Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.3 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹3.3 L+₹1,293.88 (0.39%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹3.4 L+₹8,292.58 (2.52%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹5.9 L
EMD Value
₹11,760
Closing Date
29 Jul 2026, 4:00 pmClosed
XEN REW Kathua
XEN REW Kathua
Construction of Central Drain / Lane of Kishore Ji from the Main Road to his House at Kattal Brahmana Pyt Kattal Brahmna Block Hiranagar
2026_RDPR_316583_12
e-NIT No.124/REW/K of 2026-27 Dated 17/07/2026
Open Tender
Civil Works
Percentage
90 days
HIRANAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹11,760
11 Aug 2026
17 Jul 2026
30 Jul 2026
17 Jul 2026
29 Jul 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil | 20.37 | Cum | 479.3 | ₹9,763.34 |
| 2 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: | 8.49 | cum | 1,725.2 | ₹14,646.95 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 13 | cum | 4,826.5 | ₹62,744.5 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 30% Boulders | 30 | Cum | 5,733.6 | ₹1,72,008 |
| 5 | Supply and Dumping of stones complete | 9.16 | cum | 937 | ₹8,582.92 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 125 | Sqm | 286.35 | ₹35,793.75 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 8.04 | cum | 7,788.4 | ₹62,618.74 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete above plinth level:Thermo-Mechanically Treated bars of grade Fe-500D or more. | 350 | Kg | 123.2 | ₹43,120 |
| 9 | Centering and shuttering including strutting,popping etc and Removal of Formwork:To the Suspended floors and Roofs | 35.04 | sqm | 718.2 | ₹25,165.73 |
| 10 | Providing and laying damp-proof Course 40 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 30.33 | Sqm | 346 | ₹10,492.45 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.97 MB
BOQ_1033137.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .