| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹59.3 LAccepted-AOC | L1 | Accepted-AOC Work order issued | |
| 2 | L2₹52.3 L+₹2.0 L (3.90%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹59.5 L+₹9.2 L (18.4%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | Rejected-Technical | - | Rejected-Technical Technical Evaluation Dis Qualify |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
19 Feb 2026, 5:00 pmClosed
EE
Nagar Nigam Gorakhpur
Construction work of residential building above Maheva Workshop
2026_DOLBU_1112749_1
FFC Mahewa Work Shop
Open Tender
Civil Works
Percentage
120 days
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
Nagar Nigam Gorakhpur
₹1.2 L
14 May 2026
5 Feb 2026
20 Feb 2026
5 Feb 2026
19 Feb 2026
5 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1A | |||||
| 1.01 | Providing and laying R.C.C. in foundation and plinth beams and top beams slab with 1:1.5:3 cement, coarse sand and 20mm stone ballast and axcluding supply of steel but including its fixing and binding curing complete and including all complete for proper completion of the work. Sl No.284(b) | 58.06 | Cum | 9,082 | ₹5,27,300.92 |
| 1.02 | Mild steel or iron work such as reinforced concrete wrought to required shape as necessary including bending for proper completion of the work and including supply of steel Sl. No. 504 | 58.06 | Qtl | 7,690 | ₹4,46,481.4 |
| 1.03 | M150 brick work in 1:4 cement and coarse sand mortar in super structure including in all complete Sl No. 305B+309 | 106.18 | Cum | 6,052 | ₹6,42,601.36 |
| 1.04 | Providing and laying R.C.C. in lintels in doors and windows and slabs with 1:1.5:3 cement, coarse sand and 20mm stone ballast and axcluding supply of steel but including its fixing and binding curing complete and including all complete for proper completion of the work. Sl No.284(b) | 77.34 | Cum | 9,082 | ₹7,02,401.88 |
| 1.05 | Mild steel or iron work such as reinforced concrete wrought to required shape as necessary including bending for proper completion of the work and including supply of steel Sl. No. 504 | 91.08 | Qtl | 7,690 | ₹7,00,405.2 |
| 1.06 | Providing and laying 12 mm thick plaster with 1:3 cement and coarse sand mortar. Sl No.583 | 1,193.18 | Sqm | 159 | ₹1,89,715.62 |
| 1.07 | Finishing walls with water proof cement paint of approved make and quality on new work with three coats to give an even shade. Including supply of all material, labour and T & P etc required for proper completion of the work Sl No.- 660+661 | 1,707.6 | Sqm | 113 | ₹1,92,958.8 |
| 1.08 | Finishing walls with water proof cement paint of approved make and quality on new work with three coats to give an even shade. Including supply of all material, labour and T & P etc required for proper completion of the work Sl No.- 660+661 | 1,707.6 | Sqm | 92 | ₹1,57,099.2 |
| 1.09 | Providing and laying in flooring with cement concrete 1:2:4 cement, coarse sand and 20mm stone ballast including all complete for proper completion of the work. Sl No.279(b) | 24.92 | Cum | 8,186 | ₹2,03,995.12 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.67 MB
FFC.pdf
Tender Documents • 2.65 MB
BOQ_2058580.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .