| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.2 LAccepted-Finance NO 15 KANNAGI NAGAR KORATTUR CHENNAI 600 080 | CHENNAI | CHENNAI | TAMIL NADU | 600080 | L1 | Accepted-Finance L1 Tenderer | |
| 2 | L2₹16.5 L+₹26,626.70 (1.64%)Accepted-Finance | L2 | Accepted-Finance L2 Tenderer | |
| 3 | L3₹16.8 L+₹62,227.30 (3.84%)Accepted-Finance | L3 | Accepted-Finance L3 Tenderer | |
| 4 | L4₹17.1 L+₹91,467.70 (5.64%)Accepted-Finance 19B CHIDAMBARANATHAPURAM DEVAKOTTAI SIVAGANGAI DISTRICT | PUDUKKOTTAI | TAMIL NADU | 621308 | L4 | Accepted-Finance L4 Tenderer | |
| 5 | L5₹18.9 L+₹2.7 L (16.4%)Accepted-Finance | L5 | Accepted-Finance L5 Tenderer |
Tender Value
Refer Docs
EMD Value
₹17,900
Closing Date
19 Jan 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer, GCC II ,230 KV CMRL GIS S
Superintending Engineer, GCC II ,230 KV CMRL GIS SS , Alandur, chennai 16.
As Per NIT
2021_EB_190628_1
OT-47/20-21 of SE/GCC-II/CNI
Open Tender
Civil Works
Works
120 days
Mepz SS
Please refer Tender Documents.
2 documents required · 2 mandatory
₹0
₹17,900
Yes
29 Jan 2021
8 Jan 2021
20 Jan 2021
8 Jan 2021
19 Jan 2021
9 Jan 2021
90 days
Amount
Earth work excavation hard red earth, shales, murram gravel, stoney earth and earth mixed with small size boulders, hard gravelly soil and depositing on bank with initial lead of 10m and lift of 2m etc.,complete.
Hire charges for JCB for clearing bushes and scrub jungles and levelling the site including all labour, fuel charges etc., complete.
Sand filling including cost of sand, filling charges, labour for watering and consolidation leads and lift etc., complete.
Plain cement concrete 1:3:6using 20mm HBG Stone without form work including cost of all materials lead and lift etc., complete.
R:C:C 1:1:5:3 using 12 to 20mm metal without form work for Raft including cost of all materials, curing, labour, lead, etc., complete.
RCC 1:1.5:3, with 20mm HBG m/c metal with form work for grade beam, RCC Column, RCC wall and including cost of all materials, all labour, lead, lift, form work, all T&P's etc. complete (But excluding the cost of steel reinforcement)
PCC 1:2:4, with 20mm HBG m/c metal without form work including cost of all materials, cement, all labour, lead, lift, etc. complete.
PCC 1:2:4, with 12 to 20 mm HBG m/c metal with form work above GL including cost of all materials, cement, all labour, lead, lift, etc. complete. But excluding the cost of steel reinforcement.
Providing Brick work in Cement mortar 1:5 using second class, table moulded by using size 9" x 4 1/2" x 3" including cost of all materials, labour lead lift all T & P's, Scoffolding, pointing, curing etc complete and as directed by the Engineer at site.
Supplying, fabricating and placing in position of steel reinforcements including cost of steel, binding wire, labour, lead, lift etc complete.
Fabrication & Assembling of template in position including the cost of materials labour, lead, lift, all T&P's etc complete and as directed by the engineer at site etc complete.
Providing grout holes for equipment structure including the cost of all materials form work labour all T&P, lead, lift etc., complete.
Fabricating supply and fixing in position of 20/16 mm dia bolt & nut for equipment plinth 20 mm dia bolt of 1.25 m length
Fabricating supply and fixing in position of 20/16 mm dia bolt & nut for equipment plinth 16 mm dia bolt of 0.75 m length
Fabrication and Labour charges for fixing of GI angles of 50x50x6mm size vertically @ 75cm c/c to the required length for supporting the cable in the cable duct in correct position including labour, cutting etc., complete as per the drawing and std.specification.
Plastering in CM 1:3 12 mm thick including cost of all materials, labour, lead, lift etc. complete.
Colour washing two coat approved cement paint over white washing including cost of all materials, scaffolding, labour with all leads and lifts etc., complete.
Supplying, spreading, filling, watering, consolidation and rolling of gravel for lowlying area including cost of gravel, labour for consolidation, watering lead, lift, etc., complete.
Supplying and spreading of quarry dust for yard area including cost of quarry dust, labour for consolidation, lead, lift, etc. complete.
Supplying and spreading of 20mm HBG metal for yard area including cost of all material, labour for consolidation, lead, lift, etc. complete.
Supplying and fixing of PVC pipe ISI branded and approved quality as indicated below for water line, sanitory line etc., including cost of PVC special
Supply and fixing of 1/2" PVC tap of approved brand and quality including cost of all materials labour, lead, lift etc.,complete
Supplying and laying of Pre cast RCC well rings for earth pit having inner dia 0.60 m, thick ness 75mm and 0.30m depth including cost of all materials, labour, curing placing in correct position, lead, lift, etc., complete and as directed by the Engineer at site.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
Dillibabu
S and G CONSTRUCTION
S S AND CO
J SABARI
K DHINAKARAN
JD ENTERPRISES
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .