Loading…
Loading…
Tender Value
₹3.0 L
EMD Value
₹5,900
Closing Date
3 Sept 2026, 4:30 pm6d left
ER FAYAZ AHMED SHEIKH
XEN REW OFFICE RAMBAN
AS PER NIT
2026_RDPR_322245_4
NIT No - 20.4 OF REW RAMBAN OF 2026-2027 BLOCK RAMBAN, DDC Dated 22-08-2026
Open Tender
Civil Works
Percentage
30 days
RAMBAN
REFER TO THE TENDER DOCUMENT
2 documents required · 2 mandatory
₹600
Rural Development and Panchayati Raj
₹5,900
25 Aug 2026
25 Aug 2026
5 Sept 2026
25 Aug 2026
3 Sept 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:ALL KINDS OF SOIL | - | cum | 592.9 | - |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10MIX with 40mm nominal aggregates all complete. | - | cum | 4,826.5 | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | - | cum | 5,733.6 | - |
| 4 | 30% BOULDERS in item no.03. | - | cum | 857.3 | - |
| 5 | Brick work with common burnt clay F.P S ( non modualar) bricks of class designation 75 in foundation and plinth cement mortar 1:6 (1 cement :6 fine sand). | 1 | cum | 7,571.55 | ₹7,563.98 |
| 6 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 1 | cum | 1,455.65 | ₹1,454.19 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with A) (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1 | cum | 9,821.85 | ₹9,812.03 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Mild steel and medium tensile steel bars | - | Kgs | 115.35 | - |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form. | 1 | sqm | 286.35 | ₹286.06 |
| 10 | Providing and fixing angle iron frames for doors, windows and ventilators of mild steel Angle sections of size 35x35x5 mm, joints mitred and welded by angle iron 35x35x5 mm or 35x 5 mm flat pieces to the existing T-iron frame or to the wall with dash fastener, including fixing of necessary butt hinges and screws and applying a priming coat of approved steel primer, all complete as per the direction of Engineer-In-charge. | 1 | kgs | 135.05 | ₹134.91 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.15 MB
BOQ_1079211.xls
BOQ • 0.30 MB
coriiiiigendumrambansbm.pdf
PDF • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].