Loading…
Loading…
Tender ID
Tender Value
₹63.8 L
EMD Value
₹1.3 L
Closing Date
8 Apr 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
SR. CDO WB
13 conditions · 2 needing a document upload
As per tender document
As per tender document
8 conditions · 3 needing a document upload
As per tender document
As per tender document
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
All the rate quoted by the tenderer shall be inclusive of GST
Modification work of shifting of water pressurizer unit of EPPFS from underslung to onboard behind the attachment wall of lavatory in all LHB type coaches of WB & MZN coaching depots of Mumbai Division
CRMUM0MECHNCCO1642025
CRMUM0MECHNCCO1642025
Open
Works - General
12 Months
Mumbai, Maharashtra
₹0
₹1.3 L
8 Apr 2026
18 Mar 2026
25 Mar 2026
11 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 63,82,089 | ||
| — | 593.00 | — | — | ||
| Shifting of water pressurizer unit behind attachment wall of lavatory module (underslung to onboard) in LHB AC coaches as per CAI of RDSO L.No. MC/CB/LF/Anaerobic dated 07.10.2024 | — | — | — | 5,24,805 | |
| — | 518.00 | — | — | ||
| Shifting of water pressurizer unit behind attachment wall of lavatory module (underslung to onboard) in LHB NON AC coaches as per CAI of RDSO L.No. MC/CB/LF/Anaerobic dated 07.10.2024 | — | — | — | 4,58,430 | |
| — | 1237.00 | — | — | ||
| Fitment of Metallic Y strainer (3/4") (0.75 inch) between isolating cock & input water supply of pressurized flushing system as per CAI of MCF/RBL L.No. RBL-MD46111-XII (Pt-1), Vol-I dated 06.07.2024 (Material will be provided by Railways) | — | — | — | 8,75,796 | |
| — | 1706.00 | — | — | ||
| Supply & fitment of ¼" (0.25 inch) NRV between FP input isolating cock & air filter regulator of pressurized flushing system as per Ref (3) CAI of MCF/RBL L.No. RBL-MD46111-XII (Pt-1), Vol-I dated 02.02.2024 | — | — | — | 12,07,848 | |
| — | 1873.00 | — | — | ||
| Supply & fitment of 2 Amp 2 Pole MCB with IP-67 rating Box cover as per (Schedule of Technical Requirements for Electro-Pneumatic Pressurized Flushing System for LHB coaches) MMDTS 19027 Rev-3 dated 22.12.2022 | — | — | — | 33,15,210 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
FinalApprovedTD.pdf
ATTACHMENT
GCC Works 2022
ATTACHMENT
GCC_April-2022_compressed.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .