Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.7 LAccepted-Finance | ₹5.7 L | 1 | Accepted-Finance satisfied |
| 2 | 2₹6.0 LAccepted-Finance 3 140 H 1 PERIYAR STREET AMMAN NAGAR METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | ₹6.0 L | 2 | Accepted-Finance satisfied |
| 3 | 3₹6.1 LAccepted-Finance 2 222 B 10 PONMAGAR METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | ₹6.1 L | 3 | Accepted-Finance satisfied |
| Sl No | Description | Qty | Unit | SS ENGINEERING CONTRACTOR L2 | SRINIVASA ENGINEERING CONTRACTORS L1 | PREETHI ENTERPRISES L3 |
|---|---|---|---|---|---|---|
| 1.00 | Charges for overhauling of Sludge disposal pump includes dismantling of pump components, cleaning, inspection and renewal of worn-out parts and reassembling. | 1 | No | 38,000 ₹38,000 | 37,200 ₹37,200 | 38,100 ₹38,100 |
| 2.00 | Complete alignment & checking the operation of clarifier sludge disposal pump motor, sludge disposal pump and its suction & delivery pipe lines and its 150 mm gate valves. | 1 | No | 12,500 ₹12,500 | 12,300 ₹12,300 | 12,600 ₹12,600 |
| 3.00 | Charges for Overhauling of 150 / 200 mm size 100 / 125 Class Gate valves of cold & Hot water Tunnel Vent in Cooling Water system I including dismantling of vent pipe , complete dismantling the valve, Lapping the valve disc & seat area renewal of spares, Gland Packing and rubber gasket and assembling. | 10 | Nos | 7,700 ₹77,000 | 7,500 ₹75,000 | 7,800 ₹78,000 |
| 4.00 | Charges for cleaning the algae and other foreign materials on the outer surface and painting with two coats Of Enamel Yellow / black paint on handrails and Epoxy smoke grey paint on CT ID Fan blades, gear boxes, G.B. foundation. | 576 | M2 | 140 ₹80,640 | 130 ₹74,880 | 150 ₹86,400 |
| 5.00 | Charges for painting with one coat of rust convertor , one coat of epoxy red oxide primer and one coat of epoxy coal thar black paint one over the other with proper intervals for door structure in sun shield roof, safety grills inside the fan stack area, Gearbox oil level indicator pipe line in Cooling tower –I. | 740 | M2 | 238 ₹1,76,120 | 233 ₹1,72,420 | 240 ₹1,77,600 |
| 6.00 | Charges for draining the oil in 1 No. CT ID Fan gear box, to remove the gear box oil level indicator pipe line from the gear box, cleaning the pipe line and releasing/removing the choke in the pipe using Air/ Water and re fixing the same in the gear box, and topping up of drained / new oil in the gearbox, if any pipe fittings like TEE, Union, Elbow, Bend is damaged it has to be replaced which are under contractor scope. | 11 | Nos | 3,500 ₹38,500 | 3,000 ₹33,000 | 3,600 ₹39,600 |
| 7.00 | Charges for cutting and removal of existing deteriorated bolts of scrappers, removing damaged scrapers, cutting of scrapper rubber to required dimension from old Conveyor Belt, marking and making holes on scrapper rubber and fixing with new G.I Bolts and nuts in the traction & Flocculator drive in Clarifier I. | 2 | Nos | 11,000 ₹22,000 | 10,000 ₹20,000 | 11,500 ₹23,000 |
| 8.00 | Cost of Neoprene Rubber(Black) Gasket , Size,1M X 2 M X5 MM thick For Sl.No.3. | 20 | Kgs | 110 ₹2,200 | 100 ₹2,000 | 115 ₹2,300 |
| 9.00 | Cost of Black Enamel for Sl.No.4. | 8 | litre | 210 ₹1,680 | 200 ₹1,600 | 215 ₹1,720 |
| 10.00 | Cost of Yellow Enamel for Sl.No.4. | 8 | litre | 210 ₹1,680 | 200 ₹1,600 | 215 ₹1,720 |
Tender Value
Refer Docs
EMD Value
₹5,500
Closing Date
3 Feb 2026, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I M I CA CWS I Overhauling of sludge disposal pump and Cold and hot water tunnel vent valves Air Vent valves and allied works
2026_EB_645081_1
CE / MTPS-I / SE / M-I / CA /OT. 456 / 2025 - 26
Open Tender
Power/Energy Projects/Products
15 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹5,500
Yes
9 Feb 2026
20 Jan 2026
4 Feb 2026
20 Jan 2026
3 Feb 2026
20 Jan 2026
Charges for overhauling of Sludge disposal pump includes dismantling of pump components, cleaning, inspection and renewal of worn-out parts and reassembling.
Complete alignment & checking the operation of clarifier sludge disposal pump motor, sludge disposal pump and its suction & delivery pipe lines and its 150 mm gate valves.
Charges for Overhauling of 150 / 200 mm size 100 / 125 Class Gate valves of cold & Hot water Tunnel Vent in Cooling Water system I including dismantling of vent pipe , complete dismantling the valve, Lapping the valve disc & seat area renewal of spares, Gland Packing and rubber gasket and assembling.
Charges for cleaning the algae and other foreign materials on the outer surface and painting with two coats Of Enamel Yellow / black paint on handrails and Epoxy smoke grey paint on CT ID Fan blades, gear boxes, G.B. foundation.
Charges for painting with one coat of rust convertor , one coat of epoxy red oxide primer and one coat of epoxy coal thar black paint one over the other with proper intervals for door structure in sun shield roof, safety grills inside the fan stack area, Gearbox oil level indicator pipe line in Cooling tower –I.
Charges for draining the oil in 1 No. CT ID Fan gear box, to remove the gear box oil level indicator pipe line from the gear box, cleaning the pipe line and releasing/removing the choke in the pipe using Air/ Water and re fixing the same in the gear box, and topping up of drained / new oil in the gearbox, if any pipe fittings like TEE, Union, Elbow, Bend is damaged it has to be replaced which are under contractor scope.
Charges for cutting and removal of existing deteriorated bolts of scrappers, removing damaged scrapers, cutting of scrapper rubber to required dimension from old Conveyor Belt, marking and making holes on scrapper rubber and fixing with new G.I Bolts and nuts in the traction & Flocculator drive in Clarifier I.
Cost of Neoprene Rubber(Black) Gasket , Size,1M X 2 M X5 MM thick For Sl.No.3.
Cost of Black Enamel for Sl.No.4.
Cost of Yellow Enamel for Sl.No.4.
Cost of Rust Convertor for Sl.No.5.
Cost of Epoxy red oxide Primer for Sl.No.5.
Cost of Coal Thar Black Paint for Sl.No.5
Cost of Epoxy Thinner for Sl.No.4&5
Cost of Epoxy Smoke Grey paint for Sl.No.4.
Cost of GI M12x70mm full thread bolt with nut and 2washers for Sl.No.7
Cost of Consumable and T&P For Sl.No.1 to 7
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_773052.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid