Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.0 LAdmitted-Finance | ₹21.0 L | L1 | Admitted-Finance |
| 2 | L2₹21.1 L+₹8,628 (0.41%)Admitted-Finance | ₹21.1 L+₹8,628 (0.41%) | L2 | Admitted-Finance |
| 3 | L3₹21.2 L+₹20,658 (0.98%)Admitted-Finance | ₹21.2 L+₹20,658 (0.98%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | STANDARD ENGINEERING L3 | KARTICK BAL L1 | M/S. G. P. ENTERPRISE L2 |
|---|---|---|---|---|---|---|
| 1.00Labour charges for 1 [one] No operating personnel for operation and guarding of Pump / Valve / Disinfection arrangement with all accessories. W.E.F 01.10.2026 to 30.09.2027 | ||||||
| 1.01 | Sitakundu (Zone-I) PH-1 | 365 | Days | 690 ₹2,51,850 | 683 ₹2,49,295 Lowest | 685 ₹2,50,025 |
| 1.02 | Belegachi PH-1 | 365 | Days | 690 ₹2,51,850 | 683 ₹2,49,295 Lowest | 685 ₹2,50,025 |
| 1.03 | Belegachi PH-2 | 365 | Days | 690 ₹2,51,850 | 683 ₹2,49,295 Lowest | 685 ₹2,50,025 |
| 1.04 | Nor PH-1 | 365 | Days | 690 ₹2,51,850 | 683 ₹2,49,295 Lowest | 685 ₹2,50,025 |
| 1.05 | Teurhat PH-2 | 365 | Days | 690 ₹2,51,850 | 683 ₹2,49,295 Lowest | 685 ₹2,50,025 |
| 1.06 | Uttarbhag PH-1 | 365 | Days | 690 ₹2,51,850 | 683 ₹2,49,295 Lowest | 685 ₹2,50,025 |
| 2.00PART-B Supervision charges for whole electrical installation by licensed electrician as per IE Rules 1956 read with latest amendments overhead expenditures. | ||||||
| 2.01 | Sitakundu (Zone-I) PH-1 | 12 | Months | 8,510 ₹1,02,120 | 8,436 ₹1,01,232 Lowest | 8,495 ₹1,01,940 |
| 2.02 | Belegachi PH-1 | 12 | Months | 8,510 ₹1,02,120 | 8,436 ₹1,01,232 Lowest | 8,495 ₹1,01,940 |
Tender Value
Refer Docs
EMD Value
₹42,200
Closing Date
11 Sept 2026, 6:00 pmClosed
Executive Engineer SMD PHE Dte
Chetla
Operation and guarding of the electric operated auto /manual controlled pumping machinery at Sitakundu Zone-I, Belegachi, Nor, Teurhat, Uttarbhag W/S Scheme of Baruipur Block under south 24 pgs Mechanical Division PHE Dte.
2026_PHED_5019632_12
WBPHE/EE/SMD/NIeT-10 of 2026-27 (2nd Call)
Open Tender
Electrical Work/ Equipment
Item Rate
365 days
Baruipur Block
Please refer Tender documents.
6 documents required · 6 mandatory
₹42,200
24 Sept 2026
24 Aug 2026
14 Sept 2026
24 Aug 2026
11 Sept 2026
24 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Labour charges for 1 [one] No operating personnel for operation and guarding of Pump / Valve / Disinfection arrangement with all accessories. W.E.F 01.10.2026 to 30.09.2027 | |||||
| 1.01 | Sitakundu (Zone-I) PH-1 | - | Days | - | - |
| 1.02 | Belegachi PH-1 | - | Days | - | - |
| 1.03 | Belegachi PH-2 | - | Days | - | - |
| 1.04 | Nor PH-1 | - | Days | - | - |
| 1.05 | Teurhat PH-2 | - | Days | - | - |
| 1.06 | Uttarbhag PH-1 | - | Days | - | - |
| 2PART-B Supervision charges for whole electrical installation by licensed electrician as per IE Rules 1956 read with latest amendments overhead expenditures. | |||||
| 2.01 | Sitakundu (Zone-I) PH-1 | - | Months | - | - |
| 2.02 | Belegachi PH-1 | - | Months | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
Tendernotice_2.pdf
PDF • 0.23 MB
Tendernotice_3.pdf
PDF • 0.25 MB
BOQ_5092941.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .