Loading…
Loading…
Tender Value
₹93.0 L
EMD Value
₹1.9 L
Closing Date
20 Jul 2026, 4:00 pm
General Manager, CRITL/O.E
General Manager CRITL/O.E office, Kuasi Colony Dor
Annual operation and Preventive maintenance works, Emergency Maintenance work of 220/33 KV GIS Smart City Ranchi for One (1) year
2026_JSEB_115653_1
302/PR/JUSNL/2026-27
Open Tender
Electrical Works
365 days
Ranchi Jharkhand
Please refer the tender document
3 documents required · 3 mandatory
₹11,800
₹1.9 L
Kusai Colony,Doranda, Ranchi, Jharkhand
29 Jun 2026
29 Jun 2026
21 Jul 2026
29 Jun 2026
20 Jul 2026
29 Jun 2026
3 Jul 2026
A.Operation Part
Supply of Highly skilled (Diploma) Manpower - 4 Nos. for Shift Duty under operation (Rate should in month wise)
Supply of Skilled (ITI) Manpower - 4 Nos. for Shift Duty under operation (Rate should in month wise)
Supply of Un-skilled (Matric) Manpower - 4 Nos. for Shift Duty under operation (Rate should in month wise)
B.Preventive/Emergency Maintenace Part
GIS Engineer charges for 220 KV (GE Make), 33 KV (ABB make) including for GIS Power Transformer (Toshiba make), control & Relay Panel, SST including all GIS equipments for monthly preventive visit and maintenance works and on emergency as per site requirement.
Rental for SF6 Gas Manometer & Analyzer
Rental charges for CRM Kit
Rental charges for portable UHF Analyzer
GIS Engineer travel charges including loadging, boading, fooding etc.
Service Engineer Charges if required for Transformer's Part, PLCC/SCADA Panel, DTPC, GPRS, OPGW, DC Detector etc., AHU, DC Chargers, Lifts, Fire System (Fixed Cost/call) inclusive of travelling, boarding, lodging, fooding etc.
Engineer Charges per day
Testing of transformer oil by recognized laboratory including supply of sampling bottle
Supply of Consumables viz. Markin cloth, Distilled water, Grease, Mobil, Nuts & Bolts, Cotton waste, Joute, Paterollium Jelly, Kerosine, mobil, WD-40 rust remover etc. required time to time for O&M works of GSS.
Sub Total of Part (A)
Approximate increase in VDA during a year @10% on Sub Total A (Sl.No. 1 to 3)
Sub Total Rs. A1
Contractor profit @ 10 % on Sub-Total A1
Overhead Expenditure for Safety Kit and T&Ps @ 03 % on Sub Total A1
EPF Contribution of Employer@12% on Sub-Total A1
Administrative Charges @ 1% on Sub-Total A1
ESIC Contribution of Employer @ 3.25% on Sub-Total A1
Total of Part A
Total Part (B)
Sub Total C (Total Part A +Total Part B)
GST@18% on Sub Total C(mailto:GST@18%25%20on%20Sub%20Total%20C塹ᴻ䡿ⲯ嶂藄挧ꮥ)
Sub Total D
Labour Cess @ 1% on Sub Total D
Grand Total
(Rupees …..................................................................................................................) only inclusive GST and other Charges.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
Tenderdocument.pdf
Tender Documents • 1.08 MB
Pricepart.xls
Additional Documents • 0.04 MB
Download all tender documents and submit your bid