Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹8.4 LSame as L1Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹8.4 LSame as L1Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹8.4 LSame as L1Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹8.4 LSame as L1Rejected-Finance | L5 | Rejected-Finance L5 |
Tender Value
₹9.9 L
EMD Value
₹29,732
Closing Date
3 Mar 2026, 3:00 pmClosed
CE
Ghaziabad Nagar Nigam
Repair work of damaged subsidiary lanes of Ward-60 Shyampark Main Gali No. 03 by CC.
2026_DOLBU_1119907_10
110/Nirman/2025-26 Date 21.02.2026
Open Tender
Civil Works
Percentage
CE
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,416
₹29,732
8 Jul 2026
25 Feb 2026
3 Mar 2026
25 Feb 2026
3 Mar 2026
25 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking out existing cc interlocking paver blocks from foothpath/central verge including removal of rubbish etc disposal of unserviceable material to the dumping ground for which payment shall be made separately and stacking | 195 | cum | 100.45 | ₹19,587.75 |
| 2 | Dismentling reinforced cement concrete or reinforced brick work including stacking of material | 1.15 | sqm | 1,340 | ₹1,541 |
| 3 | Dismentling brick work or stone work in lime or cement mortar and including stacking of material as directed | 14.34 | cum | 600 | ₹8,604 |
| 4 | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30 M. and including filling watering | 76.8 | cum | 110 | ₹8,448 |
| 5 | Earth work in embackment filling ordinary soil excavation | 59.92 | cum | 295.1 | ₹17,680.93 |
| 6 | Providing and laying of 4cm gauge stone ballaste in 1:4:8 (one cement four coarsend derived | 11.52 | sqm | 4,000 | ₹46,080 |
| 7 | R.c.c. work with cement approved coarsend and 2cm gauge approved stone ballaste in the proportion of 1;1.5:3 in lintel for door an window excluding supply of reinforced and its bindin | 32.16 | cum | 8,640 | ₹2,77,862.4 |
| 8 | S/F M.S. tor steel or plain in plain work such as R.C.C or r.b. work including brnding for proper shape as necessary including bending for proper complition of the work and including supply of all steel wasteage bend hools and authorised | 20.2 | cum | 8,166 | ₹1,64,953.2 |
| 9 | Supply and laying spreading and compacting 22.4 mm to 53 mm size stone aggregate of specification in uniform thickness hand picking rolling with 3 wheeled road | 27.3 | cum | 2,151.2 | ₹58,727.76 |
| 10 | Consolidration of stone aggregate of 45-63 mm/22.4-53mm size to water bound macadam specification including spreading in uniform thickness hand packing rolling with three wheel 80-100kn static roller in stages to proper grade and camber applying and brooming crushable screening ti fill up the | 27.3 | NO | 690 | ₹18,837 |
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
BOQ_2082999.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .