| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.4 LAccepted-AOC BERMO DHORI 1077A RANIBAG DHORI BOKARO 825102 JHARKHAND INDIA | BOKARO | BOKARO | JHARKHAND | 825102 | L1 | Accepted-AOC L1 bidder is techno commercially qualified. | |
| 2 | L2₹9.9 L+₹29,640 (3.08%)Rejected-Finance AT CHANDRAPURA ROAD PHUSRO DIST BOKARO | L2 | Rejected-Finance Bid not be opened as per NIT terms. | |
| 3 | Rejected-Technical SHASWTA CITY PUPUNKI KALA PATHAR CHAS BOKARO JHARKHAND INDIA 827013 | BOKARO | JHARKHAND | 827013 | - | Rejected-Technical Disqualified |
Tender Value
₹11.4 L
EMD Value
₹14,300
Closing Date
27 Feb 2025, 10:00 amClosed
SO(EnM), Dhori
Office of the General Manager, Dhori area, Po- Dhori , pin-825102, Bokaro
Repairing and rectification with spares of chain conveyor drive shaft assembly, tail end shaft assembly and secondary crusher drum roll assembly for Black Diamond make Feeder Breaker (Machine No-06) in respect of AADOCM, Dhori Area
2025_CCL_329073_2
GM(D)/SO(EnM)/DA/24-25/67
Open Tender
Electrical and Maintenance Works
Item Wise
15 days
AADOCM
please refer tender documents
2 documents required · 2 mandatory
₹14,300
2 Apr 2025
15 Feb 2025
28 Feb 2025
17 Feb 2025
27 Feb 2025
17 Feb 2025
17 Feb 2025 - 24 Feb 2025
Amount
Part A: Repairing of Chain Conveyor Drive Shaft assembly of Black Diamond make F/B
Removing of gear coupling set from drive shaft with the help of making one structure frame as per required for fixing hydraulic jacks & structure welding with gear coupling by special jointing steel electrodes & after repairing & rectification re-fitting with the help of hydraulic press machine.
Dismantling of Drive shaft assembly both side bearing housing cover, bearing housing, sleeve check nut, shaft check nut, bearing, sleeve, dust seal, cover bolts, block bolts, sprocket with the help of hydraulic jacks, gas heating, hammering, pulling, pushing.
DE & NDE main bearing removing with the help of puller & getting out.
Drive shaft drum shell complete cutting by gas in piece-piece.
Drive shaft sprocket all old welding complete cutting/gauzing
Drive shaft damaged and worn out key way repairing by multilayer welding and machining then after new key way cutting as per both side one line alignment.
Heavy duty key new making for above sprocket & drive shaft.
Dust triple seal damaged and worn-out OD, face and grooves full round multilayer welding and machining as per std size.
Drive shaft oil seal worn-out seat full welding in double layer & m/c as per std size.
Oil seal new provide and fixing for above drive shaft.
Worn-out & damaged sprocket tooth’s height, width, length & shape increasing by hard facing steel electrodes & shaping by grinding as per conveyor chain links. 28Nos Tooth’s
New M.S Plate shell making as per required shape & size with the help of cutting, welding of size- 12” diameter x 35” length x 8mm thickness
Bearing housing & back side cover plate dust seal seat, color, groove, face, back side increasing by welding method full round as per required & machining, polishing, alignment setting of L.H & R.H
New Sleeve with check nut & lock washer as per size for 23140BK.MB.C4 Bearing for L.H & R.H.
Both end main bearing, dust seal seat, shaft bearing seat, thread cleaning & greasing.
DE & NDE bearing fitting & setting in Drive shaft with alignment & measurement with the help of hydraulic jacks.
Re-assembling of bearing housing, dust seal, bearing covers, block bolts, cover bolts & proper alignment setting with the help of hydraulic jacks, pulling, pushing.
Drive shaft complete assembly includes bearing housing setting with proper alignment, adjustment, commissioning work done at Amlo siding site.
Trail run testing & proper checking at Amlo siding site.
Part B: Repairing of Chain Conveyor Tail End shaft assembly of Black Diamond make F/B
Dismantling of Tail End shaft assembly both side bearing housing cover, bearing housing, sleeve check nut, shaft check nut, bearing, sleeve, cover bolts, block bolts, sprocket with the help of hydraulic jacks, gas heating, hammering, pulling, pushing.
DE & NDE main bearing removing with the help of puller & getting out.
Heavy duty key new making for above sprocket & Tail shaft.
Dust triple seal damaged and worn-out OD, face and grooves full round multilayer welding and machining as per std size.
Tail shaft oil seal worn-out seat full welding in double layer & m/c as per std size.
Oil seal new provide and fixing for above drive shaft.
Worn-out and badly damaged sprocket tooth’s height, width, length & shape increasing by hard facing steel electrodes & shaping by grinding as per required of conveyor chain links. 28Nos Tooth’s
New Sleeve with check nut & lock washer as per size for 23140BK.MB.C4 Bearing for L.H & R.H.
Both end main bearing, dust seal seat, shaft bearing seat, shaft thread cleaning & greasing.
DE & NDE bearing fitting & setting in Tail End shaft with alignment & measurement with the help of hydraulic jacks.
Tail End shaft complete assembly includes bearing housing setting with proper alignment, adjustment, commissioning work done at Amlo siding site.
Trail run testing & proper checking at Amlo siding site.
Part C: Repairing of Black Diamond Secondary Crusher Drum Roll assembly No-01 of Black Diamond make Feeder Breaker.
Dismantling of secondary crusher drum roll drive motor, drive pulley, adjusting studs, block bolts, cover bolts with the help of gas cutting, welding, hydraulic jacks, pulling, pushing with skilled fitters & labour.
Lifting of secondary crusher roll manually with the help of Hydraulic Jacks, Screw Jacks system and providing proper supporting for drawing out the bearings.
D.E & N.D.E main bearing removing by pulling with the help of pullers.
Drum roll shaft damaged & worn-out bearing seat repairing by full round steel metal filling by welding method & roundness grinding & shaping as required & polishing by failing & amri paper with the help of hand grinding machine at site.
D.E & N.D.E side C.S casting bearing housing inner & outer cover repairing with casting, machining, drilling, dust sealing groove making tapping Both side.
D.E & N.D.E side C.I. Casting Inner & Outer side bearing dust seal new making with casting & machining, groove cutting.
New Sleeve with check nut & lock washer as per size for 23044 CK Bearing for L.H & R.H.
D.E & N.D.E bearings re-fitting and setting in shaft at site with misalign drum roll re-alignment & re-shifting with the help of hydraulic jacks
Both end drum roll shaft cleaning and after repairing greasing of bearings with housing.
Crusher drum roll housing/block adjusting jack screw shaft new making as per required size & measurement in full thread with one end seat & other end head for D.E & N.D.E side
Heavy duty check nut & lock nut new making for above block jack screw.
30mm x100mm H.T block bolts new with nut.
Re-assembling of blocks, bearing housing cover, cover bolts, adjusting jack screw, drive pulley & proper alignment setting with the help of gas cutting, welding, chain block, hydraulic jacks, pulling, pushing with skilled fitters & labour.
Total impact of GST for the purpose of CTC
M/S SHRIKARNI LATHE & WELD (BID ID -1133003)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .