| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.6 CrAccepted-AOC | ₹18.6 Cr | L1 | Accepted-AOC L1 m/s preeti Bildcon |
| 2 | L2₹19.2 CrRejected-Finance D 172 SAKET MEERUT DISTRICT MEERUT | MEERUT | MEERUT | UTTAR PRADESH | ₹19.2 Cr | L2 | Rejected-Finance L2 |
Tender Value
Refer Docs
EMD Value
₹38 L
Closing Date
10 Dec 2020, 4:00 pmClosed
SE MEERUT CIRCLE PWD MEERUT
SE MEERUT CIRCLE PWD MEERUT
Widening and Strengthening of Tanda Ramala road (ODR) in District Baghpat.
2020_CEMRT_534677_1
4359/11 cashier M.C.(C.D. Bpt)/20 Dt.18.11.20
Open Tender
Civil Works
365 days
EE CD PWD BAGHPAT
CLASS A
3 documents required · 3 mandatory
₹2,354
₹38 L
SE MEERUT CIRCLE PWD MEERUT
16 Jan 2021
3 Dec 2020
11 Dec 2020
3 Dec 2020
10 Dec 2020
3 Dec 2020
5 Dec 2020
Amount
Cleaning jungle including up rooting of rank, vegetations grass, push, wood trees and amplings of grith upto 30 cms. measured at a height of 1 M. above ground level and removal of rubbish up to a distance of 50M. out side the periphery of area cleared. as per SI No. 259 Including all taxes & labour cess but excluding GST.
Excavation in Soil using Hydraulic Excavator /JCB and Tippers with Disposal upto 30 metres. Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead. Including all taxes & labour cess but excluding GST.
Construction of embankment with approved material obtained from borrow pits with all lifts (Distance 1.00 km) and all leads, transporting to site, spreading, grading to required slope and mechanicalley compacting to meet requirement of table 300-2. (Ref. to Mort&H Specification No.305) Rate as per PWD SI No.253 Including all taxes & labour cess but excluding GST.
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 Rate as per PWD SI No.253 Including all taxes & labour cess but excluding GST.
Dismantling of existing structures,like Interlocking Tiles, culverts,bridges,retaining wall and other structure comprising of brick masonary,including unerviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202..Rate as per PWD SI No.10.29 New Item 4 Including all taxes & labour cess but excluding GST.
Resoling with dismantelled Bricks assumming 60% of the dismanteleed bricks to be non-usable (60% of Item 12)(Labur Only) .Rate as per PWD SI No10.2New Item 17
Dismantling of existinng old Brick laid on edge including stacking of old Brick as per PWD S.I No 10.29 New Item 4
Relaying of Bricking soling With Straight over Brunt laid on edge and dry (Labour Only) assumming 60% of the dismanteleed bricks as servicable Including preparation of subgrade to Prescribed camber filling Joint withy local earth spradind a blinding 1cm depth of local earth over the entire surface and including labour t&P etc for proper completion of the work as per PWD S.I NO 10.26 Item No.786
Construction of Boundry pillar brick masonry work in cemnet Mortar 1:4 in Foundation complete excluding Bricks, Pointing and plastering as per Drawing and Technical Specifications. (Excluding Bricks) Qty as per sheet at as per PWD S.I. no 6.04 & item No. 305a)
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per MORTH clause 401. Including all taxes & labour cess but excluding GST.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per MORTH clause 406 Including all taxes & labour cess but excluding GST.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam with 3.50% emulsion SS and 1% cement specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Including all taxes & labour cess but excluding GST.
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. Including all taxes & labour cess but excluding GST.
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.2 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. Including all taxes & labour cess but excluding GST.
Providing and laying dense graded bituminous macadam with 80-100 TPH producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. Including all taxes & labour cess but excluding GST.
Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects
Dismantling of Rainforcement cement concrete reinforcement brick work or Brick masonary, Stone Work and including stacking of Materials as Directed by the Engineer-in Cahrge SI No.12.05 Item 697 Including all taxes & labour cess but excluding GST.
Excavation in foundation in ordinary soil (loam clay and sand) including lift upto 1.50 M and lead upto 30M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the side of foundation treches as per S.I. No. 251
Cement concrete with 4 cm gauge with brick ballast, fine sand and cement in proportion 1:6:12 in foundation, mechanically mixed and vibrated including supply of all material, labour and T&P etc. required for proper completion of work. as per SI No. 273 Including all taxes & labour cess but excluding GST.
Cement concrete with 2cm gauge approved stone aggregate, coarse sand and cement in proportion 4:2:1 in foundation, mechanically mixed and vibrated including supply of all material, labour and T&P etc. required for proper completion of work. as per SI No. 279a Including all taxes & labour cess but excluding GST.
Cement concrete with 4 cm gauge approved stone aggregate, coarse sand and cement in proportion 6:3:1 in foundation, mechanically mixed and vibrated including supply of all material, labour and T&P etc. required for proper completion of work. as per SI No. 279b Including all taxes & labour cess but excluding GST.
Sand filling Including all taxes & labour cess but excluding GST
Cost of RCC NP3 350mm dia hume Pipe Including all taxes & labour cess but excluding GST.
Add laying & fixing charges as per New Schedule item no. 10.27 Including all taxes & labour cess but excluding GST.
M-150 class brick work in 1:4 cement and Course sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. (as per PWD SI No. 305(a) Including all taxes & labour cess but excluding GST.
Pointing with cement mortar (1:2) on brick work in substructure as per Technical Specifications SI.No. 574 Including all taxes & labour cess but excluding GST.
12 mm thick plaster with 1 part of cement and 4 part of Fine sand over brick work including supply of all materials, labour and T&P etc. required for proper completion of work. As per PWD SI No. 582) Including all taxes & labour cess but excluding GST.
R.C.C. work with cement, approved coarse sand and 20 mm gauge approved stone grit in proportion of 1:1.5:3 in slabs excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I binding wire and including necessary centering and shuttering etc. required for proper completion of work, binding wire to be supplied by the contractor free of cost. as per SI 284a (for Drain Cover & Culvert Wearing Coat Including all taxes & labour cess but excluding GST.
R.C.C. work with cement, approved coarse sand and 20 mm gauge approved stone grit in proportion of 1:1½:3 in slabs excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I binding wire and including necessary centering and shuttering etc. required for proper completion of work, binding wire to be supplied by the contractor free of cost. as per SI 284a (For Culvert Slab & Bed Block) Including all taxes & labour cess but excluding GST.
M.S. torsteel in plain work such as R.C.C. or R.B. work including binding for proper shape and including supply of steel and its wastage, bend hooks and autorised overlapping shall be measured. As per SI 504 Including all taxes & labour cess but excluding GST.
Road marking with Hot applied thermoplastic compound with reflectorising glass beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads @ 250gms per sqm area, thickness of 2.5mm is exclusive of surface applied glass beads as per IRC 35. The finished surface to be level, uniform and free from streaks and holes. rates are inclusve all taxes, royalty, etc. all T&P/machine material and labour required for proper completion of work. (SI. No-7 New Item) page No-60
Reflective Raised Pavement marker with shanks providing and fixing of raised pavement markers with twin shanks of adequate length anchored with epoxy/ bitumen adhesive of approved made (cat Eye) type x- ASTMD- 4956-04 Avery Dennision/3m (USA make) having moulded bady of polycarbonate, ASA, HIPS or ABS able to support a load of 13.635 M.T. tested in accordance with ASTMD 4280 type H and other requirement mentioned in MoRT&H cirular, its reflective lens made of micro prismatic lens (capable of providing total internal reflection of light) electronically welded to the body. the length, height and width of the body shall not exceed 130mm, 20mm and 105mm respectively, the area af each reflective surface shall not be less than 13sq. cm. on each side sloping at the angle of 35 + 5 degree to the base to ensure maximum reflectively. it shall comply to specification of category A of MoRT&H circular no. RW/NH 33023/10/97-DO-III dated 11-06-97 lenses shall be moulded of methyl methecrylate conforming to ASTMD 788 or equivalent. with 7 years warranty, rate shall be inclusive of all taxes, royalty. etc. all T&P/ machine material and labour required for proper completion of work. Note:- The composite warranty jointly signed by original manufacturer & authorized converter of at least 7 years shall be furnished on non judicail stamp of required denomination. (SI. No- 11 New item) page no-62
Providing and laying of hot applied thermoplastic compound 5 mm thick for repeated bar marking including reflectorising glass beads @ 250 gms per sqm area, thickness of 5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. ( For Repeated bar marking in abadi portion )
Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 5th kilometre, kilometer, Hectometer stone (15.90 km)
M/S CHAUDHARY ASSOCIATES
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Download all tender documents and submit your bid