Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAccepted-AOC | ₹1.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.3 LRejected-AOC | ₹1.3 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | A.Vinayagam L1 | K SEKAR L2 |
|---|---|---|---|---|---|
| 1.00PROVIDING CC PAVEMENT BAJANAI KOIL CROSS STREET IN OZGHUR PANCHAYAT AT OZGHUR 28.30m IN SHOLINGHUR BLOCK RANIPET DISTRICT | |||||
| 2.00 | cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum | 11.25 | Sqm | 5,100.4 ₹57,379.50 | 5,105.49 ₹57,436.76 |
| 3.00 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete 10 cum | 8.44 | Cum | 6,480.59 ₹54,696.18 | 6,503.59 ₹54,890.30 |
| 4.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 20,173.62 ₹20,173.62 | 20,218.87 ₹20,218.87 |
Tender Value
₹1.4 L
EMD Value
₹1,375
Closing Date
26 Feb 2026, 3:00 pmClosed
BDO BP
Panchayat Union Sholinghur
PROVIDING CC PAVEMENT BAJANAI KOIL CROSS STREET IN OZGHUR PANCHAYAT AT OZGHUR 28.30m IN SHOLINGHUR BLOCK RANIPET DISTRICT
2026_RDTN_666136_1
A2/1596/2025
Open Tender
Civil Works
180 days
Sholinghur
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹1,375
Yes
6 Mar 2026
25 Feb 2026
26 Feb 2026
25 Feb 2026
26 Feb 2026
25 Feb 2026
PROVIDING CC PAVEMENT BAJANAI KOIL CROSS STREET IN OZGHUR PANCHAYAT AT OZGHUR 28.30m IN SHOLINGHUR BLOCK RANIPET DISTRICT
cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete 10 cum
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
BOQ_800141.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid