| Sl No | Description | Qty | Unit | S. VALARMATHI L2 | THIRUMURUGAN L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all classes of soil such as hard stiff clay hard red earth, earth murrams gravel stoney erath, earth mixed with fair size boulders as per SS 20B for foundation.etc., complete | 7.87 | cu.m | 268 ₹2,109.16 | 263 ₹2,069.81 Lowest |
| 2.00 | Filling with M.sand including cost and conveyance to work site including all labour charges for filling etc complete | 3.78 | cu.m | 2,005 ₹7,578.9 | 2,002 ₹7,567.56 Lowest |
| 3.00 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges etc complete | 4.73 | cu.m | 5,825 ₹27,552.25 | 5,821 ₹27,533.33 Lowest |
| 4.00 | Supplying and errecting centring for sides and soffits of all RCC works including cost and conveyance of all materials to site and labour charges etc. complete | 16.61 | Sqm | 548 ₹9,102.28 | 547.5 ₹9,093.98 Lowest |
| 5.00 | R.C.C. 1:11/2:3 mix using 20mm mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges etc complete | 3.31 | cu.m | 9,580 ₹31,709.8 | 9,567 ₹31,666.77 Lowest |
| 6.00 | Supplying and fabrication of steel including cost of steel and binding wire to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works | 0.27 | MT | 91,952 ₹24,827.04 | 91,950 ₹24,826.5 Lowest |
| 7.00 | Brick work in cm1:5 mix using country bricks of size 8 3/4" x 4 1/4" x 2 3/4" including cost and conveyance of all materials to work site and all labour charges etc complete | 11.07 | cu.m | 6,238 ₹69,054.66 | 6,236 ₹69,032.52 Lowest |
| 8.00 | Cost and Supply of 100mm dia GI Pipe including cost and conveyance of all materials to work site and all labour charges etc complete | 20.7 | Rm | 1,072 ₹22,190.4 | 1,069 ₹22,128.3 Lowest |
| 9.00 | Supply of fixing Base Plate for post including cost and conveyance and all labour charges etc.complete. | 12 | Kg | 134 ₹1,608 | 132.15 ₹1,585.8 Lowest |
| 10.00 | Supply and fixing of steel truss using Hollow Tubuler section including cost and conveyance of all materials to work site and all labour charges etc complete | 704.14 | Kg | 134 ₹94,354.76 | 132.15 ₹93,052.1 Lowest |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
18 Feb 2026, 3:00 pmClosed
Block Developement Officer(BP)
Panchayat Union Office,Aranthangi
Construction of Gym at Thirunalur North in Thirunalur Panchayat
2026_RDTN_653867_1
585/2025/A2 MLA CDS WORK 06
Open Tender
Civil Works - Buildings
Item Rate
180 days
ARANTHANGI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5,000
26 Feb 2026
10 Feb 2026
18 Feb 2026
10 Feb 2026
18 Feb 2026
10 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in all classes of soil such as hard stiff clay hard red earth, earth murrams gravel stoney erath, earth mixed with fair size boulders as per SS 20B for foundation.etc., complete | 7.87 | cu.m | - | - |
| 2 | Filling with M.sand including cost and conveyance to work site including all labour charges for filling etc complete | 3.78 | cu.m | - | - |
| 3 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges etc complete | 4.73 | cu.m | - | - |
| 4 | Supplying and errecting centring for sides and soffits of all RCC works including cost and conveyance of all materials to site and labour charges etc. complete | 16.61 | Sqm | - | - |
| 5 | R.C.C. 1:11/2:3 mix using 20mm mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges etc complete | 3.31 | cu.m | - | - |
| 6 | Supplying and fabrication of steel including cost of steel and binding wire to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works | 0.27 | MT | - | - |
| 7 | Brick work in cm1:5 mix using country bricks of size 8 3/4" x 4 1/4" x 2 3/4" including cost and conveyance of all materials to work site and all labour charges etc complete | 11.07 | cu.m | - | - |
| 8 | Cost and Supply of 100mm dia GI Pipe including cost and conveyance of all materials to work site and all labour charges etc complete | 20.7 | Rm | - | - |
| 9 | Supply of fixing Base Plate for post including cost and conveyance and all labour charges etc.complete. | 12 | Kg | - | - |
| 10 | Supply and fixing of steel truss using Hollow Tubuler section including cost and conveyance of all materials to work site and all labour charges etc complete | 704.14 | Kg | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
arg06.pdf
Tender Documents • 0.24 MB
BOQ_784079.xls
BOQ • 1.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .