Loading…
Loading…
Tender Value
₹77.0 L
EMD Value
₹1.5 L
Closing Date
31 Aug 2026, 12:00 pm7d left
EE PHED Dn Chohtan
EE PHED Dn Chohtan
Construsction and commissioning of open wells with pipe line at 2 Nos GP Sanau and 1 Nos GP Goliyar under dn Chohtan Barmer
2026_PHCJO_588219_1
2026-27/07C
Open Tender
Civil Works
Percentage
EE PHED Dn Chohtan
As per TD
2 documents required · 2 mandatory
₹1,500
EE PHED Dn Chohtan
₹1.5 L
Yes
14 Aug 2026
14 Aug 2026
31 Aug 2026
14 Aug 2026
31 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PHED BSR-2023Revised | - | - | - | - |
| 2 | CONSTRUCTION & COMMISSIONING OF OW With Pipe Line at KUMHARO AND PUROHITO KA PADA VILLAGE AND GRAM PANCHAYAT SANAU | - | - | - | - |
| 3 | 2.39 Earth work in excavation over areas (exceeding 30cm depth, 1.5 mtr in width and 10 SQM in plan) for construction of open well, lift up to 1.5 Mtr. including taking out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 meter. 2.39.1 All kind of soil | 103.92 | Cubic Meter | 314 | ₹32,630.88 |
| 4 | 2.39 Earth work in excavation over areas (exceeding 30cm depth, 1.5 mtr in width and 10 SQM in plan) for construction of open well, lift up to 1.5 Mtr. including taking out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 meter. 2.39.2 Ordinary Rock | 207.84 | Cubic Meter | 674 | ₹1,40,084.16 |
| 5 | 2.39 Earth work in excavation over areas (exceeding 30cm depth, 1.5 mtr in width and 10 SQM in plan) for construction of open well, lift up to 1.5 Mtr. including taking out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 meter. 2.39.2 Ordinary Rock Add 20% extra over item No. 2.39 for excavation in saturated soil where pumping or baling out of water is required, including shoring strutting where required and dewatering. | 34.64 | Cubic Meter | 809 | ₹28,023.76 |
| 6 | 2.40 Add extra over item No. 2.39.1 for every additional lift of 1.5 Mtr. or part thereof : In all kind of soils. | 986.1 | Cubic Meter | 47 | ₹46,346.7 |
| 7 | 2.41 Add extra over item No. 2.39.2-4 for every additional lift of 1.5 Mtr. or part thereof : In Ordinary rock and hard rock. | 10,487.26 | Cubic Meter | 67 | ₹7,02,646.42 |
| 8 | 2.43 Labour charges for horizontal boring 100 mm dia in open well in rocky strata with all types of rock cutting & drilling tools etc. including all T&P required for job including dewatering arrangement. | 200 | Meter | 626 | ₹1,25,200 |
| 9 | Providing and laying in position specified grade of cement concretee for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. M20 grade Nominal Mix / Design Mix | 92.2 | Cum | 4,934 | ₹4,54,914.8 |
| 10 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for : Walls (any thickness) including attached pilasters, buttresses plinth and string course. | 590 | Sqm | 289 | ₹1,70,510 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
BOQ_1044594.xls
BOQ • 0.32 MB
OWTD.pdf
Tender Documents • 4.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].