| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹3.7 CrAccepted-AOC BILLRAM GATE KASGANJ | KASGANJ | UTTAR PRADESH | 207123 | ₹3.7 Cr | l1 | Accepted-AOC ee |
| 2 | l2₹3.8 CrRejected-AOC 12 | ₹3.8 Cr | l2 | Rejected-AOC ee |
| 3 | l3₹4.0 CrRejected-Finance KARAMPUR PATIYALI KASGANJ | ₹4.0 Cr | l3 | Rejected-Finance ee |
| 4 | l4₹4.0 CrRejected-Finance | ₹4.0 Cr | l4 | Rejected-Finance ee |
| 5 | l5₹4.1 CrRejected-Finance | ₹4.1 Cr | l5 | Rejected-Finance ee |
| Sl No | Description | Qty | Unit | M/S KUMAR INFRATECH L7 | RAJ CORPORATION LTD L5 | M/s Raj Laxmi Enterprises L4 | M/S MANOJ SUPPLIERS L2 | KUNJAL PROJECT INDIA PRIVATE LIMITED L6 | M/S RAKESH PRATAP SINGH CHAUHAN L3 | PRO CONSTRUCTION L1 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. I/C cost of material, labour, T&P and all Taxes but Excluding GST | 175 | Cum | 5,000 ₹8.8 L | 9,700 ₹17.0 L | 9,800 ₹17.1 L | 4,000 ₹7 L | 6,000 ₹10.5 L | 9,500 ₹16.6 L | 9,777 ₹17.1 L |
| 2.00 | Providing and applying tack coat with bitumen VG-10 using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. I/C cost of material, labour, T&P and all Taxes but Excluding GST | 1,09,800 | Sqm | 10 ₹11.0 L | 10 ₹11.0 L | 10 ₹11.0 L | 12 ₹13.2 L | 10 ₹11.0 L | 11 ₹12.1 L | 9.77 ₹10.7 L |
| 3.00 | Bituminous Concrete: Grading 2 :- Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects I/C cost of material, labour, T&P and all Taxes but Excluding GST | 3,200 | Cum | 12,600 ₹4.0 Cr | 11,500 ₹3.7 Cr | 11,000 ₹3.5 Cr | 10,900 ₹3.5 Cr | 12,000 ₹3.8 Cr | 11,250 ₹3.6 Cr | 10,077 ₹3.2 Cr |
| 4.00 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface- Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. Required for proper completion of work as per direction by E-in-C in Edge Line, Centre Line & Zebra Crossing etc. I/C cost of material, labour, T&P and all Taxes but Excluding GST | 3,650 | Sqm | 611 ₹22.3 L | 350 ₹12.8 L | 500 ₹18.3 L | 300 ₹10.9 L | 400 ₹14.6 L | 300 ₹10.9 L | 577 ₹21.1 L |
| 5.00 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. I/C cost of material, labour, T&P and all Taxes but Excluding GST | 2,900 | Cum | 10 ₹29,000 | 100 ₹2.9 L | 100 ₹2.9 L | 50 ₹1.4 L | 100 ₹2.9 L | 20 ₹58,000 | 97 ₹2.8 L |
Tender Value
Refer Docs
EMD Value
₹7.7 L
Closing Date
24 Mar 2026, 12:00 pmClosed
ee
ee
Renewal with Special Repairing on etah kayamganj farrukhabad road km- 20-21-22-25-34-35-400 - 37-450 39-41-42 43-44-45-47-49- 51-500 - 52-300
2026_CEALG_1126930_1
644-SE Dt 03-02-2026
Open Tender
Civil Works
365 days
etah
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,854
Yes
₹7.7 L
Yes
22 May 2026
18 Mar 2026
24 Mar 2026
18 Mar 2026
24 Mar 2026
18 Mar 2026
18 Mar 2026 - 24 Mar 2026
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. I/C cost of material, labour, T&P and all Taxes but Excluding GST
Providing and applying tack coat with bitumen VG-10 using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. I/C cost of material, labour, T&P and all Taxes but Excluding GST
Bituminous Concrete: Grading 2 :- Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects I/C cost of material, labour, T&P and all Taxes but Excluding GST
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface- Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. Required for proper completion of work as per direction by E-in-C in Edge Line, Centre Line & Zebra Crossing etc. I/C cost of material, labour, T&P and all Taxes but Excluding GST
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. I/C cost of material, labour, T&P and all Taxes but Excluding GST
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.72 MB
BOQ_2101756.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid