| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.9 LAdmitted-Finance | +4.55% | ₹4.9 L | L1 | Admitted-Finance |
| 2 | L2₹5.0 LAdmitted-Finance | +5.50% | ₹5.0 L | L2 | Admitted-Finance |
| 3 | L3₹5.0 LAdmitted-Finance VILL BADAUN PO ANDORA LOWER TEH AMB DISTT UNA HP | UNA | HIMACHAL PRADESH | +7.00% | ₹5.0 L | L3 | Admitted-Finance |
Tender Value
₹4.7 L
EMD Value
₹4,700
Closing Date
30 Jun 2026, 9:00 amClosed
SR. EXECUTIVE ENGINEER ED HPSEBL RAKKAR UNA
SR. EXECUTIVE ENGINEER ED HPSEBL RAKKAR UN
Tender for augmentation of existing 11/0.4kv,63 kva Sub-Station to 11/0.4kv,100 kva Sub-Station alongwith augmentation of 1pH to 3Ph LT Line and extension of existing 3Ph LT Line at village Tihra Sanhal for SOP 5BHP M/C to HPShiva Project under ESD
2026_HPSEB_137325_2
BID NO- UED/70/2026-27
Open Tender
Electrical Works
90 days
village Tihra Sanhal for SOP 5BHP M/C to HPShiva P
as per sbd
6 documents required · 6 mandatory
₹590
₹4,700
2 Jul 2026
24 Jun 2026
30 Jun 2026
24 Jun 2026
30 Jun 2026
24 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | A) Erection Part | - | - | - | - |
| 1.02 | Erection of LT line. Digging of pit, erection of Steel pole 8 mtr long, erection of C.I X-arm, Shakle insulators, D-iron and filling of pit and remming etc complete in all respect. | 6 | Each | 2,784 | ₹16,704 |
| 1.03 | Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect. | 6 | Set | 1,465 | ₹8,790 |
| 1.04 | Erection of Earthing Set.:- Digging of Pit, Fixing of GI Wire To The Earth System and Filling of Pit etc.complete in all respect. | 6 | Set | 1,088 | ₹6,528 |
| 1.05 | Laying of conductor :- Laying of conductor, striging, sagging and biding with insulator with 7/2.50mm/7/3.15 mm Conductor aug. of New 3-Ph. Re-cond, 7/3.15 mm for 1-Ph. LT complete in all respect., | 2.24 | P/w / P/Kms | 12,784 | ₹28,661.73 |
| 1.06 | Laying of G.I Wire, Stringing, Sagging and binding complete in all respect. | 0.27 | Kms. | 2,681 | ₹731.91 |
| 1.07 | Inspection fees for initial or peroodical inspection for LT Line | 1 | Job | 1,200 | ₹1,200 |
| 1.08 | Providing manual carriage and transportation of departmental materials from Central Store to the work site by the contractor at his own arrangement, including loading, unloading, handling, stacking, labour, tools & plants, transportation vehicles, fuel, watch and ward, and all other incidental charges complete in all respects as directed by the Engineer-in-Charge. | 1 | Job | 5,000 | ₹5,000 |
| 1.09 | ERECTION PART 11/0.4kV,100 KVA Sub-Station | - | - | - | - |
| 1.1 | rection of 100 kVA, 11/0.4 kV Distribution Transformer in place of existing 63 kVA Distribution Transformer by augmentation of the existing Sub-Station on the old structure, including dismantling of the existing transformer, lifting, mounting, fixing, connection of HT/LT jumpers, earthing connections, oil level checking, testing, commissioning, and all labour, tools & plants, tackles, consumables, and incidental charges required for complete and satisfactory execution of the work as directed by the Engineer-in-Charge | 1 | job | 26,000 | ₹26,000 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.10 MB
Tendernotice_2.pdf
PDF • 0.95 MB
BOQ_203438.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid