Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
25 Jul 2023, 4:00 pmClosed
Executive Engineer Electric Division JPDCL Poonch
Executive Engineer Electric Division JPDCL Poonch
Annual Rate Contract for Repair of Damage Transformer in respect of Electric Sub Division JPDCL Plant Potha/Poonch
2023_PDD_220925_1
e-NIT No.EDP/74 of 2023 dated.11.07.2023
Open Tender
Electrical and Maintenance Works
Item Rate
90 days
Poonch
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
Yes
Executive Engineer Electric Division JPDCL Poonch
₹20,000
Yes
4 Aug 2023
11 Jul 2023
27 Jul 2023
11 Jul 2023
25 Jul 2023
11 Jul 2023
400 KVA Distribution transformers (Al/copper wound)
Labour charges including unloading of damaged tfrs at workshop, detanking/deassembling for assesment of damages, reassembling, refitting of coils, core, including all sundry items to be replaced and re-tanking up of assembled core,filtration of fresh/old transformer oil, testing and loadin for dispatch etc (complete job)
Labour charges for repairing, welding of transformer tank,radiators, Aressting of oil leakages etc if any
Labour Charges for cleaning and washing of transformer tank, radiators, top covers etc
Labour charges for painting of transformer tank (inner and outer side), radiators (complete job)
Reconditioning of LV Coil…(Copper)
Reconditioning of LV Coil…(Aluminium)
Winding of HV coil….(Copper)
Winding of LV coil….(Copper)
Winding of HV coil….(Aluminium)
Winding of LV coil….(Aluminium)
Labour Charges for weighing, stacking and loading of Aluminium/copper Scrap etc
Description of Work / Item(s)
250 KVA Distribution transformers (Al/copper wound)
Labour charges including unloading of damaged tfrs at workshop, detanking/deassembling for assesment of damages, reassembling, refitting of coils, core, including all sundry items to be replaced and re-tanking up of assembled core,filtration of fresh/old transformer oil, testing and loadin for dispatch etc (complete job)
Labour charges for repairing, welding of transformer tank,radiators, Aressting of oil leakages etc if any
Labour Charges for cleaning and washing of transformer tank, radiators, top covers etc
Labour charges for painting of transformer tank (inner and outer side), radiators (complete job)
Reconditioning of LV Coil…(Copper)
Reconditioning of LV Coil…(Aluminium)
Winding of HV coil….(Copper)
Winding of LV coil….(Copper)
Winding of HV coil….(Aluminium)
Winding of LV coil….(Aluminium)
Labour Charges for weighing, stacking and loading of Aluminium/copper Scrap etc
Description of Work / Item(s)
100 KVA Distribution transformers (Al/copper wound)
Labour charges including unloading of damaged tfrs at workshop, detanking/deassembling for assesment of damages, reassembling, refitting of coils, core, including all sundry items to be replaced and re-tanking up of assembled core,filtration of fresh/old transformer oil, testing and loadin for dispatch etc (complete job)
Labour charges for repairing, welding of transformer tank,radiators, Aressting of oil leakages etc if any
Labour Charges for cleaning and washing of transformer tank, radiators, top covers etc
Labour charges for painting of transformer tank (inner and outer side), radiators (complete job)
Reconditioning of LV Coil…(Copper)
Reconditioning of LV Coil…(Aluminium)
Winding of HV coil….(Copper)
Winding of LV coil….(Copper)
Winding of HV coil….(Aluminium)
Winding of LV coil….(Aluminium)
Labour Charges for weighing, stacking and loading of Aluminium/copper Scrap etc
Description of Work / Item(s)
63 KVA Distribution transformers (Al/copper wound)
Labour charges including unloading of damaged tfrs at workshop, detanking/deassembling for assesment of damages, reassembling, refitting of coils, core, including all sundry items to be replaced and re-tanking up of assembled core,filtration of fresh/old transformer oil, testing and loadin for dispatch etc (complete job)
Labour charges for repairing, welding of transformer tank,radiators, Aressting of oil leakages etc if any
Labour Charges for cleaning and washing of transformer tank, radiators, top covers etc
Labour charges for painting of transformer tank (inner and outer side), radiators (complete job)
Reconditioning of LV Coil…(Copper)
Reconditioning of LV Coil…(Aluminium)
Winding of HV coil….(Copper)
Winding of LV coil….(Copper)
Winding of HV coil….(Aluminium)
Winding of LV coil….(Aluminium)
Labour Charges for weighing, stacking and loading of Aluminium/copper Scrap etc
Description of Work / Item(s)
25 KVA Distribution transformers (Al/copper wound)
Labour charges including unloading of damaged tfrs at workshop, detanking/deassembling for assesment of damages, reassembling, refitting of coils, core, including all sundry items to be replaced and re-tanking up of assembled core,filtration of fresh/old transformer oil, testing and loadin for dispatch etc (complete job)
Labour charges for repairing, welding of transformer tank,radiators, Aressting of oil leakages etc if any
Labour Charges for cleaning and washing of transformer tank, radiators, top covers etc
Labour charges for painting of transformer tank (inner and outer side), radiators (complete job)
Reconditioning of LV Coil…(Copper)
Reconditioning of LV Coil…(Aluminium)
Winding of HV coil….(Copper)
Winding of LV coil….(Copper)
Winding of HV coil….(Aluminium)
Winding of LV coil….(Aluminium)
Labour Charges for weighing, stacking and loading of Aluminium/copper Scrap etc
Madina Electrical Works
C.T ELECTRICAL ENGINEER
ABBAS ELECTRICAL WORKS
ABBAS ELECTRICAL WORKS
Madina Electrical Works
C.T ELECTRICAL ENGINEER
ABBAS ELECTRICAL WORKS
Madina Electrical Works
C.T ELECTRICAL ENGINEER
ABBAS ELECTRICAL WORKS
Madina Electrical Works
C.T ELECTRICAL ENGINEER
ABBAS ELECTRICAL WORKS
Madina Electrical Works
C.T ELECTRICAL ENGINEER
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .