Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.8 LAccepted-AOC | ₹19.8 L Quoted ₹20.0 L | L1 | Accepted-AOC Responsive |
| 2 | L2₹20.3 L+₹27,939 (1.40%)Rejected-AOC | ₹20.3 L+₹27,939 (1.40%) | L2 | Rejected-AOC Responsive |
| 3 | L3₹21.1 L+₹1.1 L (5.43%)Rejected-AOC B1 BLOCK II DIBANG RESIDENCY PENSIONPARA ROAD GUWAHATI 3 | KAMRUP METRO | ASSAM | 781001 | ₹21.1 L+₹1.1 L (5.43%) | L3 | Rejected-AOC Responsive |
Tender Value
₹19.0 L
EMD Value
₹38,100
Closing Date
16 Nov 2023, 2:00 pmClosed
SE, PWD, Jorhat Building Circle, Jorhat
O/O SE, PWD, Jorhat Building Circle, Jorhat
Completion of Half done work at Sarupathar Indoor Stadium Sarupathar Phase I
2023_PWBNH_33362_1
SE(B)/JHT/C/S/S-13/23-24/1555
Open Tender
Civil Works - Building
Item Rate
180 days
Sarupathar
Please refer Tender documents.
4 documents required · 4 mandatory
₹381
₹38,100
Yes
O/O SE, PWD, Jorhat Building Circle, Jorhat
6 Feb 2024
31 Oct 2023
16 Nov 2023
31 Oct 2023
16 Nov 2023
31 Oct 2023
7 Nov 2023
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Brick flat soling
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand(zone-III) : 6 graded stone aggregate 20 mm nominal size).
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Mild steel and Medium Tensile steel bars
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers
Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources)
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size).
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand)
Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete
Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level. Cement mortar 1:4 (1 cement : 4 coarse sand)
Gautam Bagaria
Sri Girin Chutia
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .