| Sl No | Description | Qty | Unit | A SUNDARAMURTHY CONTRACTOR L2 | Ravichandran G L1 |
|---|---|---|---|---|---|
| 1.00CONSTRUCTION OF RCC ROOF BUS SHELTER & TOILET AT VADAPATHIMANGALAM PANCHAYAT. | |||||
| 2.00 | Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete | 44.15 | Cum | 263.78 ₹11,645.89 | 263.78 ₹11,645.89 |
| 3.00 | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. | 7.38 | Cum | 2,615.97 ₹19,305.86 | 2,615.97 ₹19,305.86 |
| 4.00 | Supplying and Filling foundation and basement with fillin Cartted Earth not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. | 14.4 | Cum | 45.85 ₹660.24 | 45.85 ₹660.24 |
| 5.00 | Cement concrete 1:4:8 mix using 40mm HBG Metal including cost and conveyance of all materials and all labour chages etc., complete | 7.63 | Cum | 6,488.35 ₹49,506.11 | 6,488.35 ₹49,506.11 |
| 6.00Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete I) Below Basement | |||||
| 7.00 | I)with struting Ground level | 14.4 | sqm | 547.5 ₹7,884 | 547.5 ₹7,884 |
| 8.00 | II)coloumn | 44.16 | sqm | 1,095 ₹48,355.20 | 1,095 ₹48,355.20 |
| 9.00 | III)Plain surfaces | 85.29 | sqm | 1,095 ₹93,392.55 | 1,095 ₹93,392.55 |
| 10.00Cement concrete M20 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. I) upto Basement | |||||
Tender Value
₹13 L
EMD Value
₹13,000
Closing Date
27 Feb 2026, 3:00 pmClosed
BLOCK DEVELPOMENT OFFICER (B.PT)
BLOCK DEVELOPMENT OFFICE, MANNARGUDI
MPLAD 25 -26 CONSTRUCTION OF BUS SHELTER AND TOILET IN VADAPATHIMANGALAM PANCHAYAT
2026_RDTN_662512_1
3497/2025/A8
Open Tender
Civil Works
Mannargudi
MPLAD 25 -26 CONSTRUCTION OF BUS SHELTER AND TOILET IN VADAPATHIMANGALAM PANCHAYAT
3 documents required · 3 mandatory
₹0
₹13,000
4 Mar 2026
20 Feb 2026
27 Feb 2026
20 Feb 2026
27 Feb 2026
20 Feb 2026
CONSTRUCTION OF RCC ROOF BUS SHELTER & TOILET AT VADAPATHIMANGALAM PANCHAYAT.
Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Supplying and Filling foundation and basement with fillin Cartted Earth not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1:4:8 mix using 40mm HBG Metal including cost and conveyance of all materials and all labour chages etc., complete
Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete I) Below Basement
I)with struting Ground level
II)coloumn
III)Plain surfaces
Cement concrete M20 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. I) upto Basement
I)Belowe Basement
II)Above Basement
Supplying and fabrication of steel including cost and conveyance of steel to site and cost of binding wire including all labour charges for cutting,bending, tying and forming grills for all works
Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete. A) Below Basement
A) Belowe Basement
B) Above Basement
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and th.en sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc.,complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty should be got approved by the Executive Engineer before use on work. (Based on SoR 2024-25)
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Providing Granite slab
Antikids tiles flooring laying with new ceramic tiles of size 300x300x6 mm laid in C M 1:3 inculding cost of white cement and labour charges etc
Dadooing with glazed tiles of size 150x150x6mm including cost and conveyance of all materials to site and all labour charges etc complete
Finishing the top of the roof with one course of Machine Pressed Tiles of size 23x23x2 cm of approved quality laid in CEMENT MORTAR 1:3(One cement and three sand) 12 mm thick mixed with water proofing compound conforming to ISS by 2% weight of cement used and the joint pointed neatly to full depth of tiles with the same water proofing compound mixed with cement mortar,red oxide, etc., complete complying with standard specification
Wiring with 2x1.5(22/0.3) sqmm PVC unsheathed SC Copper conductor of 1100 V grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories and with T.W. switch box with 5amps F.T. switch in flush with wall covered with hylum sheet of 3mm thick with painting of suitable colour with continuous earth wireconnection of 14 SWG wire for cocealed Light point/fan point (5 points per coil) [ SD No. 24 ]
Service wire SD 64
Supply and fixing ofPlug Point
Supplying and fixing of CFL bulb
Supplying and fixing of Bulket Fitting
Supplying and fixing of Ceiling FAN
Provision For Toilet Building
Drilling pile hole of size 230mm dia with hand bore set inculding cost and coveyance of all materials to site and all other charges etc, complete
Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1:4:8 mix using 40mm HBG Metal including cost and conveyance of all materials and all labour chages etc., complete
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete. A) Below Basement
A) Belowe Basement
B) Above Basement
Reinforced cement concrete 1:11/2:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,
A) Belowe Basement
B) Above Basement
Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc.
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
A) Belowe Basement
B) Above Basement
Ceramic tiles flooring laying with new ceramic tiles of size 300x300x6 mm laid in C M 1:3 inculding cost of white cement and labour charges etc
Dadooing with glazed tiles of size 150x150x6mm including cost and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Plastering with cement mortar 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Fabrication and supply of mild steel Door of any size with single leaf outer frame made of 35x35x5 mm equal M.S angle and shutter frame made of 25x25x5 mm M.S angle for horizontal and vertical member with stiffener and fully covered with 18 G plate etc complete.
Toilet Door
Jolly
Distembering two coats oil bound distember over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete ( Inner wall )
Painting two coats with approved Plastic Emulsion paint over one coat of Primaring coat over cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. (S.I No. 359 B)
Painting two coat of new iron works such as steel Doors,windows,ventilators, etc., with best approved first quality of synthetic enamel paint of approved colour over the existing priming coats,ete.
Supply and fixing of Water closet with "P" trap, etc. complete.
Provision for HDPE TANK 500LIT
Painting and lettering of Name board
Provision for Photo charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
technical_795350.pdf
techsummary_795350.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
VADAPATHIMANGALAMBUSPRICE.pdf
Tender Documents • 1.42 MB
VADAPATHIMANGALAMBUSTECH.pdf
Additional Documents • 1.14 MB
BOQ_795350.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid