| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹51.6 CrAccepted-AOC 15A2 1 INTUC 5 SANKARANKOVIL ROAD RAJAPALAYAM TALUK VIRUDHUNAGAR DISTRICT 626 117 | VIRUDHUNAGAR | TAMIL NADU | 626117 | 1 | Accepted-AOC COT approved | |
| 2 | 2₹54.4 Cr+₹1.7 Cr (3.30%)Rejected-Finance 12 PALANI ANDAVAR COLONY ALAGAR KOYIL ROAD MADURAI 625002 | MADURAI | TAMIL NADU | 625002 | 2 | Rejected-Finance L2 Tenderer | |
| 3 | 3₹55.8 Cr+₹3.1 Cr (5.90%)Rejected-Finance 33 GURU ILLAM V T PANDIAN NAGAR 4TH STREET KARIAPATTI 626 106 | VIRUDHUNAGAR | TAMIL NADU | 626106 | 3 | Rejected-Finance L3 Tenderer |
Tender Value
₹51.8 Cr
EMD Value
₹26.1 L
Closing Date
9 Oct 2025, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Thiru.R.K.Ramesh
O/o the Superintending Engineer Highways Projects Circle, Alagarkovil Main road , Madurai - 2
Formation of Outer Ring road to Sivakasi at km 12/5 - 19/2 connecting Viswanatham Venkatachalapuram Road (MD 1048) Sattur Sivakasi Kazhugumalai road (SH 187) and Sivakasi Alangulam road (SH183) Phase II (6.7km)
2025_HWAY_602850_1
TN No 6 2025 26 SDO Dated 18.08.2025
Open Tender
Civil Works - Highways
Percentage
450 days
Sivakasi
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹26.1 L
O/o the Superintending Engineer Highways Projects
16 Dec 2025
11 Sept 2025
9 Oct 2025
11 Sept 2025
9 Oct 2025
11 Sept 2025
11 Sept 2025 - 3 Oct 2025
23 Sept 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land - Heavy Jungle including uprooting wild vegetation, grass, bushes, shurbs, sapling and trees of girth upto 300mm, removable of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 100m including removable and disposal of top organic soil not exceeding 150mm in thickness as per Technical Specification Clause 201. for Main work | 1,92,960 | Sqm | 9.18 | ₹17,71,372.8 |
| 2 | Picking the existing BT surface upto 50mm depth as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and deposting the debris excluding cost of materials including all labour charges for pickig and all other tools and plants employed for the work and including all other incidental charges etc., complete, as per MoRT&H Specification for Junction Improvements | 2,391 | Sqm | 23.36 | ₹55,853.76 |
| 3 | Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders (SS 20B) for Box Cutting (As per PWD SOR Unique Code W-0061) etc., complete as per standard specification for Main Work and Junction Improvements | 4,670 | Cum | 131.89 | ₹6,15,926.3 |
| 4 | Forming embankment using available earth at site with an average lead of 4 km within the site, including laying and spreading in layers of 250mm loose thick each sectioning, watering and compacting by Power roller to achive the required density at 95% Proctor Density at optimum moisture content as determined in occurence with IS 2720 (Part VII) for sub grade including finishing the surface to the required camber and longitudinalo profile including all leads for water and hire & fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., complete as per Clause 301 - 305 of MoRT&H - V revision - Earth filling for main work and Junction Improvements | 97,155 | Cum | 601 | ₹5,83,90,155 |
| 5 | Forming embankment using carted earth having a minimum CBR of 8 with an average lead of 23km, including laying and spreading in layers of 250mm loose thick each sectioning, watering and compacting by Power roller to achive the required density at 97% Proctor Density at optimum moisture content as determined in occurence with IS 2720 (Part VII) for sub grade including finishing the surface to the required camber and longitudinalo profile including all leads for water and hire & fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., complete as per Clause 301 - 305 of MoRT&H - V revision for - Carted Earth for main work and Junction Improvements | 60,971 | Cum | 612 | ₹3,73,14,252 |
| 6 | Providing Granular Sub Base as per clause 401.2.1 viz. sand, mooram, gravel crushed stone, individual or combination thereof which satisfies the physical standards given in clause 401.2.2 and gives the 30 CBR including conveyance of earth all materials and hire and machinery charges of Tools and Plants employed and all other incidental charges as per MoRT&H specification No 401 - Grading V Material for main work and Junction Improvements | 13,234 | Cum | 2,098.92 | ₹2,77,77,107.28 |
| 7 | Providing Granular Sub Base as per clause 401.2.1 viz. sand, mooram, gravel crushed stone, individual or combination thereof which satisfies the physical standards given in clause 401.2.2 and gives the 30 CBR including conveyance of earth all materials and hire and machinery charges of Tools and Plants employed and all other incidental charges as per MORT&H specification No 401 - Grading III Material for main work and Junction Improvements | 9,928 | Cum | 2,371.95 | ₹2,35,48,719.6 |
| 8 | Providing and laying Wet Mix Macadam Base Couse of 250mm thickness in two layers of 125mm each or else as specified on the prepared Sub-Base with graded stone aggregate and granular materials of quality size and grading placed in layers as specified indluding mixing in Base mix plant, spreading in uniform layer in motor grader and compacting with Vibrating Roller of 80 to 100kN static weight and fine dressing for required grade and cross slope as shown on the drawing, equipment safety measures, testing and incidentals necessary to complete the work as per Technical Specification Clause 406 as directed by Engineer for main work and Junction Improvements | 19,459 | Cum | 2,568.96 | ₹4,99,89,392.64 |
| 9 | Providing and laying Prime coat over WBM/WMM surface using 7kg of Emulsion Bitument (SS1) per 10sqm for preparatory to another bitiminous constrction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MoRT&H-V for main work and Junction Improvements | 73,765 | Sqm | 87.07 | ₹64,22,718.55 |
| 10 | Providing and laying Tack Coat over WBM/WMM surface (treated with primer) using 2.50kg of Bitument Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MoRT&H - V for main work and Junction Improvements | 73,765 | Sqm | 20.2 | ₹14,90,053 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.18 MB
TenderdocumentSivakasi.pdf
Tender Documents • 0.77 MB
BOQ_720630.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .