Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 LAccepted-AOC FIRST FLOOR GEETA COMPLEX ROHTAK ROHTAK ROHTAK HARYANA 124001 | ROHTAK | HARYANA | 124001 | L1 | Accepted-AOC accepted | |
| 2 | L2₹6.7 L+₹1.5 L (27.7%)Rejected-AOC | L2 | Rejected-AOC rejected |
Tender Value
₹6.7 L
EMD Value
₹13,500
Closing Date
6 Nov 2023, 5:00 pmClosed
VISHWNATH KHICHI
ED - Rohtak
The PGIMS Rohtak formerly known as Medical College and Hospital, Rohtak is one of premier Medical institute in northern India.
2023_HRY_320970_1
2023679358F9 D6E6 47FA B599 307FBC76A983667BAR
Open Tender
Electrical Works
Works
365 days
Rohtak
Technical documents as per approved DNIT conditions.
3 documents required · 3 mandatory
₹1,000
Yes
₹13,500
Yes
9 Jan 2024
16 Oct 2023
7 Nov 2023
16 Oct 2023
6 Nov 2023
16 Oct 2023
Amount
HSR Items
[23.23.9]MISCELLANEOUS 9. Supplying and drawing of 1 no UTP 4 pair CAT 6 LAN Cable in the existing surface/recess MS/PVC conduit as required
[23.7.6.2]PVC CONDUIT PIPE ONLY (SURFACE OR RECESSED) FOR ELECTRICAL POINTS 6.2. Supply and erection of PVC CONDUIT ISI marked (Medium) recessed in wall/ceiling etc. including the cost of PVC bends, inspection boxes, iron hooks and cement concrete etc. complete in all respect up to the entire satisfaction of Engineer-in-Charge of work. PVC pipe of 25 mm dia.
NS Items
Supply, Erection, Testing and Commissioning 24-Port 10/100Mbps Fast Ethernet ports Networking Switch with the minimum features of Switching capacity 4.8 Gbps, Fast Ethernet: 148,800 pps per port, 100BASE-TX, Forwarding rate 14,880 pps for 10 M complete in all respect. Make:- Cisco/D-Link/Juniper/Extreme Networks
Supply, Erection, Testing and Commissioning of 2 KVA Online UPS/ Inverter with 1 hour battery backup complete in all respet. Make:- Microtek/Luminous/Emerson
Supply, Erection, Testing and Commissioning of PVC Industrial Channel 45mm*45mm Size complete in all respect up to the entire satisfaction of Engineer-in-Charge of the work DLINK / AMP/SGI/ Digilink make.
Supply, Erection, Testing and Commissioning of UTP Cat-6 information outlet box complete in all respect up to the entire satisfaction of Engineer-in-Charge of the work AMP/ D-link/ Lucent make.
Supply, Erection, Testing and Commissioning of Face plate (Single / Dual) complete in all respect up to the entire satisfaction of Engineer-in-Charge of the work. Make:AMP/ D-link/ Lucent .
Supply, Erection, Testing and Commissioning of Information Outlet connector complete in all respect up to the entire satisfaction of Engineer-in-Charge of the work AMP/ D-link/ Lucent make.
Supply, Erection, Testing and Commissioning of UTP Cat-6 Mounting Patch Cords complete in all respect up to the entire satisfaction of Engineer-in-Charge of the work. Make: AMP/Molex/ Dlink (i) 3 ft length
Supply, Erection, Testing and Commissioning of UTP Cat-6 Mounting Patch Cords complete in all respect up to the entire satisfaction of Engineer-in-Charge of the work. Make: AMP/Molex/ Dlink (ii) 5 ft length
Supply, Erection, Testing and Commissioning of 6/9U rack including power distribution kit complete in all respect Make: Comrack / Valrack / HN
Supply, Erection, Testing and Commissioning of 24 port Cat-6 jack patch panel complete as per specification up to the entire satisfaction of Engineer-in-Charge of the work. Make: AMP/D-link/ Panduit/ Lucent .
Supply, Erection, Testing and Commissioning of Cable manager complete as per specification up to the entire satisfaction of Engineer-in-Charge of the work. Make: AMP/D-link/ Panduit/ Lucent
Supply, Erection, testing and commissioning of Digital Hybrid IP-PBX System configured for 04 PandT, 02 Digital Extensions, 24 Analog Extensions. It should be possible to reach the capacity of system to 48 ports and 99 IP users without any add-on CPU or chassis/hardware platform. System should have two Gigabit Ethernet ports for LAN and WAN to separate out local and VoIP traffic on external network.It should be suitable for DTMF as well as the FSK type of telephone instruments. It should have built-in multi-party conferencing without any software licensing. It should be possible to carry out 15 conferences of 3-participants at a time. The system shall have built-in web based software programming tool for system administration. The call ringing sequence would be programmable and have options such as simultaneous, hunting off, round robin and delayed simultaneous.The system shall support flexible numbering for extensions such as it may have extensions with 1 digit, 2 digits and up to 6 digits numbers as well as in combination of all.The system should have built-in outgoing Call Log buffer of 6000 calls, incoming call log buffer of 5000 and call log buffer of 1000 internal calls. Operator features shall have the assistance to extension, attended call transfer, call intercept, indication of call waiting, night service control etc. should be available by default. Make: - Avaya/ Siemens (Unify) Matrix / Alcatel
Supply, Erection, testing and commissioning of 16 Digital Key Telephone System complete in all respect. Make: - Avaya/ Siemens (Unify) Matrix / Alcatel
Supply, Erection, testing and commissioning of 16 Digit Display Caller ID Spkr Telephone Instrument with Support 30 incoming call memory, 5 outgoing, Mute button, redial and call back features. Make: - BEETEL/ PANASONIC/AVAYA
Supply, Erection, testing and commissioning of Telephone in/out connector box complte in all respect Make: Dlink/AMP/Schneider
Supply, Erection, testing and commissioning of Telephone in/out connector with face Plate complte in all respect Make: Dlink/AMP/Schneider
Supply and laying of multicore telephone cable conductor size 0.51 mm bright annealed copper conductor PVC insulated and shealed in existing pipe/Channel and making necessary connection complete in all respect upto the entire satisfaction of the Engineer- in-Charge of the work. Make Usha/Delton (i) 2 Pair Telephone Wire
Supply and laying of multicore telephone cable conductor size 0.51 mm bright annealed copper conductor PVC insulated and shealed in existing pipe/Channel and making necessary connection complete in all respect upto the entire satisfaction of the Engineer- in-Charge of the work. Make Usha/Delton (ii) 10 Pair Telephone Wire
Supply and erection of IDF/MDF with Krone Make module on Krone Make MS Box duly painted and having lock facilities. (i) 50 Pair
Supply and erection of IDF/MDF with Krone Make module on Krone Make MS Box duly painted and having lock facilities. (ii) 20 Pair
North West Telecom
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .