| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹64.3 LAccepted-Finance 17 1 ABHOY HALDER LANE KOLKATA | KOLKATA | L1 | Accepted-Finance L1 | |
| 2 | L2₹65.1 L+₹76,466.95 (1.19%)Rejected-Finance 1 6 FAKIR CHAKRABORTY LANE | L2 | Rejected-Finance Higher than L1 | |
| 3 | L3₹66.0 L+₹1.6 L (2.55%)Rejected-Finance 6 KRIPANATH DUTTA ROAD KOLKATA 700 002 | KOLKATA | KOLKATA | WEST BENGAL | 700002 | L3 | Rejected-Finance Higher than L1 | |
| 4 | L4₹66.7 L+₹2.4 L (3.70%)Rejected-Finance ALAMPUR NODAKHALI | L4 | Rejected-Finance Higher than L1 |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
13 Nov 2025, 9:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer ,SMD , PHED
Chetla , Kolkata-700027
Water supply arrangement at LOT No 8 and lighting arrangement for GS Mela2026
2025_PHED_921910_1
WBPHE/EE/SMD/NIeT-31 of 2025-26
Open Tender
MISC ELECTRICAL WORKS
Item Rate
60 days
Kakdwip, South 24 PGS
Please refer Tender documents.
6 documents required · 6 mandatory
₹1.3 L
5 Dec 2025
24 Oct 2025
15 Nov 2025
24 Oct 2025
13 Nov 2025
24 Oct 2025
Amount
All Quoted Rates are inclusive of GST @ 18% + CESS @ 1%
Dismantling the hand pump with lifting of the 1.5” dia including drop pipe and other materials as per direction.
Washing the tube well by bucket wash system with the help of 1.5” dia. G.I. Pipe, check valve and other materials on hire basis incl. lowering the tube well by engaging – skilled and unskilled labour with supply of chemicals and other necessary materials required to complete the work as per direction of E.I.C. [a] 4” x 2” tubewell-4nos [b]12” x 6” tube well -2nos [Developing the above tube well by engine driven pump set and running maintenance of engine from 24.12.2025 to 31.12.2025.]
Carrying charges of following capacity pump set with diesel engine from Akshyanagar store to lot no.8 incl. pipes & specials & back the same to store after completion of mela including loading & unloading of 5 HP diesel engine with pump, 5 HP submersible pump set with column pipe panel board etc.
Complete dismantling of following pump & diesel engine for repairing overhauling washing and cleaning with changing of damage spares parts as per sample including reassembling the same with new spares complete.
5 HP diesel engine with pump
5 Hp submersible pump & motor
Painting the following pump & diesel engine with column pipe, pump, valve, base trolley by approved paint of desired shade and brand
5 HP diesel engine with pump
5 Hp submersible pumps with motor & column pipe.
1 HP Cora submersible pump with motor & column pipe
Installation of submersible pump motor with column pipes of length 60 ft. including all mechanical & electrical connection and outdoor type derrick arrangement complete.
Installation of Cora submersible pumps with column pipe length 60 ft. incl. all mechanical and electrical connection and outdoor type derrick arrangement complete.
Installation of 5 HP engine & pump with 1½” dia. delivery line with proper foundation as per direction of E.I.C.
Making delivery connection with fitting fixing of sluice valve, reflux valve etc. incl. supply of nuts & bolts, rubber insertion etc. all complete.
Installation of panel board on temporary basis with supply of 32/63 amps. TPN main switch & 63 amps changeover switch on hire basis incl. all electrical connection complete as per direction.
Supply & filling of mobile oil Servo Super of approved make in the engine including drainage of old mobile.
Making proper disinfections arrangement of delivery line by injecting bleaching solution including supply of required size poly, bucket, jar, stop cock & mug etc. as per direction of the E.I.C.
Running & maintenance of submersible pump set during mela period by engaging skilled operating staff round the clock with supply of necessary sundries from 02.01.2026 to 17.01.2026 = 16 days x 20 hrs.
Supplying & installation of diesel driven pump set on hire basis for cleaning the ditch water from 06.01.2026 to 17.01.2026 = 12 days x 2 sets.
Running & maintenance of KSB make cora submersible pump set during mela period by engaging skilled operating staff in 3 shifts with supply of necessary sundries from 04.01.2026 to 17.01.2026 = 14 days x 20 hrs x 2 (near Kashinagar).
Running & maintenance of new submersible pump sets during mela period by engaging skilled operating staff in 3 shifts with supply of necessary sundries from 04.01.2026 to 17.01.2026 = 14 days x 20 hrs x 1nos ( near Bus Stand).
Running & maintenance of new submersible pump sets during mela period by engaging skilled operating staff in 3 shifts with supply of necessary sundries from 04.01.2026 to 17.01.2026 = 14 days x 20 hrs x 1nos ( near Nutan Rasta).
Withdrawing of Cora submersible pump set along with column pipe and other specials after disconnection of electrical power incl. derrick arrangement as per direction of the E.I.C.
Taking out the diesel engine driven pump set incl. dismantling the suction & delivery line after completion of mela as per direction of E.I.C.
Withdrawing of submersible pump set with column pipe and other materials after disconnection or power line after completion of mela as per direction of E.I.C. incl. outdoor type derrick arrangement.
Supply & delivery site of bleaching powder with 33% chlorine in 25 Kgs. Poly bag (Sriram/DCM)
Guarding arrangement of whole installation of above for the entire period round the clock.
Supply on hire basis 4.88 mtr. long and 100 mm.. dia (av) bottom and 50mm.dia. (av) top salbollah post and erecting the same at bus stand and other different places as per direction of E.I.C. (av. distance between two poles is 20 mtrs.)
Supply on hire basis 4.88 mtrs. long x 100mm dia. (av) bamboo post and erecting the same as different places as per direction of E.I.C.
Supply on hire basis of 9mtr long MS pole and erecting by excavation of earth in any kind of soil at different places of Lot No.8 as per direction of the EIC for the period from 03-01-2026 to 17-01-2026
Carrying of 2 Nos. departmental power distribution panel board, cable from store to different controlling station and return to store including storage after mela as per direction of EIC.
Installation of power distribution panel boards for power supply from WBSEDCL in different substation including electrical inter connection from departmental Panel Board to WBSEDCL Panel Board for LT. Distribution line before 03.01.2026 including proper earthing arrangement complete as per direction of EIC.
Drawing the power line from generating station to controlling switch by necessary required length of departmental supplied PVC insulated aluminum wire including interconnection with earthing arrangement as per IE Rules i.e. generator to elec. accessories of the temporary Controlling station.
Drawing halogen light point from different distribution line to the different places as per direction E.I.C. with supply of 1000 W. lamp, holder, fixture etc. to complete the work from 02.01.2026 to 17.01.2026 = 16 days x 15 pts
Supply and delivery at site 25 sq.mm 660/1200volt grade single core PVC insulated aluminum cable on hire basis
Drawing street light/ flood light point on hire basis from different distribution line on PCC pole/ MS pole along with metal road & different places for fitting of sodium vapour fixture including lamp and other accessories required for the work complete with guarding arrangement.
400 watt twin 01.01.2026 to 17.01.2026 = 17 days x 10 pts
400 watt single 01.01.2026 to 17.01.2026 = 17 days x 10 pts
250 watt 01.01.2026 to 02.01.2026 = 2 days x 90 pts
250 watt 03.01.2026 to 17.01.2026 = 16 days x 125 pts
Drawing the ceiling light points from different line to different hogla shed as directed with supply on hire basis 40 W bulb holders, wire etc and other necessary materials as required to complete the work from 06.01.2026 to 17.01.2026 = 12 days x 75 pts.
Temporary installation of panel board supplied by the department on wooden platform incl. supply of Salbollah post & wooden plank on hire basis as per direction of E.I.C. with construction of hogla shed as per deptt. Specification.
Drawing tube light points from different distribution & feeder line on salbollah post at different places with supplying on hire basis 40 W tube light choke starter & all other necessary materials required to complete the work from 06.01.2026 to 17.01.2026 = 12 days x 40 pts.
Temporary installation of controlling station with fitting fixing of 63/32 amp TPN & 16 amps SPN main switch as and when reqd. as per direction for E.I.C. incl. supply of salbollah post and wooden plank on hire basis with all required materials to complete the works on hire basis on or before 02.01.2026.
Carrying charges of panel board, switch, fixture etc. from Akshyanagar store to working site & back the same to store after completion of mela including loading and Unloading safely.
Guarding arrangement of whole installation of the above items for the entire period round the clock.
Taking out the whole installation after completion of mela as directed [all damaged materials will have to be replaced by the agency at their own cost and labour]
HIRING & RUNNING MAINTENANCE OF DIESEL ENGINE DRIVEN GEN SET Making and construction on hogla shed on temporary basis of size 14ft x 12ft including supply of hogla, bamboo and necessary materials as per direction.
Temporary installation of LT panel board on hire basis incl. outgoing feeder and incoming feeder for receiving generator line.
[ILLUMINATION ARRANGEMENT AT TEMPORARY BUS STAND] Carrying charges of 8mtr length PCC pole from Lot no.8 to Kamarer hut temporary bus stand[Kashinagar] including loading unloading complete of 8 nos pole and back to store after mela
Erection of the above pole at different places of temporary bus stand area by excavation of earth of depth 2 mtrs below ground level and filling with jhama bricks and soil as per requirement to complete the job including supply of jhama bricks
Drawing of overhead line in vertical configuration of medium pressure line by ACSR including supplying binding wire from jumper and insulator and safety device etc in different places as per ISS and IE rules also as per direction[ACSR conductor will be supplied departmentally]
Supply and drawing of continuous earth wire from end pole to receive pole by supplying 12 SWG GI wire with all necessary materials and earth clamp complete as per direction
Supply and delivery at site D type iron clamp set[galvanized] including necessary GI nuts, bolts, washer size 3.5” x 5” dia including loading, unloading complete as per direction
Supply of porcelain shackle insulator[75mm x 56mm] including loading, unloading complete as per direction
Supply at site of suitable pole clamp for existing PCC pole with iron angle fitting complete for 3Ph 4 wire overhead line as per ISS and IE rules complete as per direction [a] Size of Angle= 50mm x 50mm x 6mm thick [b]Size of Shackle= 6mm x 25mm
Supply at site the special type arm bracket made with 40mm dia GI pipe x 2 mtr long for street light fixture 250 watt SV lamp including MS coller weld at neck of the bracket making 600 bend at the top portion including painting red oxide paints as per direction
Supply at site special type MS clamp as per sample by MS patty as required length including necessary nuts, bolts, washer with painting red lead paint of approved make
Fitting fixing of D type iron clamp and pole clamp in the PCC pole after completion and erection as per IE rules
Making earthing arrangement by supplying 5/8” dia earth spike of 2 mtr long with galvanize bolts nuts sand washer etc including supplying and fitting fixing 8 nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole
Making stay arrangement by 7/8 SWG GI standard stay including supply of necessary material i,e, stone chips, cement, sand, stay rod anchor plate to complete the job as per IE rules and ISS rules
Drawing of the street light points of new bus stand from distribution line to PCC pole as direction with supply of 250watt street light fixture with SON lamp and control gear on hire basis with all other necessary materials required to complete the work for the period from 05.01.2026 to 16.01.2026 = 12 days x 10pts
Painting with decorative cement base paint of approved quality after scraping the above pole surface thoroughly in different area as per direction of the EIC
Drawing ceiling light points from distribution line to different hogla shed for Police camp as per direction with supply on hire basis 60 watt bulb, holder and other materials required to complete the work from 04-01-2026 to 16-01-2026 = 13days x 50pts
Supply on hire basis 4.88mtr long and 0.10 mtr dia [av] bottom and 0.50mtr dia top salbollah post and erecting the same as per direction
Drawing tube light points on the salbollah post PCC pole with supply on hire basis 40 watt tube light choke, starter and other materials to complete the work from 08-01-2026 to 15-01-2026 = 8 days x 20points
Drawing of 400 watt twin type flood light fixture and SON-T lamp with control gear complete from 05-01-2026 to 16-01-2026 = 12 days x 11 points.
Temporary installation of controlling station with 16amps TPN main switch on wooden board and sallballh on hire basis including electrical connection complete
Dismantling of ACSR conductor and earth wire from end pole after disconnection all joints, binding etc from PCC pole as per direction after complete of mela
Withdrawing the 8mtr length PCC pole by excavation of earth and lifting of poles carefully and stacking at safety places
Guarding of the whole installation by engaging labour as per direction of EIC in 3 shifts from 04.01.2026 to 16.01.2026
Taking out the whole installation of the above items after mela as per direction of EIC all damaged materials have to be replaced by the agencies at their own cost.
ILLUMINATION ARRANGEMENT FROM KAKDWIP MAIN ROAD TO WOODEN BRIDGE NEAR PANCHAYET Drawing of halogen light point on WBSEDCL PCC pole as per direction with supply on hire basis 1200 watt halogen lamp, holder etc all other materials required to complete the work from:
06-01-2026 to 16-01-2026 = 11 days x 15pts [for Kakdwip Road to Wooden Pole]
06-01-2026 to 16-01-2026 = 11 days x 5pts [for Kakdwip New Constructed bridge]
Supply and drawing of LT distribution line on hire basis with16 sq. mm. 1100 volt grade single core cable from overhead line to fitting with 15amp tumbler switch and connection complete and maintenance for 9 days at different sites:
[a] for Kakdwip Road to Wooden Pole
[b] for Newly constructed bridge
[ILLUMINATION ARRANGEMENT FROM A.T. STEAMER GHAT INCLUDING OTHER PLACES] Supply on hire basis 4.88 mtr. long and 0.12 mtr. dia (av) bamboo post & erecting the same at different places as per direction of E.I.C. (average distance from pole to pole is 25 mtrs.)
Drawing of tube light point from generating stn. as directed with supply on hire basis commercial fixture choke starter, holder, 40 watt tube light, wire etc. and other necy. materials, reqd. for the work from 04.01.2026 to 17.01.2026 = 14 days x 100 pts.
Construction of four leg bamboo tower 9 Mtr height for fitting of different fixture and luminaries by hiring bamboos & sal bollah of required length, erecting the samewith cross supports binding with ropes as per direction (for temporary Bus stand)
Drawing of street light point from generating station as directed with supply on hire basis 60 W bulb, wire etc. & other necessary materials required for the work from 08.01.2026 to 22.01.2026 = 15 days x 30 pts.
Drawing of halogen light point on bamboo post from generating station as directed with supply on hire basis 1000 W lamp, holder, wire shed etc. all other materials required to complete the work from 02.01.2026 to 17.01.2026= 16 days x 15 pts.
Drawing of halogen light points on bamboo post from generating station as directed with supply on hire basis 1000 W bulb, holder, wire shed etc. and all other materials reqd. to complete the work from 18.01.2026 to 22.01.2026 = 5 days x 4 pts.
Drawing of ceiling light point from different lines to different places as per direction of E.I.C. incl. supply on hire basis 40 W bulb, holder, wire etc. all other materials required to complete the work from 07.01.2026 to 17.01.2026 = 11 days x 50 pts.
Electrical connection for control station incl. supply on hire basis necy. Main switch change over switch where required connection as per direction of EIC.
Carrying charges of L.T. panel board and other materials from Akshyanagar store to Kakdwip and back to store after completion of mela incl. loading and unloading complete.
GROUP-C ILLUMINATION ARRANGEMENT FROM PANCHAYET OFFICE WOODEN BRIDGE TO NARASHIMA ROAD [EXTENDED PORTION] Drawing of 250 watt steel light fixture complete set with 250 watt lamp fixing on WBSEDCL pole temporarily on hire basis and connection complete from 06-01-2026 to 16-01-2026 = 11 days x 75 pts
GROUP—D ILLUMINATION ARRANGEMENT FROM KAKDWIP RAILWAY STATION TO KAKDWIP ROAD Drawing of street light point from salbollah post and P.C.C. pole from Kakdwip Railway Station to Kakdwip Road as per direction with supply on hire basis 400 watt. Sodium vapour fixture lamp ballast and other materials reqd. to complete the work from 06.01.2026 to 17.01.2026 = 12 days x 15 pts.
Drawing of flood light point at Kakdwip station on P.C.C. pole and street tubular pole from different feeder line as directed with fitting fixing of 400 watt twin type SON-T flood light fixture and lamp control gear bulb etc. as reqd. to complete the work on hire basis for the period from 06.01.2026 to 17.01.2026 = 12 days x 12 pts.
Drawing ceiling light points from different distribution line to different hogla shed as per direction of E.I.C. with supply on hire basis 60 watt bulb, holder and other materials reqd. to complete the work from 08.01.2026 to 17.01.2026 = 12 days x 80 pts.
Supply on hire basis of 9 mtrs. long steel pole and erecting by excavation of earth in any kind of soil at different places of new bus stand and different area as per direction of E.I.C. for the period from 08.01.2026 to 17.01.2026
Drawing of L.T. feeder and distribution line from medium pressure voltage by 3 phase 4 wire system as per I.E. rules and ISS by 16 sq. mm. PVC single core cable on hire basis salbollah post incl. supply of necy. cable as per direction of E.I.C.
Temporary installation of controlling station with fitting fixing of different sizes main switch on wooden plank salbollah on hire basis incl. electrical connection complete as per direction of E.I.C.
Making earthing arrangement by supplying 5/8” dia earth spike of 2 mtr long with galvanized bolts nuts and washer etc including supplying and fitting fixing 8 nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole
Making and const. of hogla shed as temporary basis size 8’ x 12’ including supply of hogla, bamboo, and necessary materials as per direction.
Guarding of the whole installation by engaging experience labour as per direction of E.I.C. in three shifts from 06.01.2026 to 17.01.2026
Taking out the whole installation of the above items after mela as per direction of E.I.C. all damages materials have to be replaced by the agency at their own cost.
Supply on hire basis 4.88mtr long and 100 mm. dia. (av.) salballah post and erecting the same at different places as per direction. Average distance from pole to pole is 20mtr
Drawing of T.L. point from generating station as directed with supply on hire basis of TL fixture, choke, starter, holder 40watt tube, wire etc and other necessary materials required for the work including guarding arrangement from 08.01.2026 to 17.01.2026= 10 days x 50pts
Drawing of street light point from generating station as directed with supply on hire basis 60watt bulb, wire etc and other necessary materials required for the work including guarding arrangement from 08-01-2026 to 17.01.2026 = 10 days x 25pts
Drawing of halogen light point on salbollah post from generating station as directed with supply on hire basis 1000watt lamp, holder, wire shed etc and all other materials required to complete the work from 06.01.2026 to 17.01.2026 = 12 days x 12pts
Electric connection for different power wiring system including supply on hire basis necessary main switches, wiring and all other connection as per direction of EIC
Guarding of the hole installation by engaging experienced labours per direction of EIC in 3 shifts from 06.01.2026 to 17.01.2026
Taking out the whole installation of the above items after mela as per direction of EIC. All damaged materials have to be replaced by the agencies at their own cost and labour
Carrying charges of LT panel board and other materials from Kakdwip to Kamarer Hut and back to store after completion of mela including loading unloading compete
Drawing street light point from different distribution line on WBSEDCL pole at river canal site as directed with 250watt SV fixture including lamp and other accessories required for the work compete on hire basis from 08.01.2026 to 17.01.2026 = 10 days x 85 pts
Fitting fixing of special type arm bracket on PCC pole by supplying materials as directed
GROUP—B ILLUMINATION ARRANGEMENT OF EXTENDED ROAD NEAR B.P.ROAD AND WOODEN BRIDGE AT KAKDWIP AREA Supply on hire basis of 250watt SV fixture including lamp and other accessories required for the work and drawing street light point from different distribution line of WBSEDCL pole for extended road side complete as directed from 04-01-2026 to 17-01-2026 = 14 days x 50 pts
Supply on hire basis 400 watt sodium flood light fixture with 1 no control gear box and SV lamp etc and drawing of flood light points to complete the work as directed from 04-01-2026 to 17-0-2026 =14 days x 20 pts
Supply at site the special type arm bracket made with 40 mm dia GI pipe x 2 mtrs long for street light 250 watt SV lamp fixture including making 600 bend at the top portion including painting by red oxide paint as per direction.
Supply delivery and fixing of suitable size pole clamp as per direction of EIC
Fitting fixing of special type arm bracket with pole clamp on the PCC pole as directed
Drawing of flood light points for Newly Approach Road and other place as directed on supply on hire basis 400 watt sodium flood light fixture-1 No, control gear box and SV lamp etc and complete the work from 04-01-2026 to 17-01-2026= 14 days x 35pts.
Drawing of the flood light point for main entrance of the jetty fixing on MS joint as per direction of EIC. Supply on hire basis 400 watt twin type flood light fixture and 2 nos SON lamp with control gear box complete from 02-01-2026 to 17-01-2026 =16 days x 25 pts.
Drawing of 250 watt street light fixture in different place of Newly Approach Road on hire basis of 250 watt S.V fixture ballast,250 watt S.V. lamp from 02-01-2026 to 17-01-2026= 16 days x 150 pts.
Supply & drawing of distribution line for medium pressure voltage, 3Phase 4 wire system by 25sq.mm single core PVC insulated wire on hire basis including dismantling the same after completion the work.
Supply on hire basis of 9 mtr. Long MS pole and erection and fitting fixing on the jetty bridge as per direction of EIC for the period from 04-01-2026 to 17-01-2026
Supply and delivery at site D. type iron clamp set galvanized with necessary GI nuts and washer size 31/2'' x 5'' dia.
Supply and delivery at site of porcelain shackle insulator size 75mm x 88mm.
Fitting fixing of D type iron clamp, porcelain shackles and ole clamp in the MS pole after completion of the erection work.
Making earthing arrangement by supplying 5/8'' dia earth spike of 2 mtr long with galvanized bolts nuts sand washer etc including supplying and fitting fixing 8 nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole.
Guarding charge of the whole installation round the clock as per direction.
Drawing of metal flood light points on hire basis on surrounding area of Jetty No. 1, 2, 3, 4 & 5 of 400 watt metal flood fixture, lamp, control gear etc. reqd. to complete the job from 08-01-2026 to 14-01-2026 = 7 days x 80 pts.
Drawing of 250watt street light fixture in different place of jetty ghat No. 1, 2, 3, 4, 5 & VIP Jetty on hire basis of 250watt S.V. fixture ballast, 250watt S.V. lamp from 09-01-2026 to 14-01-2026 = 6 days x 50 pts.
SCHOOLS, HARBOUR ANCHAL AREA, TEMPORARY TOILETS AND OTHER AREA Supply on hire basis of 9 mtrs. long steel pole and erecting by excavation of earth in any kind of soil at different places of different area as per direction of E.I.C. for the period from 08.01.2026 to 17.01.2026
Drawing street light points from different distribution and feeder lines salbollah posts to different places directed with supply on hire basis 100 watt. bulb, holder bracket and necessary materials required to complete the work from 08-01-2026 to 17-01-2026 = 10 days x 80 pts x 9 Nos. school
Drawing tube light points from different distribution and feeder lines on salbollah post and PCC pole at different places with supplying on hire basis 40 watt tube light, choke, starter and all other necessary materials to complete the work from 08.01.2026 to 17.01.2026 = 10 days x 10 pts x 9 Nos. school
Drawing street light points from different distribution and feeder lines salbollah posts to different places directed with supply on hire basis 100 watt. bulb, holder bracket and necessary materials required to complete the work from 10-01-2026 to 17-01-2026 = 8 days x 250 pts
Drawing of metal flood light points on hire basis for illumination of school compound from different feeder of 400 watt metal flood fixture, lamp, control gear etc. reqd. to complete the job from 08-01-2026 to 17-01-2026 = 10 days x 5 pts x 14 Nos. school
Drawing of metal flood light points on hire basis for illumination of school compound from different feeder of 400 watt metal flood fixture, lamp, control gear etc. reqd. to complete the job from 10-01-2026to 17-01-2026= 8 days x 115 pts
Supply & fitting fixing of 2 PIN 5 amps plug point for mobile chargers & 3 pin 15amps plug point for special purpose on hire basis
Drawing the street light points from different feeder and distribution line to PCC pole to different places as directed with supply on hire basis 250 W sodium fixture lamp ballast and other necessary materials reqd. for the work to complete from 05.01.2026 to 17.01.2026=13days x 9pts
Drawing of LT distribution line from medium pressure voltage by 3 Ph. 4 wire system as per IE rules and ISS rules by PVC single core wire on hire basis on salbollah post & on PCC pole incl. supply of wire installation of binding wire etc. as directed before 04.01.2026
Supply, delivery and fitting fixing of LT spacer for 4 wire vertical configuration line as per direction of EIC.
Supply of hire basis 4.88 mtr long and 0.10 mtr. dia (Av.) bottom and 50 mm. dia. top salbollah post and erecting the same at Bus Stand and other different places as per direction of E.I.C. (av. distance between the two poles is 20 mtrs.)
Drawing of light point of 400 watt twin type flood light fixture and son lamp with control gear complete on hire basis from 04.01.2026 to 8.01.2026 = 5 days x 6 pts
Drawing the street light points from different feeder and distribution line to PCC pole to different places as directed with supply on hire basis 250 W sodium fixture lamp ballast and other necessary materials reqd. for the work to complete from 09.01.2026 to 17.01.2026 =9 days x 4 pts
Providing power supply arrangement of Hanger, VIP Tents, etc. and other places --- Carrying of dept supplied 3.5 core 50 sq.mm 1550 mtr cable from Sagar store to Kachuberia site & return back after completion of mela.
Laying of the departmental supplied cable in trench (at least 230 mm below ground including the same and mending good damages.
Repairing of LED signage boards by supplying of LED light as per existing sample up to the requirement including connection of power circuit board with LED lamp, wires soldering and necessary jointing materials & testing complete up to the EIC for Jetty Nos. bus stand etc. a. Bus stand – 2 Nos. b. Jetty No. 1,3,4 & 5 – 6 Nos. c. LCT Jetty – 1 No. d. PHE Dte. – 1 No.
Repairing LED signage boards of polycarbonate sheet by supplying LED light as per requirement including connection of power circuit board with LED lamp, wires, soldering & necessary jointing materials & testing all complete for displaying the Jetty nos. bus Stand etc. as per direction of EIC. 1. Jetty No. 1 with logo – 1 Set. 2. Jetty No. 2 with logo – 1 Set. 3.Jetty No. 3 with logo – 1 Set. 4. Jetty No. 4 with logo – 1 Set. 5. Jetty No. 5 with logo – 1 Set. 6. Jetty No. 1 without logo – 1 Set. 7. Jetty No. 2 without logo – 1 Set. 8. Jetty No. 3 without logo – 1 Set. 9. Jetty No. 4 without logo – 1 Set. 10. Jetty No. 5 without logo – 1 Set. 11.Only 1 with logo – 1 Set. 12. Only 2 with logo – 1 Set. 13. Only 3 with logo – 1 Set. 14. Only 4 with logo – 1 Set. 15. Only 5 with logo – 1 Set. 16. Bus Stand – 3 Sets. 17. LCT Jetty – 1 Set. 18. PHE Dte. – 10 Sets.
Carrying of the above LED from Ahshaynagar store to Kolkata for repairing on hired vehicle including loading and unloading complete and carrying back the same after repairing at LOT No. 8
Repairing existing glow sign board by changing of copper ballast, Tube light, starter with rewiring complete and changing Aluminium channel etc. to complete the work as per direction.
Hiring of Laser and sharfy light for Jetty, Lost & Found and information tower Supply, delivery and fitting fixing of the following at site including all electrical connection compete and running maintenance of the same during mela period (from 10-01-2026 to 17-01-2026) including dismantling the same after mela
Supply on hire basis and fitting fixing of 5R 200 / 300W Moving head Beam Light (Sharfy Light) – 7 Nos as per following specification:- a. Input voltage – AC -90-240V 50/60 Hz b. Power consumption- 300W c. Display- LED red / blue dot matrix display or LCD display . d. Control Protocol- DMX 512 e. Channel- 16CH f. Lens- 3 in 1 high precision optical lens g. Horizontal Scanning-540º (160 bit precision scanning) electron error correction. h. Vertical Scanning-270º (16 bit precision scanning) electron error correction. i. Colour Wheel- 14 colour with bidirectional function j. Lamp connection- 3 pin single line input and out put the power input
DMX splitter - 1 No. as per following Specification: Voltage AC-110 / 120V, 60 Hz, 220 / 230 / 240 V 50 Hz. DMX signal isolated electrically, compatible to both 3 pin and 5 pin connectors LED indicators display output data for each channel independently.
1200 W MOOVING Head (Laser) - 7 Nos. as per following specification: a. 2 colour wheel, 7 main colour 7 mixed colour, bi-direction high speed rolling with rainbow effect both sides. b. Gobo 1 has 4 types of fine glass gobas rotating 360º bi-direction with turnable speed against direction. c. LCD liquid crystal display can be switched in Chinese and English display. d. 1-11 times / s ultra high speed strobe effect. e. 0-100% Mechanical Linear dimming can control shading to full open. f. Inside electronics iris with 10-100% linearly adjustable g. 5 rotating Stand Prisms h. 540º Pans with 8 or 16 bit resolution i. 270º tilt with 8 or 16 bit resolution j. Automatic Pan and Tilt repositioning by photoelectric From 10-01-2026 to 17-01-2026=8 days x 7 sets
DMX controlling board pilot – 2000 1 No. as per following specificatiom a. Con Control up to 40 Computer Lights b. Each Lamp maximum number of channel -36 c. Functional channel reel type designs which can simultaneously control 6 channel to moving part can be provided two kinds of control mode relative and absolute in order to obtain the best effect. d. SMPTE Syncronization e. Preset and memory independent time setting. f. 40 computer lights programs running lights procedures a preset and scenes can be connected with PC data transmission. from 10-01-2026 to 17-01-2026
Supply on hire basis of drawing 400 watt metal flood light point Jetty No. 2, 3, 4, 5 of 400 watt metal flood fixture lamp, control gear etc. reqd to complete the job as per direction of EIC. From 01-01-2026 to 18-01-2026 = 18 days x 32 Nos. (Jetty 2, 3, 4,5 x 4 Nos. Light)
Temporary gate structure including decorative lighting arrangement at LOT No.8 Hire and labour charges for temporary gate structure as per desighn and direction of EIC. with salbollah / bamboo post of approved size and runner, cross support, vertical support and covering with different coloured cloth and dismantling the same after completion of the mela.
Making temporary decorative lighting arrangement of gate structure on hire basis by fitting fixing at site decorative boards on salbollah / bamboo gate structures including decorative design LED lighting power with different colour LED lights. The board should have in built power circuit board for operating in 230 volt 50Hz AC supply with controller etc and dismantling after completion of mela. [for harwood point crossing and entrance of Jetty No. 4]
Supply and delivery at site poly carbonate sheet with 2mm thick black poly carbonate sheet with light emitting diode [LED] kamps of different colour as per requirement including power circuit board and connection of LED lamp and soldering complete. size of the board is 1200mm x 900 mm [8ft x 8ft x 1 No.]. subject of board will as per following / As approved by EIC. a) WELCOME – GREEN COLOUR b) LOT NO. 8 – BLUE COLOUR c) PHE DTE. – YELLOW COLOUR
Supply and delivery at site poly carbonate sheet with 2mm thick black poly carbonate sheet with light emitting diode [LED] kamps of different colour as per requirement including power circuit board and connection of LED lamp and soldering complete. size of the board as under as per direction of EIC. a) Kapilmuni mandir Chura logo at middle position with running LED Size – 8’ x 4’ – 32 sq ft. b) Kapilmuni mandir Chura logo at left and right side position with running LED Size – 6’ x 4’ – 24 sq ft. X 2 Nos.=48 sq ft. 32 sq ft + 48 sq ft = 80 sq ft.
Temporary installation of the above LED board in suitable position with proper positioning as per direction including dismantling and storage the same after completion of mela.
Flex signage board for Bus Stand, Taxi Stand and other areas Supply, delivery and storage at site of flex board made off with good quality flex sign front and solvent print of different colour and size letter in Bengali, English and Hindi languages [Subject and design as per EIC]. The board should have outside frame of iron ange/aluminium.a. [Size of board 6’ x 3’ - 250 Nos] [Approval to be taken from the Executive Engineer before placing order]
Fitting fixing of signage board/flex board at different places of LOT No. 8 point i.e. mela ground, bus stand, toilet area including supply of G.I. wire. for completion of the work & dismantling the same after mela and return to PHE store.
Ttemporary gate structure including decorative lighting arrangement at LOT No.8 (near LCT Jetty) Hire and labour charges for temporary gate structure as per desighn and direction of EIC. with salbollah / bamboo post of approved size and runner, cross support, vertical support and covering with different coloured cloth and dismantling the same after completion of the mela.
Making temporary decorative lighting arrangement of gate structure on hire basis by fitting fixing at site decorative boards on salbollah / bamboo gate structures including decorative design LED lighting power with different colour LED lights. The board should have in built power circuit board for operating in 230 volt 50Hz AC supply with controller etc and dismantling after completion of mela. [for LCT Jetty]
Supply and hire basis of Running LED Board with poly carbonate sheet with light emitting diode [LED] kamps of different colour as per requirement including power circuit board and connection of LED lamp and soldering complete. Size of the Running LED Board 4 ft x 1 ft. From 10-01-2026 to 19.01.2026 = 10 days.
Temporary fitting fixing of the Running LED board in suitable position with proper positioning of the decorative type LCT gate (Middle Position) as per direction including dismantling and storage the same after completion of mela.
Making and fabricating of MS Channel frame (8 ft. X 4 ft.) including supply of MS channel, angle, and others structural materials including supply of Nut bolt, washer etc. with channel welding complete set.
Making and fabricating MS clamp for holding the LED board including supply of nut bolt, washer complete.
Temporary installation of the above LED board (LCT Jetty) in suitable position with proper positioning including hanging arrangement by hiring of bamboo as per direction including dismantling ad storage the same after completion of mela.
Drawing of L.T. distribution line from pole to pole with droop loop wire for smoth running operation including supply and hire basis of PVC insulated aluminium wire for suitable size required length as per direction of EIC.
Fitting fixing of the departmentally supplied light fittings of Back site of New Bus Stand area including loop wire connection complete by expert electrician complete the job as per direction of EIC.
Supply of generating set on hire basis and properly installation as per direction of EIC on proper position / foundation as per IE Rules, including proper construction of suitable size hogla shed as temporary basis from 10-01-2026 to 17-01-2026 = 8 days x 4 KW x 3 Nos. station x 1 No. Per station = 96 KW
Running and maintenance of generating set by supplying skilled operating staff, fuel, lubricants, sundries and all other materials reqd. for running of generating set as per direction of EIC. From 10-01-2026 to 17-01-2026 = 8 days x 4 KW x 3 Nos. station x 2 hrs.
Providing on hire basis including supplying, laying and transportation charges for the following cables including dismantling the same after completion of the mela
4 sq.mm 1.1 kv single core PVC instated and sheathed stranded aluminium cable.
6 sq.mm 1.1 kv single core PVC insulated and sheathed standerd aluminium cable
10 sq.mm 1.1 kv single core PVC insulated and sheathed standard aluminium cable.
Supply and delivery of the materials at site on hire basis as per requirement to complete temporary illumination work of permanent gate near Natun Rasta at LOT No. 8 from 05-01-2026 to 18-01-2026 a. Colour flexible type waterproof strip LED lights b. Colour flexible type waterproof casing LED lights. c. Steel tubular pole d. Metal halide lamp and fixture e. Colour changing LED par light. f. SMPS of capacity 10/20 Amp input-230 Volts, 50 Hz output – 12 volt DC for power supply. g. 3 Core 2.25 Sq.mm, 1.1 KV grade copper unarmored cables. h. Single core unarmoured unsheathed 1.5 sq.mm, 1.1KV grade copper cable. i. Spot light.
Temporary installation of all above light fixtures, and accessories in different places of the gate as per direction for beautification of the gate up to the entire satisfaction of the EIC.
Double earthing the whole installation as per I.E rules and IS specification.
Dismantling and removing the LED decorating light sets and all other accessories from different position of gate after completion of the Mela.
Supply and hire basis of design and manufacturing of LED Net with high glossy colour for LED lights for signaling of Vasal/lonch with fitting fixing of working platform’s one side including loop wire connection and main line connection by expert electrician and mechanic complete the job as per direction of EIC. Size of LED Net – 8’x 6’ Different Jetties as follows :- a. Jetty no. 1 – PINK Colour LED Net. b. Jetty no. 2 – BLUE Colour LED Net. c. Jetty no. 3 – GREEN Colour LED Net. d. Jetty no. 4 – YELLOW Colour LED Net. e. Jetty no. 5 – PERPPLE Colour LED Net. From 06-01-2023 To 17-01-2023 = 12 Days
Dismantling and removing the LED Net and all other accessories from different Jetties after completion of the Mela and after disconnection of power line by expert electrician complete the job as per direction of EIC.
Flex signage board for Toilet and other areas Supply, delivery and storage at site of flex board made off with good quality flex sign front and solvent print of different colour and size letter in Bengali, English and Hindi languages [Subject and design as per EIC]. The board should have outside frame of iron ange/aluminium. [Written approval to be taken from the Executive Engineer before placing order]
a. [Size of board 6’ x 3’] - 60 Nos
b. [Size of board 4’ x 3’] - 25 Nos
c. [Size of board 6’ x 4’] - 15 Nos
d. [Size of board 3’ x 3’] - 100 Nos
e. [Size of board 3’ x 2’] - 250 Nos
Fitting fixing of signage board/flex board at different places of LOT No. 8 point i.e. mela ground, bus stand, toilet area including supply of G.I. wire. for completion of the work & dismantling the same after mela and return to PHE store.
Temporary illumination arrangement of ONGC metal road [ from NH to Model School] as additional Bus Parking Carrying charges Different luminaries and cable, fixtures etc from LOT NO 8 to Rice Mill ground and returning back the same after mela.
Supply on hire basis following luminaries with necessary control gear, lamp, ballasts for the period: 08.01.2026 to 17.01.2026 = 10 Days
400 Watt Sodium Vapour fixture - 12 nos
1000 Watt Halogen - 20 nos
Drawing LT distribution line [3-phase 4-wire type] from local mains on hire bsis by 25 sq. mm. single core aluminum wire for illumination of luminaries.
Drawing 60 watt GLS lamp point from nearest LT single Ph distribution line & supply on hire basis lamp, holder etc for temporary toilets. from 10.01.2026 to 17.01.2026 = 08 days x 20 pts
Supply on hire basis 6A plug point for mobile charging purpose on wooden board and making electrical connection. 10.01.2026 to 17.01.2026 = 08 Days x 15 pts
Guarding of the whole installation round the clock as per direction.
Illumination arrangement of Footbal Ground [Lot no 5] as additional Bus Parking Carrying charges Different luminaries and cable, fixtures etc from LOT NO 8 to Rice Mill ground and returning back the same after mela.
Construction of four leg bamboo tower 9 Mtr height for fitting of different fixture and luminaries by hiring bamboos & sal bollah of required length, erecting the samewith cross supports binding with ropes as per direction for the period 08.01.2026 to 17.01.2026
Supply on hire basis 9 Mtr long MS pole erecting the same on different sort of soil and making of necessary earthing as per direction. From 08.01.2026 to 17.01.2026 = 08 Days
Supply on hire basis following luminaries with necessary control gear, lamp, ballasts for the period: 08.01.2026 to 17.01.2026= 10 Days
400 Watt Sodium Vapour fixture - 12 nos
800 Watt Twin - 4 nos
1000 Watt Halogen - 06 nos
Drawing 3 Ph, 415v LT power line from WBSEDCL distribution loop box to temporary controlling station by 35 sq. mm. 3.5 core aluminum armour cable.
Drawing LT distribution line [3-phase 4-wire type] from local mains on hire bsis by 25 sq. mm. single core aluminum wire for illumination of luminaries.
Guarding of the whole installation round the clock as per direction.
Illumination arrangement of Rice Mill Premises [Lot no 5] as additional Bus Parking Carrying charges Different luminaries and cable, fixtures etc from LOT NO 8 to Rice Mill ground and returning back the same after mela.
Construction of four leg bamboo tower 9 Mtr height for fitting of different fixture and luminaries by hiring bamboos & sal bollah of required length, erecting the samewith cross supports binding with ropes as per direction for the period 08.01.26 to 17.01.26
Supply on hire basis 9 Mtr long MS pole erecting the same on different sort of soil and making of necessary earthing as per direction. From 08.01.2026 to 17.01.2026= 08 Days
Supply on hire basis following luminaries with necessary control gear, lamp, ballasts for the period: 08.01.2026 to 17.01.2026 = 10 Days
400 Watt Sodium Vapour fixture - 15 nos
800 Watt Twin - 6 nos
1000 Watt Halogen - 02 nos
Drawing 3 Ph, 415v LT power line from WBSEDCL distribution loop box to temporary controlling station by 35 sq. mm. 3.5 core aluminum armour cable.
Drawing LT distribution line [3-phase 4-wire type] from local mains on hire bsis by 25 sq. mm. single core aluminum wire for illumination of luminaries.
Drawing 60 watt GLS lamp point from nearest LT single Ph distribution line & supply on hire basis lamp, holder etc for temporary toilets. from 10.01.2026 to 17.01.2026 = 08 days x 15 pts
Supply on hire basis 6A plug point for mobile charging purpose on wooden board and making electrical connection. 10.01.2026 to 17.01.2026 = 08 Days x 15 pts
Guarding of the whole installation round the clock as per direction.
[Illumination arrangement of Kakdwip Stadium and adjoining local ground as additional Bus Parking] Carrying charges Different luminaries and cable, fixtures etc from LOT NO 8 to Rice Mill ground and returning back the same after mela.
Construction of four leg bamboo tower 9 Mtr height for fitting of different fixture and luminaries by hiring bamboos & sal bollah of required length, erecting the samewith cross supports binding with ropes as per direction for the period 08.01.2026 to 17.01.2026
Supply on hire basis 9 Mtr long MS pole erecting the same on different sort of soil and making of necessary earthing as per direction. From 08.01.2026 to 17.01.2026 = 08 Days
Supply on hire basis following luminaries with necessary control gear, lamp, ballasts for the period: 08.01.2026 to 17.01.2026 =10 Days
400 Watt Sodium Vapour fixture - 12 nos
800 Watt Twin - 7 nos
1000 Watt Halogen - 12 nos
Drawing 3 Ph, 415v LT power line from WBSEDCL distribution loop box to temporary controlling station by 35 sq. mm. 3.5 core aluminum armour cable.
Drawing LT distribution line [3-phase 4-wire type] from local mains on hire bsis by 25 sq. mm. single core aluminum wire for illumination of luminaries.
Drawing 60 watt GLS lamp point from nearest LT single Ph distribution line & supply on hire basis lamp, holder etc for temporary toilets. from 10.01.2026 to 17.01.2026 = 08 days x 15 pts
Supply on hire basis 6A plug point for mobile charging purpose on wooden board and making electrical connection. 10.01.2026 to 17.01.2026 = 08 Days x 15 pts
Guarding of the whole installation round the clock as per direction.
Carrying charges of 12nos 1 KVA UPS from departmental stoe to work site by hired vehicle including loading unloading complete.
Fitting fixing of the UPS in suitable position as decided and connection complete with the existing system as per direction of EIC.
Carrying back of 12nos 1 KVA UPS from departmental work site to departmental store by hired vehicle including loading unloading complete.
Guaring arrangement of the entire system round the clock for the entire mela perion and dismantling the same after completion of mela with storage to departmental store as per direction. [2 person x 6 sites x 12 days]
Ttemporary gate structure including decorative lighting arrangement at LOT No.8 (near PR6) Hire and labour charges for temporary gate structure as per desighn and direction of EIC. with salbollah / bamboo post of approved size and runner, cross support, vertical support and covering with different coloured cloth and dismantling the same after completion of the mela.
Making temporary decorative lighting arrangement of gate structure on hire basis by fitting fixing at site decorative boards on salbollah / bamboo gate structures including decorative design LED lighting power with different colour LED lights. The board should have in built power circuit board for operating in 230 volt 50Hz AC supply with controller etc and dismantling after completion of mela. [for PR6]
Supply and hire basis of Running LED Board with poly carbonate sheet with light emitting diode [LED] kamps of different colour as per requirement including power circuit board and connection of LED lamp and soldering complete. Size of the Running LED Board 4 ft x 1 ft. From 08-01-2026 to 17.01.2026 = 10 days.
Supply, delivery and storage at site of flex board made off with good quality flex sign front and solvent print of different colour and size letter in Bengali, English and Hindi languages [Subject and design as per EIC]. The board should have outside frame of iron ange/aluminium.
[Size: 10' x 6'] - 10 Nos
[Size: 6' x 3']- 80 Nos
[Size: 10' x 4']- 10 Nos
[Size: 12' x 8']- 15 Nos
Fitting fixing of signage board/flex board at different places of LOT No. 8 point i.e. mela ground, bus stand, toilet area including supply of G.I. wire. for completion of the work.
Illumination arrangement of DR Bandh tower, Gangadharpur as additional bus parking near Kakdwip Carrying charges Different luminaries and cable, fixtures etc from LOT NO 8 to Rice Mill ground and returning back the same after mela.
Supply, delivery and storage at site of flex board made off with good quality flex sign front and solvent print of different colour and size letter in Bengali, English and Hindi languages [Subject and design as per EIC]. The board should have outside frame of iron ange/aluminium.
400 Watt Sodium Vapour fixture - 21 nos
250 Watt Sodium Vapour fixture - 6 nos
1000 Watt Halogen - 2 nos
Providing on hire basis drawing of main wiring by 1.1KV grade 3 ½ core 25 sq mm PVC/A AL cable through wall /floor/ pavement /catenary /system & dismantling after the function
Drawing LT distribution line [3-phase 4-wire type] from local mains on hire bsis by 25 sq. mm. single core aluminum wire for illumination of luminaries.
Drawing 60 watt GLS lamp point from nearest LT single Ph distribution line & supply on hire basis lamp, holder etc for temporary toilets. from 08.01.2026 to 17.01.2026 = 10 days x 15 pts
Supply & fitting fixing of 2 PIN 5 amps plug point for mobile chargers & 3 pin 15amps plug point for special purpose on hire basis
Guarding of the whole installation round the clock as per direction.
Rectification of 5 nos. 12 mtrHigh Mast at Harwood Point, Kakdwip in connection with Ganga Sagar Mela-2026.
Hiring charges of Hydra for upLifting-lowering of middle-top part of high mast and after repairing again lifting from ground with proper positioning of the parts including hiring of all tools-tackles-wire ropes etc all complete as per direction
Technician charges for repairing the lights , proper allignment of middle-top portion replacement of wire ropes as required length to complete the job as per direction.
Technician charges for overhauling of winch system , hoist pulleys , terminal box etc and throughly checkup of head frame , lantern carriage , compensator , winc bracket , winch , winch mounting plate , double drum winch ,trailing cable , rest clamp , terminal box , sleeve pipe , hoist & supply cable pulleys ,gusset plate , foundation nut-bolt etc to complete the job as per direction.
Supply & delivery of the following materials as per sample:-
6 SWG stranded steel rope
6 mm SWG wire "U" clamp
Superior quality Grease
Superior quality lubrricating oil
Technician charges for overhauling of winch system , hoist pulleys , terminal box etc and throughly checkup of head frame , lantern carriage , compensator , winc bracket , winch , winch mounting plate , double drum winch ,trailing cable , rest clamp , terminal box , sleeve pipe , hoist & supply cable pulleys ,gusset plate , foundation nut-bolt etc to complete the job as per direction
Technician charges for repairing the lights , proper allignment of middle-top portion replacement of wire ropes as required length ( above supplied) to complete the job as per direction.
Dismantling of the step motor from the unit, heat vernish and connected with the high mast unit.
Dismantling of the step motor from the unit, rewinding ,heat vernish and connected with the high mast unit.
Cleaning ,Overhauling , greasing , lubricating of the inner spare of the gearbox unit includig dismantling part by part with reassembling the same all complete
Dismentling and Fitting-fixing of the gearbox unit to the high mast with proper allignment all complete
H.K.DAS AND CO. (BID ID -7240157)
B T PROJECTS PRIVATE LIMITED (BID ID -7242157)
S. P. CONSTRUCTION (BID ID -7243646)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .