| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAdmitted-Finance MARAR RANCHI ROAD DISTT RAMGARH JHARKHAND | RAMGARH | JHARKHAND | ₹2.1 L | L1 | Admitted-Finance |
| 2 | Rejected-Technical MARAR RANCHI ROAD DIST RAMGARH JHARKHAND 829117 | MARAR | RAMGARH | JHARKHAND | 829117 | - | - | Rejected-Technical Techno commercially not accepted |
| 3 | Rejected-Technical 2ND FLOOR 76A PHUL SARAI RANCHI ROAD DISTT RAMGARH JHARKHAND | RAMGARH | JHARKHAND | - | - | Rejected-Technical Techno commercially not accepted |
| Sl No | Description | Qty | Unit | M/S BHARAT MOTORS L1 |
|---|---|---|---|---|
| 1.00 | A)Rewinding and Repairing of 55 KW/ 75 HP, 1470 RPM, Make KBL Non FLP motor Cost of Copper wire 18 SWG deduction of less scrap value | 44 | KG | 466 ₹20,504 |
| 2.00 | Cost of Insulating materials | 1 | No | 7,690 ₹7,690 |
| 3.00 | Labour Cost | 1 | No | 7,690 ₹7,690 |
| 4.00 | Profit | 1 | No | 3,580 ₹3,580 |
| 5.00 | Cover housing work with men power and materials for welding and turning to bearing size with Cl rod | 2 | No | 11,710 ₹23,420 |
| 6.00 | Dynamic balancing of rotor | 1 | No | 25,000 ₹25,000 |
| 7.00 | Supply & Fixing of LT Epoxy Bushing | 4 | No | 5,730 ₹22,920 |
| 8.00 | B)Repairing of Star Delta Starter Prabhu make- 55KW/ 75 HP, 550V, 3 Phase Auxiliary Contractor | 1 | No | 13,200 ₹13,200 |
| 9.00 | Earth Leakage Relay | 1 | No | 19,020 ₹19,020 |
| 10.00 | Amp meter | 1 | No | 2,410 ₹2,410 |
Tender Value
₹2.5 L
EMD Value
₹3,200
Closing Date
29 Dec 2025, 9:00 amClosed
PE(EnM)
KUGp
Rewinding .Repairing of 55 KW.75HP 1470 RPM make KBL Non FLP motor and Star delta starter Prabhu make 55KW.75HP, 550V 3 Phase at mine No. 03 of KUGP under Hazaribagh area.
2025_CCL_349376_1
PO/KUGP/EnM/Tender/25-26/9
Open Tender
Electrical and Maintenance Works
10 days
KUGP
As per NIT
2 documents required · 2 mandatory
₹3,200
8 Feb 2026
15 Dec 2025
30 Dec 2025
16 Dec 2025
29 Dec 2025
16 Dec 2025
16 Dec 2025 - 20 Dec 2025
A)Rewinding and Repairing of 55 KW/ 75 HP, 1470 RPM, Make KBL Non FLP motor Cost of Copper wire 18 SWG deduction of less scrap value
Cost of Insulating materials
Labour Cost
Profit
Cover housing work with men power and materials for welding and turning to bearing size with Cl rod
Dynamic balancing of rotor
Supply & Fixing of LT Epoxy Bushing
B)Repairing of Star Delta Starter Prabhu make- 55KW/ 75 HP, 550V, 3 Phase Auxiliary Contractor
Earth Leakage Relay
Amp meter
Volt meter
Bushing insulator with stud
110V DC Holding Coil
110V DC Closing Coil
Single Phase Preventer
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.51 MB
BOQ_362118.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid