Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.7 LAccepted-AOC H NO 21666 POWER HOUSE ROAD STREET NO 9 BATHINDA PB 151001 | BATHINDA | PUNJAB | 151001 | L1 | Accepted-AOC Lowest and reasonable bid | |
| 2 | L2₹38.6 L+₹4.0 L (11.5%)Rejected-Finance 25 25 SADAR BAZAR JALANDHAR CANTT | JALANDHAR | JALANDHAR | PUNJAB | L2 | Rejected-Finance Other than lowest bid | |
| 3 | Rejected-Technical | - | Rejected-Technical Applicant does not fulfils the eligibility category | |
| 4 | Rejected-Technical | - | Rejected-Technical Applicant does not fulfils the eligibility class. Two class below eligible class |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
25 Dec 2020, 6:00 pmClosed
Garrison Engineer (East) Jalandhar Cantt
Garrison Engineer (East) Jalandhar Cantt
REPAIR/ COMPREHENSIVE MAINT, MANNING AND OPERATION OF LIFTS AT MH JRC UNDER GE (EAST) JALANDHAR CANTT
2020_MES_372989_5
GE/JULL/ET-40/2020-21
Open Tender
Civil Works
Item Rate
335 days
Jalandhar Cantt
Please refer Tender documents.
11 documents required · 11 mandatory
₹1,000
Garrison Engineer (East) Jalandhar Cantt
₹1.2 L
Yes
5 Feb 2021
9 Dec 2020
28 Dec 2020
9 Dec 2020
25 Dec 2020
12 Dec 2020
Amount
Outsourcing service for operation of electric passenger lift of speed 1.0 M/Second 680 Kgs 10 passengers capacity electrically operated with duplex collective control catering 4 floors including ground floor installed in Admn Block ‘A’ ( Lift No-01) in two shifts as mentioned below :- (a) 0600 hrs to 1400 hrs (b) 1400 hrs to 2200 hrs Make of lift - Escon Elevators and panel ACE Notes :- 01 Lift Operator (Semi-Skilled) in Each Shift
All as per srl item No. 1.00 above but 20 passengers 1360 Kgs capacity speed 0.55 M/Second (stretcher luggage lift) Admn Block ‘A’ (Lift No-02) in two shifts as mentioned below :- (a) 0600 hrs to 1400 hrs (b) 1400 hrs to 2200 hrs Make of lift - Escon Elevators and panel ACE Notes :- 01 Lift Operator (Semi-Skilled) in Each Shift
Outsourcing service for operation of electric passenger lift of speed 0.55 M/Second 1360 Kgs 20 passengers capacity electrically operated with duplex collective control catering 2 floors including ground floor installed for ICU ( Lift No-03) in two shifts as mentioned below :- (a) 0600 hrs to 1400 hrs (b) 1400 hrs to 2200 hrs Make of lift - Escon Elevators and panel ACE Notes : -01 Lift Operator (Semi-Skilled) in Each Shift
All as per srl item No. 3.00 above but 10 passengers 680 Kgs capacity speed 1.0 M/Second catering 2 floors including ground floor installed for ICU (Lift No-04) in two shifts as mentioned below :- (a) 0600 hrs to 1400 hrs (b) 1400 hrs to 2200 hrs Make of lift - Escon Elevators and panel ACE Notes : -01 Lift Operator (Semi-Skilled) in Each Shift
All as per srl item No. 3.00 above but 20 passengers 1360 Kgs capacity speed 1.0 M/second electrically operated with duplex collective control catering 4 floors including ground floor installed in ‘F’ Block near Labour Room (Lift No-05) in three shifts as mentioned below :- (a) 0600 hrs to 1400 hrs (b) 1400 hrs to 2200 hrs (c) 2200 hrs to 0600hrs Make of lift - Escon Elevators Notes :- 01 Lift Operator (Semi-Skilled) in Each Shift
Outsourcing service for operation of electric passenger lift of speed 1.0 M/Second 680 Kgs 10 passengers capacity electrically operated with duplex collective control catering 4 floors including ground floor installed in Patient Cook House Block (Lift No-06) in one shift as mentioned below :- (a) 0800 hrs to 1600 hrs Make of lift - Escon Elevators
Outsourcing service for operation of electric passenger lift of speed 1.0 M/Second 680 Kgs 10 passengers capacity electrically operated with duplex collective control catering 4 floors including ground floor installed in PSY Ward Block (Lift No-08) in two shifts as mentioned below :- (a) 0600 hrs to 1400 hrs (b) 1400 hrs to 2200 hrs Make of lift - Escon Elevators Notes :- 01 Lift Operator (Semi-Skilled) in Each Shift
Outsourcing service for operation of electric passenger lift of speed 1.0 M/Second 884 Kgs 13 passengers capacity electrically operated with duplex collective control catering 3 floors including ground floor installed for OPD Block (Lift No-09) in one shift as mentioned below :- (a) 0800 hrs to 1600 hrs Make of lift - Kone Elevators Notes :- 01 Lift Operator (Semi-Skilled) in Each Shift
Outsourcing service for operation of electric Hospital stretcher lift of speed 1.0 M/Second 1020 Kgs 15 passengers capacity electrically operated with duplex collective control catering 3 floors including ground floor installed for OPD block in two shifts as mentioned below :- (a) 0600 hrs to 1400 hrs (b) 1400 hrs to 2200 hrs Make of lift - Escon Elevators Notes :- 01 Lift Operator (Semi-Skilled) in Each Shift
Outsourcing service for operation of electric passenger lift (lift No. 2 & 3) 2 Nos of speed 0.55 M/second of 20 passengers 1360 Kgs capacity electrically operated with duplex collective control lift No. 2 catering 4 floors including ground floor and lift No. 3 catering 02 floor including ground floor installed at MH in one shift as mentioned below ;- (a) 2200 hrs to 0600 hrs Make of lift - Escon Elevators and panel ACE Notes :- 01 Lift Operator (Semi-Skilled) in Each Shift
Servicing / Maintenance of passenger lifts G+3 (06 Nos), G+1 (02 Nos) total-08 Nos (Make Escon) by topping up oil in gear box and railing, and greasing all required parts, cleaning of car top and lift pit, electric power operated doors, auto electric leveling device installed, on the following points including checking tightening of all nut bolts electric connection, alingement of rope, greasing as required, also removing of fault as and when occurred by replacing the unserviceable parts like main microprocessor card, main relay card, contactor 110V DC, landing roller, brake shoe, Incentring roller, landing lock, cargate lock, door shoe, landing gate complete lock with roller, pickup cam, limit switch, read switch, VVF4 formator, air cord, landing/car door formator, formator belt, formator cam, door motor, including taking out to old U/S parts and fixing of new parts, connecting, testing commissioning and making to lift in serviceable condition in minimum possible time all as specified and directed.
Servicing / Maintenance of passenger lifts G+2 (02 Nos) (Make KONE) by topping up oil in gear box and railing, and greasing all required parts, cleaning of car top and lift pit, servo electric power operated doors, auto electric leveling device installed, on the following points including checking tightening of all nut bolts electric connection, alingement of rope, greasing as required, also removing of fault as and when occurred by replacing the unserviceable parts like main microprocessor card, main relay card, contactor 110V DC, landing roller, Incentring roller, landing lock, brake shoe, cargate lock, door shoe, landing gate complete lock with roller, pickup cam, limit switch, read switch, door drive, air cord, landing/car door formator, formator belt, formator cam, door motor, including taking out to old U/s parts and fixing of new parts and fixing of new parts. connecting testing commissioning and making to lift in serviceable condition in minimum possible time all as specified and directed.
Note for item No 11.00 and 12.00 : - (i) The above Maintenance shall be done through only E-in-C Branch's approved OEM rep or authorised agent of OEM ie M/S Kone india/ M/S Schneider India Pvt Ltd/ M/S Kinetic Hyundai Elevator & movement technologies ltd/M/S Hitachi lifts India Pvt Ltd/M/S Mitsubhishi elevator India Pvt Ltd/M/S Otis elevator company india ltd/M/S Fujitech India Pvt Ltd/ M/S Johnson lifts Pvt Ltd/ M/S Thyssenkurupp Elevator India Pvt Ltd / M/S Omega elevators/ M/S ESCON Elevators Pvt Ltd/ M/s LT Elevators Pvt Ltd/ M/S IES Elevators/WVT elevators/ACE Lift or any other OEM approved by E-in-Cs branch (ii) The Contractor will have to submit MOU (Memorandum of Understanding) alongwith the tender, failure which tender will not be opened. (iii) Successful bidder/ contractor will have to submit MOU on stamp paper duly Notarised, as per specified Performa. (iv) All the spare parts of the Lift shall be purchased from the OEM or his authorised distributor (v) Any spare parts required to be replaced (except Sr No 13.00 to 30.00 here in after) during the period of 11 month in any lift shall be replaced by the contractor within the cost of this item. Nothing shall be paid extra on this account.
Material and labour for disconnecting of electric motor of capacity 15 HP from lift, taking motor to workshop for rewinding/repair opening of motor, taking out burnt winding wire and rewinding with super enameled copper winding wire of suitable size/ gauge & turns as per compatibility of capacity of motor including proper insulation, heat varnishing , drying with proper heat , reassembling electric motor, taking motor to lift machine room, connecting with lift and testing complete all as specified and directed.
Supply and fix in replacement of the car door for opening 1200 mm wide telescopic side opening G+3 lift of Escon with car header and door formator including 1.2 mm 18 gauge 304 grade stainless steel door panel in moon rock finish lift of Escon with header and door with lock complete functional accessories including infrared door curtain sensor/detector consisting of the emitter and receiver, power supply box, flexible cables, relay output 1A, 230 VAC/2A , 30 VDC, operating temperature 20 degree to 85 degree, 154 beams, response time 61 ms, high beam 1860mm, lowest beam 25mm and protection distance 0 to 5 metres including necessary accessories for fixing sensors complete all as specified and directed. Make : as per MOU submitted.
Supply and fix in replacement of car door 800mm centre opening G+3 Lift of Escon with car header and door formator including 1.2mm 18 gauge 304 grade stainless steel door panel in moon rock finish lift of Escon with header and door with lock complete functional accessories including infrared door curtain sersor/ detector consisting of the emitter and receiver, Power supply box, flexible cables relay output 1A, 230 VAC/2A 30 VDC, operating temperature 20 degree to 85 degree, 154 beams, response time 61 ms, highest beam 1860mm, lowest beam 25mm and protection distance 0 to 5 metres including necessary accessories for fixing sensors complete all as specified and directed Make : as per MOU submitted.
Supply and fix in replacement of landing door 800mm centre opening automatic G+3 1.2mm 18 gauge 304 grade stainless steel door panel in moon rock finish lift of Escon with header and door with lock complete formator including functional accessories complete all as specified and directed. Make as per MOU submitted.
Supply and fix in replacement of landing door 1200mm side opening automatic G+3 1.2mm 18 gague 304 grade stainless steel door panel in moon rock finish lift of Escon with header and door with lock complete formator including functional accessories complete all as specified and directed. Make as per MOU submitted.
Supply and fix in replacement of landing push button box along with illuminated call buttons, direction indicator & 7-segment position indicator etc. Make : As per MOU submitted.
Supply and fix in replacement steel wire rope standred 13mm dia and 8/19 ply suitable for existing lift complete as specified and directed including taking down old one Make : Usha martin or equivalent
Supply and fix in replacement of travelling cable 12 core to withstand 1100 Volts from half way junction box to the cabin junction with good quality highly flexible cables for safety circuits, call buttons, position indicators, levelling systems, etc suitable for travelling with car upto machine room. Make : Havells, Finolex, Kalinga, RR Cable, Roliflex
Material and Labour for replacement of traction sheave four grove for 13 mm rope made with cast iron suitable for Escon lift complete all as specified and directed
Material and Labour for replacement of infrared door curtain sensor of lift to open it automatically/keep it open until any person or article is in the door, consisting of the emitter and receiver, power supply box, flexible cables, relay and contractor of suitable size, operating temperature 20 degree to 85 degree, 154 beams, response time 61ms, highest beam 1860mm, lowest beam 25mm and protection distance 8 to 5 meters including necessary accessories for fixing sensor complete suitable for lift 10 passenger 680 Kg or 20 Passenger 1360 Kg of Escon complete all as specified and directed
Material and Labour for replacement of ARD (automatic rescue device) panel of lifts, ARD main card input DC voltage 48 VDC output voltage 230 VAC, ARD power card, relay card with relay of suitable size, contactor 220 VAC, Power bank (12 V 12 AH-04 Nos) transformer of capacity 3.5 KVA and necessary cable connection with suitable size of wires and other items required to make ARD panel fully functional, testing on completion all as specified and directed. Make : As per MOU submitted.
Material and Labour for replacement header for landing door of size 1200mm with rollers, spring assembly, lock contacts by dismantling old header and assembling new header with all necessary joining material nuts, bolts, washers, welding, riveting etc required all as specified. Make : As per MOU submitted.
Material and Labour for replacement header for landing door of size 800mm with rollers, spring assembly, lock contacts by dismantling old header and assembling new header with all necessary joining material nuts, bolts, washers, welding, riveting etc required all as specified. Make : As per MOU submitted
Material and Labour for replacement header for car door of size 1200mm with rollers, cam car door motor, formator, lock contacts by dismantling old header and assembling new header with all necessary joining material nuts, bolts, washers, welding, riveting etc required all as specified. Make : As per MOU submitted
Material and Labour in replacement car operating panel (COP) made of stainless steel for lift 10 passenger 680kg, 800mm considering 04 floors including ground floor with LED display showing indication of floor, up or down arrows, DODC switch, switch for G+3 floors fan switch and stop switch including all necessary material connecting all wiring complete all as specified and directed. Make : As per MOU submitted.
Material and Labour in replacement car operating panel (COP) made of stainless steel for lift 20 passenger 1360kg, 1200mm considering 04 floors including ground floor with LED display showing indication of floor, up or down arrows, DODC switch, switch for G+3 floors fan switch and stop switch including all necessary material connecting all wiring complete all as specified and directed. Make : As per MOU submitted.
Material and Labour for replacement floor announcing system for lifts with box and speaker fixed on car top for clear sound in car announcing floor number on reaching on concerned floor and playing music while going up and down including all connecting wiring, sensing and all other material required for smooth operation of sound system complete all as specified and directed.
Material and Labour for replacement of D locking device assembly complete of lift 10 passenger 680 kg or 20 passenger 1360 kg of landing door and door key for easily open the door complete all as specified and directed
CHOUDHARY AND SONS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .