Loading…
Loading…
Tender Value
₹2.6 Cr
EMD Value
₹2.6 L
Closing Date
31 Aug 2026, 11:00 am3d left
The Superintending Engineer
Irrigation Circle, Kalluru
Revival Estimate for Bayyaram Lift Irrigation Scheme on Right Bank of Wyra River in Madhira (M) in Khammam District (3rd Call)
725394
NIT.No:03/2026-27,Dt.06.05.2026(3rd Call)
OPEN
Lift Irrigation
KHAMMAM, TELANGANA
18 documents required · 18 mandatory
₹9,092
₹2.6 L
13 Aug 2026
13 Aug 2026
14 Aug 2026
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement, concrete,woodwork,steel work,including T&P and scaffolding wherever necessary ,sorting the dismantled material,disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000m as per Technical Specification Clause202 MORD / MORT
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete with initial lead upto 50 m and all lifts.(Cement content: 260 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
Providing and laying insitu vibrated M-30 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for sub-structure / superstructure works including cost of all materials,machinery, labour, formwork, scaffolding,cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50m and all lifts.(Cement content: 406 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA :0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
Providing and laying insitu M- 35 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar etc., complete with initial lead upto 50m and all lifts. (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratioof CA--65:35, FA : 0.45 cum)
Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar etc., complete with initial lead upto 50m and all lifts. (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratioof CA--65:35, FA : 0.45 cum)
Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with 1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc., complete with initial lead upto 50 and all lifts.
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for bed and side lining(of thickness 100 mm) of canal including finishing the junction of bed and sides to required curveture, cost of all materials, machinery, labour, formwork including supports, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Manual Lining) (Cement content: 290 kg /cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.90 cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
Providing and fixing 12 mm thick 380 mm depth tarfelt expansion joint filler boards for stone masonry lining of canal including cost of all materials, labour etc., complete with all leads and lifts.
Providing and constructing 225 mm thick dry rubble stone pitching including cost of all materials, labour, hand packing, finishing etc., complete ( rubble stones : 0.2475 cum/sqm) (For Maintenance Works)
Supply and fixing of 310 MM wide water stoppers including cost of all materials, labour etc., complete as per directed by Engineer-in-charge
Providing and fixing 100 mm dia perforated PVC pipes 40 cm long for Weep holes including cost of all ma drilling 8 mm dia holes etc. complete with all leads and lifts. Consider 10 Nos 100 mm dia PVC pipe.
Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Providing embankment using homogeneous soil from approved borrow area in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sortingout, transporting, spreading in layer of specified thickness, breaking clods, sectioning, compacting each layer without watering to density control of not less than 95 percent or as stipulated by sheep's foot / pad foot roller etc., complete with initial lead upto 1 km and all lifts.(For Back filling)
Excavation in all kinds of soil including boulders upto 0.30 m dia for field channels, seating of embankment for field channels etc., including dressing of bed and sides to required profile,cost of all materials, machinery, labour, placing the excavated stuff for formation of service road / embankment as directed etc., complete with lead upto 10 m and lift upto 3 m.
Earth work in excavation in all kinds of soils of foundation of of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material. Excavation for Structures- Mechanical Means
Excavation in ordnary rock without blasting for foundationsof canal cross drainage and other appurtenant structures and placing the excavated stuff neatly in specified dump area or disposing off the same as directed etc., complete with initial lead upto 50 m and initial lift upto 3 m.
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 40 mm down size aggregates for foundation filling including cost of all materials, machinery, labour, formwork,approved, clean, hard, graded cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 260 kg / cum, CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) With Dewatering.
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for Substructure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 330 kg / cum, CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum -with dewatering
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for Super structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 330 kg / cum, CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum - with dewatering
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for Super structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 330 kg / cum, CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum - without dewatering
Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with 1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc., complete with initial lead upto 50 and all lifts.
Laying of Sand Bags in the stipulated places including cost of empty cement bag, sand, thread, stitching charges and labour charges etc., with 13.615% overhead charges and contractors profit.
Fabrication,Supply and fixing of Trash rack, Lifting beams and specials including cost of Mild Steel, Structural steel i.e., Angles, Channels & I-Sections, cutting, bending, welding, transportation, fixing in position etc., complete for finished item of work as directed by the Engineer in charge.
Excavation in all kinds of soil including boulders upto 0.3 m diameter for canal, seating of embankment, filter drains / catch water drains etc., including dressing bed and sides to required level and profile, cost of all materials, machinery, labour, placing the excavated soil neatly in dump area or for the formation of service road / embankment as directed etc., complete with initial lead upto 1 km and all lifts.
Excavation in ordinary rock (including HDR) without blasting including boulders above 0.30 m upto 0.6 m dia.For canals, seating of embankment, filter drain / catch water drains etc., including dressing of bed and sides to required level and profile, cost of all materials, machinery, labour, placing the excavated soft rock neatly in dump area or for formation of service road as directed etc., complete with a lead upto 1 km and all lifts.
Excavation in hard rock (including F&F rock) requiring blasting including boulders above 0.6 m upto 1.2 m dia. For canals, seating of embankment, filter drain / catch water drains etc., including dressing bed and sides to required level and profile, cost of all materials, machinery, labour, placing the excavated rock in dump area or for formation of service road as directed etc., complete with a lead upto 1 km and all lifts.
Manufacture, Supply and Delivery of R.C.C. Spun / Vibrated Cast (Reinforced) Socket and Spigot pipes of 1000 mm dia (NP3 Pipes) conforming to B.I.S. 458/2003 at exfactory (rate per metre of effective length) including transportation & taxes.
Manufacture, Supply and Delivery of Rubber rings to suit R.C.C. Spun / Vibrated Cast (Reinforced) Socket and Spigot pipes of 1000 mm dia (NP3 Class) conforming to B.I.S 5382/ 1985 (rate per each rubber ring) including transportation but excluding taxes. The Rubber Rings shall be tested at the factory premises conforming to B.I.S. 5382/1985.
Laying and jointing 1000 mm dia. NP- 3 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 49.5 kg / joint, FA : 0.05cum/joint, Hemp Yarn : 0.377kg/joint)
Excavation for foundation in all kinds of soil including boulders upto 0.30 m diameter for dam, spillway, intake structure and other appurtenant works and placing the excavated soil neatly in dump area or disposing off the same as directed etc., complete with initial lead upto 1 km and all lifts.
Excavation for foundation in ordinary rock (including HDR) without blasting including boulders above 0.3 m upto 0.6 m dia for dam, spillway, intake structure and other appurtenant works and placing the excavated material neatly in dump area or disposing off the same as directed etc., complete with initial lead upto 1 km and all lifts.
Excavation for foundation in hard rock (including F&F) requiring blasting including boulders above 0.6 m upto 1.2 m dia. for dam, spillway, intake structure and other appurtenant works and placing the excavated material neatly in dump area or disposing off the same as directed etc., complete with initial lead upto 1 km and all lifts
Excavation for foundation in hard rock of all toughness by blasting including boulders above 1.2 m dia. for dam, spillway, intake structure and other appurtenant works and placing the excavated rock neatly in dump area or stack yard including levelling as directed etc., complete with initial lead upto 1 km and all lifts lead upto 2km
Providing and laying insitu vibrated M-25 ( 28 days cube compressive strength not less than 25N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for sub-structure / works including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 330 kg+50Kg / cum, CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum(with Dewatering)
Providing and laying insitu vibrated M-25 ( 28 days cube compressive strength not less than 25N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for super-structure / works including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 330 kg+50Kg / cum, CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum( with dewatering )
Providing and laying insitu vibrated M-25 ( 28 days cube compressive strength not less than 25N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for super-structure / works including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 330 kg+50Kg / cum, CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum( without dewatering )
Providing and laying insitu vibrated M-25 ( 28 days cube compressive strength not less than 25 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates including cost of all materials, labour, machinery, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for columns and beams, walls with initial lead upto 50 m and all lifts. (Cement content: 330 kg / cum +50kg, CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) with dewatering
Providing and laying insitu vibrated M-25 ( 28 days cube compressive strength not less than 25 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates including cost of all materials, labour, machinery, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for columns and beams, walls with initial lead upto 50 m and all lifts. (Cement content: 330 kg / cum +50kg, CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) without dewatering
Brick Masonry in CM (1:6) with 2nd class Bricks traditional size 23 x 11 x 7 cms etc., complete including cost and conveyance of all materials, labour charges.
Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick with sponze finishing, including cost and conveyance of all materials, labour charges.
Plastering with CM 2 coats, 20 mm thick, base coat in CM (1:6), 16mm thick and top coat in CM (1:4), 4mm thick with Dubara sponze finishing, including cost and conveyance of all materials, labour charges.
Painting to new walls with 2 coats of water proof cement paint of apporved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for internal walls.
Painting to new walls with 2 coats of water proof cement paint of apporved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for external walls.
Providing and fixing of Casement/ Open able Windows made of pre-painted steel as per IS 513of 0.58 mm thick galvanized as per IS 277, finish painted with a polyester paint and section for outer frame of 48 x 50 mm, centre mullion of 48x 50 mm, section for shutter of 48 x 25 mm and the fixed glass beading section should be 12 x 12 mm and the outer frame and mullions to have rebate for glazed shutter with a 20 mm provision for guard bars/grills, handle, stay, 2 nos. of stainless steel heavy duty pivot hinges provided per shutter and windows fitted with 5 mm thick plain float glass with rubber gaskets including fixing the frames in concrete/masonry wall by means of self-expanding screws, Including 10mm Square guard bars with 6” 152.4mm) pitch etc., complete Single shutter Window without vertical mullion for size 2’0”x4’0” (609.6mm x 1219.2mm)
Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together through their entire length and jointed together at the ends by end-locks, mounted on specially designed pipe shaft of 50mm Diameter nominal bore MS B class pipe with brackets, plates, guide channels, stoppers, bottom locking plates and arrangements for inside & outside locking with push-pull operations including cost of hood cover and springs complete, painted with one coat of approved steel primer, locks, ball bearings, all accessories etc complete for finished item of work as per special Spec:1108
Supply and fabrication of stainless steel railing works using Stainless Steel Tubes, sections, plates, sheets & pipes of all sizes & Diameters for - 304 Grade stainless steel welding rods including buffing, polishing, lacquer finishing, to present seamless finish including labour charges.
Painting of embedded metal parts and all types of gates, stoplogs,etc, on sand blasted surfaces with one coat of inorganic zinc silicate (airless spray preferred)70+/- 5 and two super coats with a total thickness of 300 microns (each 150+/- 5) of solventless coaltar epoxy paint each coat 150 microns ( total 300 microns) cost of all materials, labour, scaffolding etc., complete with all leads and all lifts
Design, fabrication, supply, erection and commissioning of rail track using 45 kg / m standard rails on spillway bridge for movement of gantry crane for handling and operating spillwaystoplog gate elements / river sluice / canal sluice emergency gate including cost of all materials, machinery, labour, complete as per specifications (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as perscedule of rates under items in this chapter and add as applicable separately)
Providing homogeneous embankment using soil from approved borrow areas in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, complete with lead upto 1 km and all lifts.
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 40 mm down size aggregates for foundation filling including cost of all materials, machinery, labour, formwork,approved, clean, hard, graded cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 260 kg / cum, CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) without dewatering - for foundation filling
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for sub-structure works including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 330 kg / cum, CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum - without dewatering)
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates including cost of all materials, labour, machinery, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for columns and beams, walls with initial lead upto 50 m and all lifts. (Cement content: 330 kg / cum, CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) without dewatering - for columns and beams
Supply and fixing of 75x75x6mm MS angles
Supply and fixing of Hot dipped Galvanized Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-1979: 2"x2" (50 mm x 50 mm) - 8 Gauge
Supply, Transportation, laying, testing & commissioning of 'C' class heavy duty MS pipe conforming to IS 3589/IS 1239 including Welding, fittings like elbows, tees, flanges, tapers, nuts bolts, gaskets etc. and fixing the pipe on the wall/ceiling with suitable clamp/support frame and painting with two or more coats of synthetic enamel paint of required shade complete as required
Dismantling, clearing away and carefully stacking materials useful for reuse of stone masonry in cement mortar, including labour charges and all incidential charges etc., complete as per specifications and as directed by the Engineer in charge for finished item of work
a) Vertical turbine Pump with 0.10 cumecs discharge and 30 KW Induction Motor with 415 V terminal voltage along with associated auxiliaries and all associated equipment
b) Manually operated Gate valve 250 mm dia for discharge of 0.10 cumecs each pump dia as per SSR 2025-26
c) Non Return Valve 250 mm dia for discharge of 0.10 cumecs for each pump as per SSR 2025-26
d) Star Delta starter panel
a) H T and L T power Cables
b) Control cables including cable trays laying of cables etc
Miscellaneous (unforeseen ) items cost 1% on Total Equipment cost
Spares @ 10% on equipment cost
Add T&P @ 1 % on equipment cost
Freight @ 1% on total cost of equipment
Insurance @ 1% on total cost of equipment
Erection,Testing and commissioning @ 10% of cost of equipment
Station Auxiliary Board (415V) i)200 A incoming feeder - 2 Nos from 125 KVA transformer ii) 100 A outgoing feeders for motors - 3 Nos ( 2 Nos pumps + 1 No spare) iii) 63A outgoing feeder - 4 Nos iv) 32A outgoing feeder - 4 Nos
100 AH, 24 V DC Battery with Battery charger and D C D B in seperating panels
Power House Earthing
Fire Protection system
415V Capacitor banks
Miscellaneous (unforeseen ) items cost 1%
Spares @ 10% on equipment cost
Add T&P @ 1% on equipment cost
Frieght @ 1% on total cost of equipment
Insurance @ 1% on total cost of equipment
Erection,Testing and commissioning @ 10% of cost of equipment
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Bayyaram LIS BOQ.xls
TENDER_DOCUMENT • 0.34 MB
Final Milestone Program 01 Year.xlsx
TENDER_DOCUMENT • 0.01 MB
NIT 03 2026 27.docx
TENDER_DOCUMENT • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].