| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.5 CrQualified 20 B UCHHAB BHAWAN BEDLA ROAD FATEHPUR UDAIPUR 313004 | UDAIPUR | RAJASTHAN | 313004 | ₹49.5 Cr | L1 | Qualified MII |
Tender Value
₹50.5 Cr
EMD Value
₹50 L
Closing Date
24 Jul 2024, 11:00 amClosed
SUPPLY OF CRAWLER MOUNTED 320HP DOZER WITH 4
6445730
GEM/2024/B/4983059
Two Packet Bid
Crawler mounted 320 HP Dozer,Crawler mounted 320 HP Dozer,Crawler mounted 320 HP Dozer,1st Year Spa
120 days
Maharashtra; Chandrapur
Total value wise evaluation
BOQ
3 documents required · 3 mandatory
₹50 L
16 Aug 2024
28 Jun 2024
24 Jul 2024
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | Crawler mounted 320 HP Dozer | Design, manufacture, testing, delivery, on-site erection and commissioning of Crawler mounted 320 HP Dozer Engine Net Power Range 310-330 HP along with standard accessories, standard Tools | 3 | pieces | kskattimani | 120 |
| 2 | Crawler mounted 320 HP Dozer | Design, manufacture, testing, delivery, on-site erection and commissioning of Crawler mounted 320 HP Dozer Engine Net Power Range 310-330 HP along with standard accessories, standard Tools | 4 | pieces | rkkonda | 120 |
| 3 | Crawler mounted 320 HP Dozer | Design, manufacture, testing, delivery, on-site erection and commissioning of Crawler mounted 320 HP Dozer Engine Net Power Range 310-330 HP along with standard accessories, standard Tools | 3 | pieces | mayureshcst | 120 |
| 6 | 1st Year Spares and Consumables | Set of Spares and Consumables Per each Equipment required for initial 12 months of operation the equiment during the warranty period from the date of commissioning of Equipment During Guarantee Period | 3 | pieces | kskattimani | 120 |
| 7 | 1st Year Spares and Consumables | Set of Spares and Consumables Per each Equipment required for initial 12 months of operation the equiment during the warranty period from the date of commissioning of Equipment During Guarantee Period | 4 | pieces | rkkonda | 120 |
| 8 | 1st Year Spares and Consumables | Set of Spares and Consumables Per each Equipment required for initial 12 months of operation the equiment during the warranty period from the date of commissioning of Equipment During Guarantee Period | 3 | pieces | mayureshcst | 120 |
| 10 | 2nd Year Spares and Consumables | Set of Spares and Consumables Per each Equipment required for 2nd Year operation the equiment from the date of commissioning of Equipment | 3 | pieces | kskattimani | 850 |
| 11 | 2nd Year Spares and Consumables | Set of Spares and Consumables Per each Equipment required for 2nd Year operation the equiment from the date of commissioning of Equipment | 4 | pieces | rkkonda | 850 |
| 12 | 2nd Year Spares and Consumables | Set of Spares and Consumables Per each Equipment required for 2nd Year operation the equiment from the date of commissioning of Equipment | 3 | pieces | mayureshcst | 850 |
| 14 | 3rd Year Spares and Consumables | Set of Spares and Consumables Per each Equipment required for 3rd Year operation the equiment from the date of commissioning of Equipment | 3 | pieces | kskattimani | 1215 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_6445730.pdf
GEM_BID
nit_2024-05-27-11-39-16_0523f154b0fa5f1138d1b8948720b1a4.pdf
BOQ
boq_2024-05-27-11-39-16_65c0455c80d5aae67c127d8546dd0e7b.csv
BOQ
1716790332.xlsx
OTHER
IP_Format_b253605c-c087-4195-97121716790936872_sachin.khodke.pdf
OTHER
ATCC_up_718b331e-1830-4f54-aac91719033990779_sachin.khodke.doc
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER