Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Fee/PreQual/Technical/Finance | -3.50% | ₹2.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.5 L+₹8,628.62 (3.61%)Admitted-Fee/PreQual/Technical/Finance | -0.02% | ₹2.5 L+₹8,628.62 (3.61%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹2.5 L+₹11,157.70 (4.66%)Admitted-Fee/PreQual/Technical/Finance | +1.00% | ₹2.5 L+₹11,157.70 (4.66%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.5 L
EMD Value
₹4,940
Closing Date
1 Sept 2026, 6:00 pmClosed
XEN REW UDHAMPUR
XEN REW UDHAMPUR
BOQ
2026_RDPR_322238_27
2nd Call e-NIT No. 130 REW UDHAMPUR of 2026-27 Dated 24-08-2026
Open Tender
Civil Works
Percentage
30 days
UDHAMPUR
NIT
2 documents required · 2 mandatory
₹600
XEN REW UDHAMPUR
₹4,940
9 Sept 2026
25 Aug 2026
2 Sept 2026
25 Aug 2026
1 Sept 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in Excavation by manual labour in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.All kinds of soil. | 7 | cum | 479.3 | ₹3,355.1 |
| 2 | Providing and laying c.conc 1:5:10 mix using 40 mm n/s agg and curing complete | 13 | cum | 4,826.5 | ₹62,744.5 |
| 3 | Providing and laying c.conc 1:3:6 mix using 20 mm n/s agg and curing complete. | 9.6 | cum | 5,733.6 | ₹55,042.56 |
| 4 | Cetring and shuttering including strutting, propping etc and removal of the formwork. Foundation, footing | 15.24 | Sqm | 286.35 | ₹4,363.97 |
| 5 | Providing and fixing interlocking tiles 60mm thick over bed of sand including all leads and lifts | 77.36 | Sqm | 816.15 | ₹63,137.36 |
| 6 | Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone | 9.02 | cum | 2,793 | ₹25,192.86 |
| 7 | Carriage of Sand 65Km MT & 200m at | 11.85 | cum | 1,238.45 | ₹14,675.63 |
| 8 | Carriage of Stone Aggregates 15km MT & 200m at | 21.05 | cum | 676.23 | ₹14,234.64 |
| 9 | Carriage of Stons 100m at | 7.66 | cum | 287.48 | ₹2,202.1 |
| 10 | Cost of Sign Board | 1 | No. | 3,000 | ₹3,000 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
BOQ_1079035.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .