Tender Value
₹35.1 L
EMD Value
₹70,180
Closing Date
9 Feb 2026, 6:00 pmClosed
EXECUTIVE ENGINEER PHED DIVISION BEAWAR
EXECUTIVE ENGINEER PHED DIVISION BEAWAR
(NIT 20/25-26) MAINTENANCE OF VARIOUS DISTRIBUTION PIPELINE IN RWSS BIJAYNAGAR ORIGINATING FROM BIJAINAGAR, MASUDA AND KHEEMPURA UNDER DIVISION BEAWAR
2026_PHCJA_533983_7
EE_PHED_Dn_BEAWAR_NIT_14_TO_22
Open Tender
Miscellaneous Works
365 days
AS PER TENDER DOCUMENTS
AS PER TENDER DOCUMENTS
5 documents required · 5 mandatory
₹1,000
EXECUTIVE ENGINEER PHED DIVISION BEAWAR
₹70,180
Yes
16 Feb 2026
31 Jan 2026
10 Feb 2026
31 Jan 2026
9 Feb 2026
31 Jan 2026
Maintenance of pipelines irrespective of size & material which includes Repairing of Bursts & leakages pollution control, survey & removal of choking, disconnection of illegal connections, Collection & recording minimum 10 nos. residual chlorine samples during daily supply timings, interconnections and all works related to pipeline network in existing distribution /rising main pipe lines of all sizes by digging out suitable size of pit in soft and loose soil/ hard soil including cutting of Black top, WBM & CC top of road of any size at work site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and refilling of pit by excavated sand by ramming it at sides of pipes and upto ground level. For entire job contractor will use their own T & P. Contractor with his own resources shall arrange de-watering,JCB & Tractor compressor if any and restore any amenity at his own cost damaged while performing the work in this item. The work includes daily patrolling and repair the leakages within stipulated time and complete maintenance of pipe line network of rising and distribution pipeline network within the scope of work for per km pipe line per month. Jointing material shall be provided by the department.
Minimum labour for a following kms pipelines to be deployed.
51 km to 100 km - one fitter-II & Two beldar(102.00x12 Months=1224 Km )
Daily/ periodical operation of valves at supply times for specified by department per sluice valve per month. Valve rod and cap to be arranged by contractor)
80-300mm(91nos X 12 Months = 1092 nos )
Maintenance of tubewells which includes round the clock monitoring of tubewells of all sizes, complete repairs/rewinding of submersible pump sets including cost of material components required to repair pumpsets, starters, meters etc. of electric panel of tube wells, Lowering and unlowering of pumpsets complete in all respect, maintenance of log-books & Histroy sheet as directed by Engineer-in-charge for tubewell per month.
0.5 HP to 5.0 HP(6nosX 12 months = 72 nos )
6.0 HP to 7.5 HP(27 nos X 12 months = 324 nos)
8.0 HP to 10.0 HP(10 nos X 12 months = 120nos)
11.0 HP to 12.5 HP(2 nos X 12 months = 24 nos)
13.0 HP to 15.0 HP(2 nos X 12 months = 24 nos)
16.0 HP to 25.0 HP(1 nos X 12 months = 12 nos)
Cleaning of Ground water reservoir ( GLR's) of below mentioned capacity including removal of all silt from reservoir, scrapping of wall, disinfection of reservoir after cleaning and disposal of silt up to 1.00 Km lead and painting the date of cleaning on the reservoir.
up to 10 Kl(7nosX 2 times = 14nos)
11 to 15 KL(1nosX 2 times = 2nos)
16 to 20 KL(4nosX 2 times = 8nos)
21 to 25 KL(2nosX 2 times = 4nos)
51 to 100 KL(3nosX 2 times = 6nos)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
merged.pdf
Tender Documents • 0.85 MB
BOQ_951543.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid