in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) atChack ram Chand in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Chack Rijju in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Chak Sohna Nupa in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Chak Sardar Dessa Singh in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (02 Nos) Tube well upto 300 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at (i) Jakhole B-I (ii) Jakhole B-II in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 300 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Changran in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Dabbi in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Dayala Chak in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Dhamal in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Dhamyal in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Dhangdevpur in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Dinga Amb in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Gara in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Gurah Mundian in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Hamirpur in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (02 Nos) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at (i) Kore Punnu-I (ii) Kore Punnu-II in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Haripur Brahmana in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Jagatpur in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Jakhbar in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No1) Tube well upto 300 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Jakhole-A in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 300 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Jandore in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Janglote East in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Janglote South in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Janglote West in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Jasrota in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 300 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Juthana Lower B in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 300 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (02 Nos) Tube well upto 300 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at (i) Near Baba Jogi (ii) Bhallar in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 300 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Kakra in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
eep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Kannah in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Kattal Brahmna in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Khanpur i in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Chak Gopala in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Kishanpur in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Kootah in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Kouli in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 300 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Kharote in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 300 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Logate in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (02 Nos) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at (i) Rajbagh (ii) Kala Karandi in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Mangloor in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Mela in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Mai Chack in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Majara in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Mearth in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Methandi in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Muthi Jagir in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Nouni in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Naryanpur in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 300 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Nanan in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 300 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (02 Nos) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at (i) Barnoti (ii) Chatyal in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Nihalpur in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Pantal in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Parangoli in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Pathwal in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Float-A in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Padyari in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Palli in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Rakh Sarkar in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Randood in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Rer in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 300 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Bann in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 300 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Saida in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Sanyal in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Sherpur Bala in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 250 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Sahar in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
ii) From 200 to 250 mtrs BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Sakta Chack in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Tanda in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Tardah in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Description of Work / Item(s)
Amount
Deep Drilling Development of (01 No.) Tube well upto 200 Metres BGL by Mud-Rotary Method (Reverse/Direct/Dual) at Wazire Chak in District Kathua
Setting up of drilling site by way of shifting of requisite machinery and allied material after making proper approaches as per requirement at site.
Boring/drilling of gravel packed bore hole of 530 mm dia for accommodating 250 mm dia casing/strainer pipe in order to construct 250 mm dia tube well by suitable mud-rotary method (reverse/direct/dual) prescribed in IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. i) From 0 to 200 mtr BGL
Supplying, welding/assembling, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1 mm thickness liner assembly (BLIND) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe BLIND upto location of tube well, as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Supplying, welding, lowering and fixing in vertical position in bore hole ERW (Electric Resistance Welded) 250 mm dia X 7.1mm thickness liner assembly (SLOTTED) FE 410 bevelled ended M.S. casing pipe, conforming to IS: 4270 (for tube wells) of reputed & approved make, including painted with inside & outside surface with two coats of anti corrosive paint of approved brand including handling, loading, unloading & transportation of M.S. Casing pipe SLOTTED upto location of tube well , as per direction of Engineer-in-charge. The cost also includes 3rd party inspection of M.S. casing Pipe from Govt. approved/designated agency.
Gravel packing in tube well construction in accordance with IS: 4097 of 1967 with latest amendments, including providing gravel fine/medium /coarse in required grading and sizes as per actual requirement, shrouding after lowering of liner assembly and during development of tube well all complete as per direction of Engineer-in-charge.
Development to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5 mtr length each and M.S. angle 40 X 40 X 6 mm and M.S. plate 10 mm thick with 2 Nos. cement concrete blocks of size 1.00 mtr X 1.00 mtr 1 No. each of both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge.
Shri MahaLakshmi Rigs
Friends Tubewell
GURNAM SINGH AND CO
Shri MahaLakshmi Rigs
Friends Tubewell
GURNAM SINGH AND CO
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
GURNAM SINGH AND CO
Shri MahaLakshmi Rigs
Friends Tubewell
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
GURNAM SINGH AND CO
Shri MahaLakshmi Rigs
Friends Tubewell
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
GURNAM SINGH AND CO
Friends Tubewell
Shri MahaLakshmi Rigs
Shri MahaLakshmi Rigs
Friends Tubewell
GURNAM SINGH AND CO
GURNAM SINGH AND CO
Shri MahaLakshmi Rigs
Friends Tubewell
Shri MahaLakshmi Rigs
Friends Tubewell
GURNAM SINGH AND CO
GURNAM SINGH AND CO
Friends Tubewell
Shri MahaLakshmi Rigs
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
Friends Tubewell
GURNAM SINGH AND CO
Shri MahaLakshmi Rigs
Friends Tubewell
GURNAM SINGH AND CO
Shri MahaLakshmi Rigs
Friends Tubewell
GURNAM SINGH AND CO
Shri MahaLakshmi Rigs
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
Shri MahaLakshmi Rigs
Friends Tubewell
GURNAM SINGH AND CO
Expert Drillers
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
Friends Tubewell
GURNAM SINGH AND CO
Shri MahaLakshmi Rigs
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
GURNAM SINGH AND CO
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
Shri MahaLakshmi Rigs
Friends Tubewell
Shri MahaLakshmi Rigs
Friends Tubewell
GURNAM SINGH AND CO
Shri MahaLakshmi Rigs
Friends Tubewell
GURNAM SINGH AND CO
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
Shri MahaLakshmi Rigs
Friends Tubewell
GURNAM SINGH AND CO
Shri MahaLakshmi Rigs
Friends Tubewell
GURNAM SINGH AND CO
Shri MahaLakshmi Rigs
Friends Tubewell
GURNAM SINGH AND CO
Shri MahaLakshmi Rigs
Friends Tubewell
GURNAM SINGH AND CO
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
Shri MahaLakshmi Rigs
Friends Tubewell
GURNAM SINGH AND CO
GURNAM SINGH AND CO
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
Shri MahaLakshmi Rigs
Friends Tubewell
GURNAM SINGH AND CO
Shri MahaLakshmi Rigs
Friends Tubewell
GURNAM SINGH AND CO
Shri MahaLakshmi Rigs
Friends Tubewell
Shri MahaLakshmi Rigs
Friends Tubewell
GURNAM SINGH AND CO
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
Shri MahaLakshmi Rigs
Friends Tubewell
GURNAM SINGH AND CO
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
Friends Tubewell
GURNAM SINGH AND CO
Shri MahaLakshmi Rigs
Friends Tubewell
GURNAM SINGH AND CO
Shri MahaLakshmi Rigs
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
Friends Tubewell
Shri MahaLakshmi Rigs
Friends Tubewell
GURNAM SINGH AND CO
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
Friends Tubewell
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
GURNAM SINGH AND CO
Shri MahaLakshmi Rigs
Friends Tubewell
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
Shri MahaLakshmi Rigs
Friends Tubewell
GURNAM SINGH AND CO
Shri MahaLakshmi Rigs
Friends Tubewell
GURNAM SINGH AND CO
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
Shri MahaLakshmi Rigs
Friends Tubewell
GURNAM SINGH AND CO
Shri MahaLakshmi Rigs
Friends Tubewell
GURNAM SINGH AND CO
Shri MahaLakshmi Rigs
Friends Tubewell
GURNAM SINGH AND CO
Shri MahaLakshmi Rigs
Friends Tubewell
GURNAM SINGH AND CO
Shri MahaLakshmi Rigs
Friends Tubewell
GURNAM SINGH AND CO
Shri MahaLakshmi Rigs
Friends Tubewell
GURNAM SINGH AND CO
Shri MahaLakshmi Rigs
Friends Tubewell
GURNAM SINGH AND CO
GURNAM SINGH AND CO
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
Friends Tubewell
Shri MahaLakshmi Rigs
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
Shri MahaLakshmi Rigs
Friends Tubewell
GURNAM SINGH AND CO
GURNAM SINGH AND CO
Friends Tubewell
Shri MahaLakshmi Rigs
Shri MahaLakshmi Rigs
Friends Tubewell
GURNAM SINGH AND CO
Shri MahaLakshmi Rigs
Friends Tubewell
GURNAM SINGH AND CO
Shri MahaLakshmi Rigs
Friends Tubewell
GURNAM SINGH AND CO
GURNAM SINGH AND CO
Shri MahaLakshmi Rigs
Friends Tubewell
Shri MahaLakshmi Rigs
Friends Tubewell
GURNAM SINGH AND CO
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
GURNAM SINGH AND CO
Shri MahaLakshmi Rigs
Friends Tubewell
GURNAM SINGH AND CO
Shri MahaLakshmi Rigs
Friends Tubewell
Friends Tubewell
Shri MahaLakshmi Rigs
GURNAM SINGH AND CO
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .