Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹51.5 LAccepted-AOC | ₹51.5 L | L1 | Accepted-AOC L1 Bidder |
| Sl No | Description | Qty | Unit | BISWAJIT SARMA L1 |
|---|---|---|---|---|
| 1.00 | Installation of DTW (Size 200mm X 150 mm ) by DTH Rig Boring
8.1.1 Preparation of site for placement of the drilling rig including excavation of mud pit, circulation drain, collection chamber etc. all complete as directed. | 1 | Each | 9,109 ₹9,109 |
| 2.00 | 8.1.2 Movement of Rig from the Divisional Head Quarter to the drilling site including cost of P.O.L. all complete as directed. | 25 | Km | 32 ₹800 |
| 3.00 | 8.1.3 Transportation of all ancillary equipments, camp materials, welding set, rig accessories etc. from Divisional Head Quarter to worksite to and fro including cost of P.O.L. all complete as directed.
(a) Upto 100.00 Km distance from Divisional H.Q | 25 | Km | 45 ₹1,125 |
| 4.00 | 8.1.4 Transportation of all store materials like pipes, strainer, cone, socket, clamp, bentonite etc. from Divisional Head Quarter to worksite to and fro including cost of P.O.L. all complete as directed.
(a) Upto 100.00 Km distance from Divisional H.Q. | 25 | Km | 45 ₹1,125 |
| 5.00 | 8.1.5 Transportation of air compressor from the Divisional Head Quarter to the drilling site with all accessories including cost of P.O.L. all complete as directed.
(a) Upto 100.00 Km distance from Divisional H.Q. | 25 | Km | 45 ₹1,125 |
| 6.00 | 8.1.6 Transportation of P.O.L. all complete as directed | 900 | ltr | 8.42 ₹7,578 |
| 7.00 | 8.1.7 Construction of temporary accommodation and low cost sanitary facility for drilling staff including cost of camp materials viz. cots, tables, chairs, utensils, dresses, safety helmets etc. and dismantling the accommodation after completion of the work all complete as directed. | 1 | Each | 10,308 ₹10,308 |
| 8.00 | 8.1.8 Providing water supply facilities at drilling site all complete as directed.
(a) By installing 1 Nos. of Singur hand pump | 1 | Each | 6,025 ₹6,025 |
| 9.00 | 8.3.1 Drilling with drill bit in overburden portion of soil formation including collection of soil sample at every 3.0 m depth wherever there is a change of strata in sample boxes with distinguishing marks upto the depth of rock formation and withdrawing the drill bit for lowering casing as directed with 245mm to 300 mmm dia drill bit | 22 | Metre | 3,996 ₹87,912 |
| 10.00 | 8.3.2 Casing / sinking / lowering of 200 mm dia MS pipe including cost of pipe and labour charge for casing, welding of joint by welding machine and sinking by drilling rig in portion all complete as directed by department | 22.6 | Metre | 4,051 ₹91,552.60 |
Updated dates
Tender Value
₹52.2 L
EMD Value
₹1.0 L
Closing Date
6 Nov 2025, 4:00 pmClosed
Superintending Engineer(PHE),Ghy Circle
O/o the Superintending Engineer(PHE),Ghy Circle,Bamunimaidan-21
RENOVATION OF DAKHIN GANESH NAGAR PWSS UNDER GUWAHATI DIVISION NO-I UNDER SOPD-G FOR THE YEAR 2024-25
2025_PHED_47868_1
SEPHE/GC/TB-152/Vol-32/25-26
Open Tender
Civil Works
DAKHIN GANESH NAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.0 L
Yes
O/o the Superintending Engineer(PHE),Ghy Circle
23 Dec 2025
7 Oct 2025
7 Nov 2025
7 Oct 2025
6 Nov 2025
14 Oct 2025
14 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
NIT-38.pdf
Tender Documents • 2.24 MB
BOQ_76278.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid