Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹15.9 LAccepted-Finance | 1 | Accepted-Finance L1 | |
| 2 | 2₹16.0 L+₹15,245.84 (0.96%)Accepted-Finance | 2 | Accepted-Finance L2 |
Tender Value
₹15.2 L
EMD Value
₹30,492
Closing Date
3 Nov 2026, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Office of the Executive Engineer CD, APWD, Campbell Bay
Providing and laying pipeline for integration of Grazing land pond Govind Nagar to main line at 6.0 km Govind Nagar, Campbell Bay including pumpset
2026_APWD_25468_1
30/EE/CD/CB/2026-27
Open Tender
Civil Works - Others
Percentage
120 days
Executive Engineer CD, APWD, Campbell Bay
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹30,492
10 Nov 2026
27 Oct 2026
3 Nov 2026
27 Oct 2026
3 Nov 2026
27 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift up to 1.5 m, as directed by Engineer-in-Charge: | |||||
| 1.01 | All kinds of soil | 0.68 | cum | 120.15 | ₹81.7 |
| 2Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
| 2.01 | 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). | 0.29 | cum | 19,087.95 | ₹5,535.51 |
| 3Centering and shuttering including strutting, propping etc. and removal of form for : | |||||
| 3.01 | Foundations, footings, bases of columns, etc. for mass concrete | 6.4 | sqm | 428.35 | ₹2,741.44 |
| 4Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
| 4.01 | 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.9 | cum | 21,414.14 | ₹19,272.73 |
| 4.02 | 1:3:6 (1 Cement : 3 coarse sand(zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources). | 1.04 | cum | 20,531.2 | ₹21,352.45 |
| 5Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
Tenderdocument30.pdf
Tender Documents • 0.79 MB
BOQ_26969.xls
BOQ • 0.32 MB
Instructions-to-bidders.pdf
Additional Documents • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .