Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹8.4 Cr
EMD Value
₹16.9 L
Closing Date
17 Aug 2026, 6:00 pmClosed
OFFICE OF ADDITIONAL CHIEF ENGINEER,WATER RESOURCE
OFFICE OF ADDITIONAL CHIEF ENGINEER,WATER RESOURCES ZONE, UDAIPUR (RAJ.)
Rehabilitation of dam and Repair and New Construction Work of Canals Asind -Hurda (Asind) Bhilwara
2026_WRDAS_577654_1
NIT-03/26-27/ACE2548/WRD-I/BHL
Open Tender
Civil Works
Percentage
365 days
ASIND
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
AS NIT CONDITIONS
₹16.9 L
Yes
OFFICE OF ADDITIONAL CHIEF ENGINEER,WATER RESOURCE
18 Aug 2026
27 Jul 2026
18 Aug 2026
27 Jul 2026
17 Aug 2026
27 Jul 2026
6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Julicflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting.
Ordinary | 88,800 | Sqm | 1.45 | ₹1,28,760 |
| 2Removal of slit/soil/earth, sand, pebbles, 'Malba', debris, rubbish, stone pebbles & obstruction deposited in canal bed up to design line grade and sections having design due to erosion/scour/slips in canal banks/silting with or without bushes and weeds etc. in dry or moist condition from canal bed including dewatering, loading unloading and disposal at suitable place as directed by Engineer in charge with initial lead of 50m. and lift upto 1.5 m with proper dressing on canal bed complete in all respect | |||||
| 2.1 | (i) lined section | 5,374 | Sqm | 28 | ₹1,50,472 |
| 2.2 | (i) Unlined section | 2,774.4 | Sqm | 18 | ₹49,939.2 |
| 3 | Demolishing stone rubble masonry including stacking of useable material and disposal of unuseable material within 50 meters lead inclusive of de-watering wherever required. in In Lime mortar poor quaility | 511.2 | Cum | 293.3 | ₹1,49,934.96 |
| 4 | Providing, Fabrication, machining with straightening work of Guide Tee, Track, Sealing frame, Leaf frame or any part of gate's, complete as per drawing with testing, including cost of all materials, with machinery, labour, tools and tackles cutting, aligning, welding, finishing, cleaning etc., applying one coat of zinc rich epoxy primer and two coats of cold applied coal tar epoxy paint, etc., complete as per specifications and approved drawings with all lead and lifts, including packing & forwarding, transportation charges for structural steel components and other materials.
Rate of work with all material | 1,000 | Kg. | 113.56 | ₹1,13,560 |
| 5 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect
Hard soil mixed with kankar/boulder, morrum | 2,724.48 | Cum | 99 | ₹2,69,723.52 |
| 6 | Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de- watering wherever required complete in all respect.
Soft / Disintegrated rock | 1,167.64 | Cum | 134 | ₹1,56,463.76 |
| 7 | Excavation with line drilling, controlled blasting near structures , populated area (situated within 50m) including dewatering, loading, unloading, disposal & dressing with ininitial lead of 50 m and lift up to 1.5 m complete in all respect in dry or moist and also including compensation of damages if any , in :
Hard rock (dry or moist) requiring blasting (where hardness of rock is more than 2) including dewatering, disposal of excavated material in the designated spoil bank/embankment and dressing of excavated material with all leads & lifts of excavation and disposal. The contractor is free to use the usable excavated stone elsewhere for which any transportation expenditure & royalties, tax etc. if required to be paid, then it will be liability of contractor as the cost of usable stone has already been deducted from the rate. | 119.7 | CUM | 443 | ₹53,027.1 |
| 8 | Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto
20mm | 882.4 | Cum | 4,818 | ₹42,51,403.2 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.25 MB
TechnicalbidKHARIDAM.pdf
Tender Documents • 1.49 MB
BOQ_1026593.xls
BOQ • 0.32 MB
FinalFinancialKHARI.pdf
Tender Documents • 3.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .