Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 8 1 B DIAMOND HARBOUR ROAD KOLKATA 700027 | KOLKATA | KOLKATA | WEST BENGAL | 700027 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
3 Nov 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SEKAR HIRUDHAYAM
TECHNIP INDIA LTD, CHENNAI
Cooling Tower Works for Numaligarh Refinery Expansion Project
2021_NRL_640840_1
082176C/NRL/T/COOLING TOWER/03
Open Tender
Oil/Gas
Lump-sum
600 days
NUMALIGARH
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
Exempted
Online
14 Dec 2021
29 Jul 2021
4 Nov 2021
29 Jul 2021
3 Nov 2021
6 Oct 2021
20 Aug 2021
120 days
Amount
Project management, consistency checks, Process design , detailed design engineering including mechanical design, HAZOP/SIL Study and other safety studies as mentioned in Bidding Documents, 3D modelling, Site development and enabling jobs, soil investigation and underground scanning as mentioned in the Bidding Documents and co-ordination for the same with Owner/ Consultant, total procurement (including chemicals, first fill of chemicals and lubricants consumables, special tools and tackles, pre-commissioning spares, commissioning spares, start-up spares and mandatory spares), fabrication, manufacturing, quality assurance, inspection and expediting, third party inspection, supplies, transportation, handling and storage of all equipment, materials, items and other construction materials at yard/site, fabrication, assembly, construction, erection, installation of all plant machinery including civil, structural, mechanical, piping, electrical and instrumentation including tie-ins, testing, insulation, painting, fireproofing, first fill of chemicals and lubricants, obtaining all Applicable Permits, statutory approvals (except for environment clearance), Pre-commissioning and Mechanical Completion of package, preparation of Package specific operating manuals, start-up, Commissioning and Performance Guarantee Test Runs (PGTR), training of Owner’s operation and maintenance personnel, consumables (chemicals and lubricants) for 6 (six) months operation of the Plant, Contract closure activities of COOLING TOWER WORKS as detailed in Bidding Documents and interconnection systems in accordance with the Bidding Documents, Final invoice/billing and handing over of the Facilities with Final and “as built” drawing/documentation, Project data and information handing over specification in accordance with the Bidding Documents, supply of spares with necessary support and services during Defect Liability Period and supply of chemicals, Tools & tackles, consumables, lubricants, refrigerants etc. for initial charge and replenishment of any loss of these during Commissioning up to handing over after successful PGTR of the Facilities WITH SINGLE POINT RESPONSIBILITY AS DEFINED IN THE BIDDING DOCUMENT
FOR COOLING TOWER WORKS WITH SINGLE POINT RESPONSIBILITY AS DEFINED IN THE BIDDING DOCUMENT
Description of Work / Item(s)
Amount
PRICE FOR SUPPLY PORTION FOR COMPLETION OF SCOPE OF WORK AS PER BIDDING DOCUMENT FOR COOLING TOWER WORKS
PRICE FOR SUPPLY PORTION FOR COMPLETION OF SCOPE OF WORK AS PER BIDDING DOCUMENT FOR COOLING TOWER WORKS
PRICE FOR BUILT IN IMPORT CONTENT COVERED IN SR . NO. 1.01 SUPPLY PORTION ABOVE AS PER BIDDING DOCUMENTS
PRICE FOR BUILT IN IMPORT CONTENT COVERED IN SR . NO. 1.01 ABOVE (i.e. PRICE FOR SUPPLY PORTION) AS PER BIDDING DOCUMENTS (CFR INDIA PORT PRICE)
Description of Work / Item(s)
Amount
PRICE FOR ENGINEERING (DESIGN AND DETAIL ENGINEERING) AND CONSTRUCTION PORTION AS PER REQUIREMENTS DETAILED OUT IN VARIOUS SECTIONS OF BIDDING DOCUMENTS
ENGINEERING PRICE (DESIGN AND DETAIL ENGINEERING AS PER REQUIREMENTS DETAILED OUT IN VARIOUS SECTIONS OF BIDDING DOCUMENT)
PRICE FOR CONSTRUCTION PORTION AS PER REQUIREMENTS DETAILED OUT IN VARIOUS SECTIONS OF THE BIDDING DOCUMENT
TOTAL OF ENGINEERING AND CONSTRUCTION PRICE [TOTAL OF SR. NO. 1.01 + 1.02]
Description of Work / Item(s)
Amount
GST ON SUPPLY OF GOODS (BREAKUP OF FORM SP-1)
GST ON SUPPLY OF SERVICES (BREAKUP OF FORM SP-2)
Description of Work / Item(s)
Amount
O & M SPARES FOR WORKS AS PER BIDDING DOCUMENT
Description of Work / Item(s)
Amount
GUARANTEED UTILITIES
Electrical Power Consumption For Cooling Water System
HP Steam Consumption for Turbine Driven CW pumps (3 nos.) For Cooling Water System
Paharpur Cooling Towers Limited
Paharpur Cooling Towers Limited
Paharpur Cooling Towers Limited
Paharpur Cooling Towers Limited
HAMON SHRIRAM COTTRELL PRIVATE LIMITED
Paharpur Cooling Towers Limited
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .