Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Rejected-Technical 0 BUDKIYA DEVATRA JODHPUR RAJASTHAN 342606 | JODHPUR | RAJASTHAN | 342606 | Rejected-Technical Due to EMD Amount Less |
Tender Value
Refer Docs
EMD Value
₹3,000
Closing Date
25 Apr 2022, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer, EDC, Hapur
Superintending Engineer, EDC, Hapur
Increasing capacity of transformers and replacement of jarjar wire in area of EDD-Garh
2022_PVVNL_689200_1
01(W)/EDCH/2022-23
Open Tender
Electrical Works
Lump-sum
Hapur
enclosed
3 documents required · 3 mandatory
₹1,180
SE, EDC, Hapur
₹3,000
28 Apr 2022
16 Apr 2022
25 Apr 2022
16 Apr 2022
25 Apr 2022
16 Apr 2022
16 Apr 2022 - 25 Apr 2022
180 days
Amount
Increasing Capacity 25/63/100KVA T/F., and additional D/P of 25KVA. at various places as per sanctioned estimate. (25KVA to 63KVA-11Nos., 63KVA to 100KVA-11Nos. And additional 25KVA-01Nos.)
Carriage of PCC Pole 8.5 mtrs. Long and other DP material, from Electricity store center, Hapur/J.E. Store to site of work with loading and unloading at both ends on Kachha Packka road.
Carriage of New 25/63/100KVA transformer from JE, Store/CTR/ESC, Hapur to site of work, with loading & unloading at both ends.
Safely Removal of old 10/25/63/100KVA Transformer from Double Pole and loading of the same, with the help of Manual Labour & Chain Tackle etc.
Mounting, Placing and connecting from LT/HT side of 25/63/100KVA T/F as per RESPO Norms.
Laying of 3.5x70sqmm Cable and connecting of the same for proper completion of work as per RESPO/Drawing Norms.
Carriage of old 10/25/63KVA transformer from site of work to JE Store/CTR/ESC, Hapur and safley unloading the same.
Jumpering work properly as per RESPO/Norms.
Fabrication, erection and fixing of double pole on PCC Pole 8.5 mtr. long with fixing of M.S. Top & Dropper Channel, M.S. S/S Angle, E-Bracket, 11 KV Pin insulator with Pin, Disc Insulator with Disc fitting as per RESPO Drawing/Norms by providing top and dropper clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts.
Grouting & fixing of stay rods (20x1800)mm including all work of excavation, cement concrete in size (0.60x0.60x0.30)m in ratio 1:4:8 cement, sand, 40mm brick ballast as per drg. Including back filling, proper ramming etc and fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing as per RESPO Drawing/Norms by providing all grouting material and stay clamp made of M.S. Flat of size 50x6mm with proper size bolts & nuts & loops.
Earthing of supports with MS earth Rod of (20x2500)mm long including excavation of pit and driving M.S. Rod 3.0 M apart from support and 0.5m below the ground level and connection below the earth electrodes with the help of G.I. wire & earthing lugs as per RESPO Drawing/Norms by providing proper size nuts & bolts.
Increasing Capacity of 100 to 250KVA at various places as per sanctioned estimate.
Opening of the Jumper of LT & HT side at Double Pole.
Safely Removal of old 100KVA Transformer from Double Pole and loading of the same, with the help of Manual Labour & Chain Tackle etc.
Safe Loading of New 250KVA transformer at JE, Store/CTR/ESC, Hapur, with the help of Crane.
Carriage of New 250KVA transformer from JE Store/CTR/ESC, Hapur to site of work.
Construction of T/F plinth suitable for 250KVA T/F (size of 2 x 2 x 1.5 mt.) as per drawing, cc work in foundation in ratio 1:4:8 (Cement, Sand & Brick ballast). Ist class brick work in side walls cc ratio of 1:4 (cement & fine sand). 12mm thick plaster in ratio 1:4 (cement & fine sand). The RCC work on top of plinth in ratio 1:2:4 after duly filling of brick ballast inside the plinth & ramming the same, including cost of all material & labour.
Safe Unloading of New 250KVA transformer from vehicle, with the help of crane at LT Sub-Station and installing of the same on Double Pole/Plinth.
Connecting of the Jumper of LT & HT side and fixing all required accessories at Double Pole/Plinth.
Laying of LT (3x120+1x95+1x16sqmm) Cable and connecting of the same for proper completion of work as per RESPO/Drawing Norms.
Earthing of neutral & body of T/F By Boring and lowering of G.I. Pipe size 32 mm dia… into the ground up to water level 120 fit. With the lower end of solid copper cone approx. 225mm long and 750 gm. in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 SWG from the cone up to the ground surface where it will be bolted to the M.S. earth strip for T/F neutral connection, the earth strip will be welded to the G.I. pipe and neutral earthing support.
Providing fixing and fabrication of wire mesh fencing around the T/F plinth upto 4 fit height on top of T/F plinth, including cost of all material and labour as per drawing
Carriage of old 100KVA transformer from site of work to JE Store/CTR/ESC, Hapur and safley unloading the same.
Jumpering work properly as per RESPO/Norms.
Replacement of Jarjar wire, X-arm, Ressaging of losse line and providing additional pole in long span as per sanctioned estimate.
Carriage of line material (line condcutor, insulator etc) from Electricity store center, Hapur/J.E. Store to site of work with loading and unloading at both ends on Kachha Packka road.
Carriage of PCC Pole 8.5 mtrs. Long from Electricity store center, Hapur/J.E. Store to site of work with loading and unloading at both ends on Kachha Packka road.
Erection & Fixing of PCC Pole 8.5 mtr. long in 11 KV line after digging of suitable pits including fixing of requisite accessories as per RESPO Drawing/Norms by providing F-Bracket made of M.S. Flat of size 50x6 mm, Cross Arm holding Clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts.
Laying , Stringing and final sagging of ACSR Weasel Conductor after binding from Insulator, as per RESPO/Drawing Norms.
Laying , Stringing and final sagging of ACSR Dog Conductor after binding from Insulator, as per RESPO/Drawing Norms.
Ressaging of loose line after binding from insulator as per RESPO/Drawing Norms.
Erection & fixing of 11KV V-type M.S. X-arm on existing pole, providing with holding clamps, nuts & bolts.
Erection & fixing of 11KV Pin Insulator on existing pole, providing required nuts & bolts. as per RESPO/Drawing Norms.
Erection & fixing of Holding Clamps on existing pole, providing required nuts & bolts. as per RESPO/Drawing Norms.
Grouting & fixing of stay rods (20x1800)mm including all work of excavation, cement concrete in size (0.60x0.60x0.30)m in ratio 1:4:8 cement, sand, 40mm brick ballast as per drg. Including back filling, proper ramming etc and fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing as per RESPO Drawing/Norms by providing all grouting material and stay clamp made of M.S. Flat of size 50x6mm with proper size bolts & nuts & loops.
Removal of ACSR Weasel Conductor after opening from Insulator, and bundling of the same.
Removal of ACSR Dog Conductor after opening from Insulator, and bundling of the same.
Carriage of old & used condcutor (100+150+55Kg) from site of work to Electricity store center, Hapur/J.E. Store with loading and unloading at both ends on Kachha Packka road.
Jumpering work properly as per RESPO/Norms.
D S CONTRACTOR
M/S YASH TRADERS HAPUR
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .