Loading…
Loading…
Tender Value
₹9.7 L
EMD Value
₹97,174
Closing Date
9 Jul 2026, 3:00 pmDue tomorrow
C.E.3
Zone 3
Imp. Of C.C. Nali from Bagahi Bhatta in internal lane in Ward 36 Zone 3
2026_NNKAN_1160990_2
75/A.A.3/26-27
Open Tender
Civil Works
Imp. Of C.C. Nali from Bagahi Bhatta in internal l
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹97,174
3 Jul 2026
3 Jul 2026
9 Jul 2026
3 Jul 2026
9 Jul 2026
3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | dismentalling of B.O.E soling/interlocking including stacking of servicable direction etc all comp | 1 | sqm | 11 | ₹10.99 |
| 2 | Class-150 brick Work in 1:4 cement c.sand in foundation and pilnth etc all comp. | - | CUM | 6,600 | - |
| 3 | Plaster and painting 15 mm cement plaster on rough side of single or half brick wall finished With a floating coat of neat cemnt of mix etc all comp | - | sqm | 255 | - |
| 4 | R.C.C. Work 1.4.3 providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering etc all comp | - | CUM | 6,750 | - |
| 5 | Construction of granual sub base (GSB) with well graded materails in uniform layer ec all comp | 1 | CUM | 3,671 | ₹3,667.33 |
| 6 | R.C.C. Work providing and laying in position Ready Mixed concrete manufactured in fully automatic batching plant and transported etc all comp | 1 | CUM | 8,538.54 | ₹8,530 |
| 7 | R.C.C. Work With cement approved coarse sand and 20 mm approved stone ballast in proportion for raft foundation With 1:1.5:3 etc all comp | - | CUM | 8,600 | - |
| 8 | Mild steel & iron Work in plain work such as hevey size as fabrication of M.S or iron in plain work such as hevey size etc all comp | - | Qtl | 7,200 | - |
| 9 | Supply & Fixing of sign board With pedastal including all labour work supply and fixing of sign board With pedastal including etc all comp | - | Nos | 3,840 | - |
| 10 | Disposal of earth up to 3km including loading & unloading etc all comp | - | Cum | 116.96 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.07 MB
BOQ_2187136.xls
BOQ • 0.22 MB
Download all tender documents and submit your bid