Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹6.3 L+₹56,948.50 (9.96%)Rejected-Finance | L2 | Rejected-Finance Rejected | |
| 3 | L3₹6.8 L+₹1.1 L (19.7%)Rejected-Finance | L3 | Rejected-Finance Rejected | |
| 4 | L4₹7.2 L+₹1.5 L (26.0%)Rejected-Finance | L4 | Rejected-Finance Rejected | |
| 5 | L5₹7.4 L+₹1.7 L (29.3%)Rejected-Finance D SHALA DISTT KANGRA HP | L5 | Rejected-Finance Rejected |
Tender Value
Refer Docs
EMD Value
₹21,860
Closing Date
22 Jan 2024, 11:00 amClosed
Executive Engineer
Jal Shakti Division Arki
SH Construction of PCC Retaining wall at damaged portion occurred due to heavy slide at front side building of JE quarter at JS Section Balera
2024_HPIPH_83936_1
ARK-SOL01-425-8213-63
Open Tender
Civil Works
Item Rate
90 days
JSV Sub Division Arki
Please refer Tender documents.
7 documents required · 7 mandatory
₹400
EE Arki
₹21,860
Yes
30 Jan 2024
12 Jan 2024
22 Jan 2024
12 Jan 2024
22 Jan 2024
12 Jan 2024
Amount
Cutting in earth work and disposal of excavated earth upto a lead of 20 metres:- Pick & Jumper work complete in all respects.
Excavation in foundation, trenches etc. earth work in all type of soil such as pick work, jumper work, blasting work kankar,moorum singles including decomposed soft and hard rock etc. upto all heights stacking the excavated earth not more than 3 metres clear from the edge of excavation and then returning the stacked soil in 15cm layers when required into plinths and sides of foundation etc.consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth upto all leads and lifts as directed by the Engineer in charge complete in all respects.
Providing and laying cement concrete 1:4:8 (1 cement:4 sand:8 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in: Foundation and plinth: including carriage of materials upto all leads and lifts complete in all respects.
Providing form work with mild steel plates 3.15 mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centering, shuttering, strutting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor to ceiling not ex eeding 4 meters and removal of the same for insitu reinforced concrete work and plain concrete work in :-
Vertical surfaces such as walls(any thickness )partition and the like including attached pillasters, buttresses plinth and string courses and like including all leads and lifts etc. complete in all respects.
Providing and laying cement concrete 1:5:10(1 Cement :5 Sand : 10 graded stone aggregate 40mm nominal size)and curing complete excluding the cost of form work in:-
Walls including attached buttresses pilasters and their caps and bases and string courses etc. upto floor two level including carriage of materials up to all leads and lifts complete in all respects.
BHUWNESH KUMAR
Sh. Lekh Raj Sharma
Chetan Thakur
KULDEEP KUMAR
Madho Ram Govt. Contractor
HARISH
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .