Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical AT CHHAPADA P O RAHADINGA DISTRICT JAGATSINGHPUR PIN 754104 | JAGATSINGHPUR | JAGATSINGHPUR | ODISHA | 754104 | Accepted-Technical Documents are in order |
| 2 | Accepted-Technical MPV 8 CHITRAGAPALLI MALKANGIRI 764044 | MALKANGIRI | ODISHA | 764044 | Accepted-Technical Documents are in order |
| 3 | Accepted-Technical | Accepted-Technical Documents are in order |
| 4 | Accepted-Technical AT PATHARPUNJI P O BALADIANUAGAON P S FATEGARH DIST NAYAGARH PIN 752077 | NAYAGARH | ODISHA | 752077 | Accepted-Technical Documents are in order |
| 5 | Accepted-Technical QTR NO 2R 31 RIE CAMPUS WARD NO 28 UNIT IX PO SAHEED NAGAR BHUBANESWAR 751022 | KHORDHA | ODISHA | 751022 | Accepted-Technical Documents are in order |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
14 Aug 2026, 5:00 pmClosed
GM(C), OMC Ltd.
Office of the GM(C), OMC Ltd., Bhubaneswar
Construction of RCC Retaining wall in front of Crusher-1 and Crusher-2 at Kodingamali Bauxite Mines in the district of Koraput.
2026_OMC_137590_2
22/OMC/CIVIL/2026
Open Tender
Civil Works - Others
Percentage
245 days
KODINGAMALI MINES
RC, EPF Regd., GSTN, PAN, Registration in CDMS portal, Affidavits, experience, etc. as per DTCN requirements.
2 documents required · 2 mandatory
₹11,800
₹1.1 L
Yes
21 Oct 2026
31 Jul 2026
17 Aug 2026
31 Jul 2026
14 Aug 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil works | |||||
| 1.01 | Excavation, loading & carriage by mechanical means in medium hard rock (can not be scapped or peeled with knife, hanheld specimen can be broken with single moderate blow with pick, crushing strength between 100 to 250 kg/sqcm) in canal, foundation & cut-off trenches of earth dam & other deep cutting by means of Rock Breaker with all lifts, delifts including trimming the bed & slopes to designed finished section, loading into & transportation by taransport vehicle within 1 KM lead & depositing the excaveted materials neatly in specific dump yard as directed by the Enginerer-incharge etc complete | 621 | Cum | 597.8 | ₹3,71,233.8 |
| 1.02 | Filling sand in F&P well watered, rammed including cost, conveyance, royalties of materials, cost of all labour and T&P required for the work etc. complete as per direction of EIC. | 46 | Cum | 1,380.98 | ₹63,525.08 |
| 1.03 | P.C.C. of prop. (1:3:6) in foundation using 40 mm. size broken hard granite metal of approved quality from approved quarry including lowering, laying concrete to required levels laid in layers not exceeding 150mm thick including cost, conveyance, royalties of all materials, watering and curing and cost of all labour, T&P required for the work etc. comp as per direction of EIC. | 46 | Cum | 6,346.22 | ₹2,91,926.16 |
| 1.04 | R.C.C M-20 grade concrete with 20mm & down graded hard crusher broken granite chips in all floors including hoisting and laying concrete,watering and curing for three weeks and finishing the exposed surfaces smooth,providing beads or grooves where necessary including cost,conveyance,royalities of all material,dismantling the centering,shuttering work after the period as specified by EIC and cost of all labour,T &P required for the work complete in all respect,excluding cost of reinforcement,binding wires and labour charges for bending,binding and tying the grills. | 550 | Cum | 6,388.18 | ₹35,13,499.98 |
| 1.05 | Rigid and smooth centering and shuttering for RCC works including false work using Non sal wood scantling, planks, sal bullah etc. including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC and cost of all labour, T&P required for the work comp. in all respect
in Base Footing | 160 | Sqm | 247.83 | ₹39,652.01 |
| 1.06 | Rigid and smooth centering and shuttering for RCC works including false work using Non sal wood scantling, planks, sal bullah etc. including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC and cost of all labour, T&P required for the work comp. in all respect
in wall | 1,310 | Sqm | 1,078.25 | ₹14,12,511.64 |
| 1.07 | Supplying HYSD bars of appd. Quality size and grade and cutting, bending, binding and tying the grills in proper position as required for the RCC work including cost,head load, conveyance of HYSD bars (Fe500) and binding wires of 18 to 20 gauge and cost of labour, T&P required to comp. in all respect as directed by the EIC. | 550 | Qntl | 8,855.63 | ₹48,70,596.61 |
| 1.08 | Priming one coat with wall cement primer to wall with approved Primer including cost, conveyance of all materials, cost of labour & T&P required for the work etc. Complete as directed by EIC. | 6,669.88 | Sqm | 83 | ₹5,53,590.17 |
| 1.09 | Finishing walls with water proofing cement paint of approved shade on new work two coat to give an even shade inculding cost of paint, primer, putty, scaffolding, T&P, cost, conveyance, cost of all materials and cost of all labour required for the work etc. complete as per the direction of EIC. | 1,362.73 | Sqm | 46.9 | ₹63,912.04 |
stage.html
html • 0.03 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
BOQ_604087.xls
BOQ • 0.36 MB
SBD_2.pdf
Tender Documents • 3.81 MB
CORRIGENDUM_1.pdf
PDF • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .